FORM 1 (See Regulation 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 16/10/2017 To, Shree Builders & Contractors, 1 Prathamesh Residency, Behind Ved Mandir, Nashik Subject: Certificate of Percentage of Completion of Construction Work of Shree Ravi Residency having MahaRERA Registration Number - P51600010553 (only applicable after project registration) being developed by Shree Builders & Contractors Sir, I Mr. Ravindra S Patil have undertaken assignment as Licensed Surveyor of certifying Percentage of Completion of Construction Work Shree Ravi Residency having MahaRERA Registration Number - P51600010553 (only applicable after project registration) being developed by Shree Builders & Contractors. Based on Site Inspection. With respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Tale A Shree Ravi Residency Percentage Sr. of Actual work Tasks /Activity No done (as on the (2) (1) date of certificate) (3) 1 Excavation 100 2 Basements (if any) 100 3 Podiums (if any) NA 4 Plinth 100 5 Stilt Floor 100 6 Slabs of Super Structure 100 7 Internal walls, Internal Plaster, Floorings, Doors and Windows 100 within Flats/Premises 8 Sanitary Fittings within the Flat/Premises 100 9 Staircases, Lifts Wells and Lobbies at each Floor level 100 Overhead and Underground Water Tanks 10 The external plumbing and external plaster, elevation, 100 completion of terraces with waterproofing of the Building/Wing, 11 Installation of lifts, water pumps, Fire Fighting Fittings and 100 Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any other activities TABLE-B Common Areas (Internal & External Development Works) in Respect of the Registered Phase/project number Percentage of Actual Sr. Proposed Work done (as on Common areas and Details No. (Yes/No) the date of Facilities (2) (5) (1) (3) certificate) (4) 1. Internal Roads & Footpaths NO 2. Water Supply YES 100 FROM NMC 3. Sewerage (chamber, lines, YES 100 Septic Tank and Septic Tank, STP) Soak Pit 4. Storm Water Drains NA 5. Landscaping & Tree NA Planting 6. Street Lighting NO 7. Community Buildings NA 8. Treatment and disposal of NA sewage and sullage water 9. Solid Waste management & NA Disposal 10. Water conservation/ Rain YES 100 Rain Water water harvesting Harvesting 11. Energy management NA 12. Fire protection and fire NA safety requirements Percentage of Actual Sr. Proposed Work done (as on Common areas and Details No. (Yes/No) the date of Facilities (2) (5) (1) (3) certificate) (4) 13. Electrical meter room, sub- YES 100 Electrical Meter station receiving station Box 14. Others (option to add more) NA For Ravindra Patil & Associates Ravindra S. Patil Licensed Engineer (License No.341) Date: 16/10/2017 Place : Nashik For Period 31 st August 2017 to 30th September 2017 Agreed and Accepted by: Signature of Promoter Name: Sanjay Manak Patil