Table I (To be prepared for the entire registered phas€ ot the Real Estate P.olect) Sr No Particulars Amounts lRs) 1 Total Est mated cost of the internal and External 6′ 58000/‐ Development、 vo「 ks including arenities and fac‖ tiesin the layout as on 12/08ノ 201フ date of Registration is 2 Cost incurred as on 12/08/2017 1,97′ 400/‐ (Based on the Estimated cost ) 3 work done in percentege 30% (As percentaSe ofthe estimated cost ) 4 Balance Cost to be lncurred 4,60′ 600/‐ (Based On Estimated cost ) 5 Cost incurred on additional/ Extra ltems As on 12108/2017 not included in The [stimated Cost (annexure a) Yours fakhfulけ ′ ぃご3愛宴 Signature Of Engineer Er Harshad bhamare Harshad K. Bhamare chartered Engineer (ucence No AM157896 3) Reg. No. AM157896'3