Hitesh Rakholiya & Asso. K.Hiri Bunglow, P.No.17,S.No.313/3, Opp.Shiv Mandir, Narhari Nagar, Pathardi, Nashik.Mob.No.9403410513 Date: 5/g/2020 FORM-2 See Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project wise) To Aaradhana Developers, Flat No. 9, Ami Bansi Height, Ashwin Nagar, Opp. Raje Sambhaji Stadium, Nashik - 422009 Subiect: Certificate of Cost Incurred for Development of Amrut Park for Construction Work of 3 Buildingis)/Wingls) situated on the Plot bearing C. N. No/ CTS No. / Survey no. / Final Plot No. 295/2 Plot No. 2+3+4+5+6 demarcated by its boundaries (latitude and longitude of the end points) Plot No. 1 to the North Plot No. 7 to the South 7.5 mtrs Colony Road to the East Adjacent S. No. 295/1 to the West of Division Nashik village Nashik taluka Nashik District Nashik PIN 422009 admeasuring 2625.00 sq.mts. Area being developed by Aaradhana Developers Ref. RERA Registration Number P51600011238 Sir, /we Er. Hitesh Rakholiya have undertaken assigrnment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under RERA, being 3 Building(s)/Wingls) of the Amrut Park Building situated on the plot bearing C. N. No/ CTS No. Survey no. / Final Plot No. 295/2 Plot No. 243+4+5+6 of Division Nashik village Nashik taluka Nashik District Nashik PIN 422009 admeasuring 2625.00 sq.mts. Area being developed by Aaradhana Developers 1. Following technical professionals are appointed by 0wner/ Promoter: M/s/Shri/ Smt Ashok Jamdar as L. S. / Architect (i) M/s/Shri/Smt Ashok Jamdar as Structural Consultant () M/s/Shri/ Smt as MEP Consultant (iv) M/s/Shri /Smt as Quantity Supervisor* HITESH RAKHOLIYA Engineer Regd.No.558 Certificate/ Completion 2. We have estimated the cost of the completion to obtain Occupation estimated cost of the Building(s) of the project. Our Certificate, of the Civil, MEP and Allied works, under reference made available to us for the project calculations are based on the Drawings/ plans entire work as the Schedule of times and quantity for the by the Developer and Consultant and Engineer, and the by Developer/ calculated by Er. Hitesh Rakholiya quantity Surveyor* appointed assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. under 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project the Civil, Cost of project is with reference to reference as Rs. 10,10,00,000/-. The estimated Total for the purpose of obtaining occupation certificate/ MEP, and alied works required to be completed being the Planning completion certificate for the building(s) from the Nashik Municipal Corporation Authority under whose jurisdiction the aforesaid project is being implemented. The amount of Estimated 4. The Estimated Cost Incurred till date is calculated at Rs. 10,10,00,000/ Cost. Cost Incurred is calculated on the base of amount of Total Estimated 5. The Planning cost of Completion of the Civil, MEP and Allied works of the Buildingls) of the subject from Nashik Municipal Corporation project to obtain Occupation Certificate/ Completion Certificate (planning Authority) is estimated at Nil. of the Civil, MEP and allied work for the aforesaid Project as completed on 6.I certify that the Cost the date of this certificate is as given in Table A and B Below. TABLE-A Building/Wing bearing Number "Wing A" (To be prepared separately for each Building / Wing of the Real Estate Project) Sr. No. Particulars Amounts 1 Total Estimated cost of the building/wing as on 31/08/2017 date of Registration is Rs. 3,00,00,000/ 2 Cost incurred as on 31/03/2020 (based on the Estimated cost) Rs.3,00,00,000/ Work done in Percentage (as Percentage ofthe estimated cost) 100 % Balance Cost to be Incurred Nil HITESH RAKHOILIYA EnginT 2 (Based on Estimated Cost) 5 Cost Incurred on Additional/Extra Items as on 31/03/2020 not included in the Estimated Cost il (Annexure A) TABLE A Building/Wing bearing Number "WingB (To be prepared separately for each Building/Wing of the Real Estate Project) Sr. No. Particulars Amounts 1 Total Estimated cost of the building/wing as on 31/08/2017 date of Registration is Rs. 3,00,00,000/ 2 Cost incurred as on 31/03/2020 (based on the Estimated cost) Rs. 3,00,00,000/ 3 Work done in Percentage (as Percentage of the estimated cost) 100 % 4 Balance Cost to be Incurred Nil (Based on Estimated Cost) 5 Cost Incurred on Additional/Extra Items as on 31/03/2020 not included in the Estimated Cost Nil (Annexure A) HITESH RAKHOLIYA Engineer Regd.No.558 TABLE-A Building/ Wing bearing Number "Wing C" (To be prepared separately for each Building/ Wing of the Real Estate Project) Sr. No. Particulars Amounts 1 Total Estimated cost of the building/wing as on 31/08/2017 date of Registration is Rs. 4,10,00,000/- 2 Cost incurred as on 31/03/2020 (based on the Estimated cost) Rs. 4,10,00,000/- 3 |Work done in Percentage (as Percentage of the estimated cost) 100% 4 Balance Cost to be Incurred Nil (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra ltems as on 31/03/2020 not included in the Estimated Cost (Annexure A) Nil TABLE B (To be prepared for the entire registered phase of the Real Estate Project) Sr. No. Particulars Amounts 1 Total Estimated cost of the Internal and External Development Works including amenities and Rs. 10,10,00,000/ Facilities in the layout as on 30/08/2017 date of Registration is HITESH RAKNOLJYA Enginecr Repd.No.558 2 Cost incurred as on 31/03/2020 (based on the Estimated cost) Rs. 10,10,00,000/ 3 Work done in Percentage (as Percentage of the estimated cost) 100 % 4 Balance Cost to be Incurred (Based on Estimated Cost) Nil 5 Cost Incurred on Additional/Extra Items as on 31/03/2020 not included in the Estimated Cost Nil (AnnexureA) Yours Faithfully Signature of Engineer (Licence No ************************** *****) HITESHRAKKOiVA Engineer Regd.No.S58