ATULR. NIR}{AL Engineerc & Contractors 204, Na\ rang Complex, Du,arka Point, Nasik PuDa Road. Dwarka. Nashik - 422 0t I Ph. : (O) 0253-2590144. Date- 03t08/20t7 To Om Sai Buildcon Tapowan Link Road, Kathe Galli, Dwarka Nashik- 42201 I Subject: Certificate ofCost Incurred for Development of Sai Shilp Residency fbr Construction of Pooja building(s)/ I Wing(s) of the I phase (MahaREM Registration Number) situated on the plot bearing C.N. No/CTS No./Survey no. 463 /Plot no.8+9+10 Demarcated by its boundaries (latitude and longitude ofthe end points) to east colony road. To the North 462lp to the South S.T.p.NMCto the West 6.00 colony Road Of Division- Nashik, Village -Nashik, Taluka_ Nashik, District- Nashik ,Pin-42201 I Admeasuring 629.49 sq.Mts.ar.ca being developed by Om Sai Buildcon Ref: MahaRERA Registration Number Sir, I Atul R.Nirmal have undertaken assignment of certifying Estimated Cost fbr the Subject Real Estate koject proposed to be registered under MahaRERA, being Pooja Building (s/ I Wing(s) ofthe I phase situated on the plot bearing C.N. No/CTS No./463l 8+9+10 of Division- Nashik, Village- Nashik, Taluka- Nashik, District- Nashik , Pin-422011 admeasuring 629.49 sq.mts. Arca being developed by Om Sai Buildcon. ATULIT. NIRMAL Engineers & Contraclors 204, Navrang Contplex, Dwarka Point. Nasik Puna Road Drvarka, Nashik - 422 0ll Ph. : (O) 0253-2590144. 03108/2017 l. Following technical professionals are appointed by Owner/pr.omoter : (D IWS/Shri/Smt Sankhla Associates as L.S./Architect (iD IWS/Shri/Smt Reliable Consultancy as SrrucrLrral Consultanr (iii) IWS/ShrilSmt as MEP Consultant (iv) IWS/Sh Smt as Quantity Sulveyor* 2. We have estimated the cost of the completion to obtain OocLrpation Certificate/ Completion Certification, ofthe Civil, Nlljp and allied works. of the Building(s) ofthe project. our estimated cost calculations ar.e based on the drawingVplans made available to us lor the projecr under reference by the Developer and consultants and the schedule of itcrns and quantity for the entire work as calculated by Quantity Surveyor+ appointed by Developer/Engineer, and rhe assumption ol the cost of material, labour and other inputs made by dcveloper, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the buil