Vijaya Consultants BUILDING CONSULTING ENGINEERS PLANNERS 10, SIDDHI PARK, NEW PANDIT COLONY, NASHIK. Ph.: (0) 2574602, Mob. : 98220 20644. STRUCTURAL Email ashokjamdar@yahoo.comm CONSULTANTS ASHOK JAMDAR FORM 1 ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Building/Wing wise) To Date: 5/8|2020 Aaradhana Developers, Flat No.9, Ami Bansi Height, Ashwin Nagar, Opp. Raje Sambhaji Stadium, Nashik-422009 Subiect: Cetificate of Percentage of Completion of Construction Work of 1 Bilding(s) 3 wing(s) of the Amrut Park Building /Phase of the Project P51600011238 situated on the Plot bearing C.N. No/ CTS No./Survey no. Final Plot no 295/2-2+3+4+5+6 demarcated by its boundaries (latitude and longitude of the end points) Plot No. 1 to the North Plot No. 7 to the South 7.5 Mtrs Colony Road to the East Adjacent S. No. 7 to the West of Division Nashik village Nashik taluka Nashik District Nashik PIN 422009 admeasuring 2625.00 sq.mts. Area being developed by AARADHANA DEVELOPERS Sir, /we Ashok Jamdar have undertaken assignment as Architect/ Licensed Surveyor of certifying Percentage of Completion of Construction Work of 3 Building(S)/Wing(s) of the AMRUT PARK Building/ Phase ofthe Project, situated on the plot bearing C. N. No/ CTS No. Survey no. / Final Plot no 295/2 to 243+4+5+6 of Division Nashik village Nashik, Taluka Nashik, District Nashik, PIN 422009 admeasuring 2625 sq.mts. Area being developed by AARADHANA DEVELOPERS 1. Following technical professionals are appointed by Owner/ Promoter (i) M/s/Shri/Smt Ashok Jamdar as L. S. / Architect; (ii) M/s/Shri/Smt AshokJamdar as Structural Consultant (i) M/s/Shri/Smt as MEP Consultant (iv) M/s/Shri/Smt . as Site Supervisor Er. Ashok Jamdar Consulting Civil Engineer R. No. 31/39 Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of thls certificate, the Percentage of Work done for each of the building /Wing of the Real Estate Project as registered vide number P51600011238 under RERA is as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building /Wing and Overall Percentage of the work done with respect to each Building /Wing is detalled in the Table B. Table A for A Wing Sr.No Tasks Activity Percentage 1 Excavation 100% 2 Plinth 100% RCC-5 out of 5 number of Slabs of SuperStructure 100% 4 Masonry/ walls 100% 5 InternalPlaster 100% 6 External Plaster, elevation 100% Flooring within Flats/ Premises 100% 8 Door and Windows to each of the Flat/ Premises 100% 9 External plumbing down take lines,CP/ Sanitary Fitting 100% within the Flats/Premises- Electrical Fitting within the Flats/ Premises, 10 Electrical switches and wiring inside apartment 100% 11 Painting 100% Er. Ashok Jamdar Consulting Civil Engineer R. No. 31/39 12 Staircases, Lifts Wells and Lobbies at each Floor level 100% connecting Staircases and LiftsOverhead and Underground Water Tanks 13 Completion of terraces with waterproofing of the Building 100% 14 Installation of lifts 100% 16 Fire Fighting Fittings and Equipment's as per CFO NOC NA 17 Electrical fittings to Common Areas, water pumps,electro- 100% mechanical equipment's 18 Finishing of entrance lobby/s, paving of areas appurtenant 100% to Building, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate Table A for B Wing Sr.No Tasks/ Activity Percentagge Excavation 100% 2 Plinth 100% 3 RCC-5 out of 5 number of Slabs of SuperStructure 100% 4 Masonry/ walls 100% 5 Internal Plaster 100% 5 External Plaster, elevation 100% 7 Flooring within Flats / Premises 100% 3 Door and Windows to each ofthe Flat/ Premises 100% Er. Ashok Jamdar Consulting Civil Engineer R. No. 31/39 External plumbing down take lines,CP/ Sanitary Fitting 100% within the Flats / Premises- Electrical Fitting within the Flats/Premises, 10 Electrical switches and wiring inside apartment 100% 11 Painting 100% 12 Staircases, Lifts Wells and Lobbies at each Floor level 100% connecting Staircases and LiftsOverhead and Underground Water Tanks 13 Completion of terraces with waterproofing of the Building 100% 14 Installation of lifts 100% 16 Fire Fighting Fittings and Equipment's as per CFO NOC NA 17 Electrical fittings to Common Areas, water pumps,electro 100% mechanical equipmentts 18 Finishing of entrance lobby/s, paving of areas appurtenant 100% to Building, Compound Wall and all other requirements as may be required to obtain Occupation/ Completion Certificate Table A for C Wing Sr. No Tasks/ Activity Percentage 1 Excavation 100% 2 Plinth 100% 3 RCC-5 out of S number of Slabs of SuperStructure 100% 4 Masonry/ walls 100% Er. Ashok Jamdar Consulting Civil Engineer R. No. 31/39 5 Internal Plaster 100% 6 External Plaster, elevation 100% Flooring within Flats/ Premises 100% 8 Door and Windows to each of the Flat/ Premises 100% 9 External plumbing down take lines, CP/ Sanitary Fitting 100% within the Flats/Premises- Electrical Fitting within the Flats/Premises, 10 Electrical switches and wiring inside apartment 100% 11 |Painting 100% 2 Staircases, Lifts Wells and Lobbies at each Floor level 100% connecting Staircases and Lifts Overhead and Underground Water Tanks 13 Completion of terraces with waterproofing of the Building 100% 14 Installation of lifts 100% 16 Fire Fighting Fittings and Equipment's as per CFO NOC NA 17 Electrical fittings to Common Areas, water pumps,electro 100% mechanical equipment's 18 | Finishing of entrance lobby/s, paving of areas appurtenant 100% to Building, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate Er. Ashok Jamdar Consulting Civil Engineer R. No. 31/39 TABLE B (Common for A, B and C Wings) Internal & External Development Works in Respect of the project S. No. Common Roads and Facilities, Proposed Percentage of Work Details Amenities (Yes/No) done 1 Side margin pavement NO NA 2 Water Supply YES 100 Connection taken from NMC 3 Sewerage (chamber, sewage lines), YES 100 Done Storm Water Drains 4 Landscaping & Tree Planting NO 0 NA Common area Lighting YES 100 Done 6 Water conservation, Rain water YES 100 Done harvesting 7 Fire protection and fire safety NO NA requirements 8 Electrical meter room, sub-station, YES 0 No separate roomn receivingstation Yours Faithfully Er. Ashok Jamdar Consulting Civil Engineer Er. Ashok Jamdar R. No. 31/39 (License No