Vila s M. Katkade B ECE AMIE FIV, MICI Cons Engineer & Golt Valu€. Cell | 94222 54458 Email . v'laskaLkEde@yahoo.com ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Project wise) To, Jatinbhai Gopalbhai Gol J Flat No. 7, Sneha Residency, Near V irsavarkar Garden, Dindori Road, Nashik Subject : Certificate of percentage of compleiion of construction work of Sai Prerna Apartrnent situated on the plot bearing surve No. 10/3-4, Plot No. i3 demarcated by its boundaries (latitude and longitude of the end points) to the.norlh 9 Mtr. Colony road to the south sr. no. l0/3- PlotM K to the east-12 to the west Plot No. l4 division Makhmalabad village, ^ tal. Nashik-422003 admeasurtng 332.64 sq. mts.Area Being Developed <- by promoters Jatinbhai Gopalbhai Gol Sir. I Vilas M. Katkade hale undertaken assignment of cerlifying Estimated Cost for the Subject Real Estate Project proposed to he registered under Maha RERA. being lBuildine Sai Prema Apartment situated on the plot bearing sr. No. 10/3-4 flnal Plot No. 13 of division Nashik taluka Nashik district Nashik pitt 422003. I . fbllowing technical profess rmais are appointed by Owner Promoter i. Mr. Vilas M. Katkade As. Architect: ii. Mr. Vilas M. katkade Consultant iii. Mr. Vilas M. katkade As Quantity Surveyor SHFADDHA SANKUL-3, OFFICE No. F. OLD GANGAPUFI NAKA. NASHIK. PH.: 25e,0,377 2. We have estinrated the cost of the compietion to obtain Occupation Certihcate; Completion Certificate. of the Civil. MEP and Allied works, of the Building of the project. Our estimated cost calculations are based on the Drawings plans made avaiiable to us tbr the protect under / ref-erence by the Developer and Consultants and the Schedule of items I and quantity for the entire work as calculated by Mr. Vilas M. Katkade I Supervisor appointed by Developer/Bngineer, and the assumptron of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. L 3. We estimate l otal Estimated Cost of completion of the building ot the aforesaid project under reference as Rs 1,30,00000/-The estimated Total Cost of project is with reference to the Civil. MEP and allied works required to be completed ibr the purpose of obtaining occupation certif,rcate completion certificate fbr the building from the Nasik Municipal Corporation. Nasik. Maharashtra being the Planning Authority under whoselurisdiction the atoresard prolect rs being implemented. 4. The Estimated Cost lncurred till date is calculated 19,00000/- (Total of Table A and B). The amount of Estimated Cost Incurred is calculated on z the base of amount of 'l'otal Bstimated Cost. Rs 1.1100000/- 5. The Balance cost of Completion of the Civil MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate :Completion Certiticate fiom Nasik Munrcipal Corporation, Nasik. Maharashtra being the planning Authority is estimated at Rs 0/- ( Total of Tablc A and B) 6. I certity that the Cost of the Civil. MEP and allied work tbr the atbresaid Protect as completed on the ciate of this certrt'icate is as giN en in Table A and B below Building Saiprerana Appartnent Particulars Total Estimated cost of the bulding /wing as r,30,00,000i- on 17.07.2017 or registration of Cost incurred as on 17.0j.2017 (based on the 19,00,000/- Work done in percentage (as percentage of thi estimated cost) Balance cost to be incurred 6ased on r,r r,00,000/- estimated cost) Incurred on additional /extra items as on 17.7.2017 not included in estimated cost (annexure A) Table B Sr. No. Particulars Total estimated cost of the intemal andJFrnat |s. development works including amenities and facilties int eh layout as on date ofregistration is Cost incurred as on 6ased on ttriliunGd cffi Work done in percentage tas percentage of tfre Balance cost to be incurred Oased; Est matrd 5 Cosnt incurred on addifional axtra items as on not Nill included in the estimated cost (Annexure A) 4