ffi&wffffiffiffi& p&TrL & &ss#c$&Yffis CONSULTING ENGINEERS & PLANNERS '1, '5hri', 5hreeji Park, D'souza tolony. Near 6angapur Police Station, college Road, Nashik-5. Ph : (0253) 23 I 1 648, Cell :94222 5154t FORM-2 ENGINEER'S CERTIFICATE Date: 31.03.2020 To, Shree Builders & Contractor, Dsouza Colony, College Road, Nashik-422005. Subject: Certificate of Cost lncurred for Development of Shree Ravi Residencv for Construction of building situated on the Plot bearing 02+03, S.No. 308/4(P). Pathardi Shiwar, Nashik demarcated by its boundaries Remaining 7.50 mtr. wide road to the North, Adi S.No. 30818 to the South, plot No. 1 to the East & Plot No. 4 to the West of Division Pathardi Shiwar, Taluka - Nashik, District - Nashik plN 422O7O admeasuring 2375.99 sq.mts. area being developed by Shree Builders & Contractor. Ref: Maha RERA Registration Number P51600010553 Sir, l, Ravindra Sudam Patil have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under Maha RERA, being building situated on the Plot bearing 02+03. S.No. 308/4(P). Pathardi Shiwar, Nashik, Taluka - Nashik, District - Nashik, PIN 422010 admeasuring 440.00 sq.mts. area being developed by Shree Builders & Contractor. 1-. Following technical professionals are appointed by Owner/Promoter: - (i) Er. Ravindra Sudam Patil as Licensed Engineer (ii) Strucon Designers Pvt. Ltd. as Structural Consultant (iii) Er. SwapnilWagh as Site Supervisor 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by quantity surveyor appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs. 1,48,00.000/- (Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the Nashik Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost lncurred till date is calculated at Rs. 1433.4301/-(Total of Table A and B). The amount of Estimated Cost lncurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s)of the subject project to obtain Occupation Certificate / Completion Certificate from Nashik Municipal Corporation (planning Authority) is estimated at Rs. 2554900/-(Total of Table A and B). 6. I certify that the Cost of the Civil, M EP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below : TABLE A Building called Pandav Enclave Sr. No Particulars Amounts (1) (21 (3) 1. Total Estimated cost of the as on31,/08/2017 date of Registration Rs. 12800000 2 Cost incurred as on 31.03.2020 Rs. 10245100 3 Work done in Percentage (as Percentage of the estimated cost ) 80.04 4 Balance Cost to be lncurred (Based on Estimated Cost) Rs. 25549QQ 5 Cost lncurred on Additional /Extra ltems as on 31.03.2020_not included in the Estimated Cost (Annexure A) Rs. -- TABLE B (to be prepared for the entire registered phase of the Real Estate project) Sr. No. Particulars Amounts (1) l2l (3) 1 Total Estimated cost of the lnternal and External Development Works including amenities and Facilities in the layout as on Rs.2000000 37/08/2017 Date of Registration 2 Cost incurred as on 31.03.2020 Rs.4089201 3 Work done in Percentage (as Percentage of the estimated cost). 204.46 4 Balance Cost to be lncurred (Based on Estimated Cost) Rs. 0 5 Cost lncurred on Additional /Extra ltems as on 31.03.2020 not Rs. 2089201 included in the Estimated Cost (Annexure A). Yours Faithfully, w RAVINDRA S. PATIL - Engineer (Reg. No. 341) , Signature of Engineer. Agreed & Accepted by: #e/c- Signature of Promoter Name: ShriSanjay Patil Date: 31 .A?.2C2A Note: L. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time as per specifications mentioned in the Agreement to sale. 2. (*) Quantity Survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor, who's Certificate of Quantity Calculated, can be relied up on by Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) 9 in case quantity are being calculated by office of Engineer, the name of person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. (**) Balance Cost to be incurred (a) may vary from difference between Total Estimated Cost (1) & actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an Estimated Cost any deviation quantity required for the Development of Real Estate Projectwillresult in an amendmentof the cost incurred/to be incurred. 4. All components of work with specifications are indicative & not exhaustive 5. Please specify if there are any deviations / qualifications. Example: Any deviation in input material used from specifications in Agreement of Sale. TABLE - C List of Extra / Additional / Oeleted ltems considered in the Cost (Which were not parts of the original Estimate of Total Cost) S. No. List of Extra I Additional / Deleted ltems Amount (in Rs.) 1. 2.