RAVINDRA PATIL & ASSOCIATES CONSULTING ENGINEERS & PLANNERS 1,'Shri',5hreeji Park, D'Souza Colony, Near Gangapur Police Station, College Road, Nashik-5. Ph : (0253) 23 1 1 648, Cell :94222 51548 FORM 1 (See Regulation 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 1810412019 To, Shree Builders & Contractors, I Prathamesh Residency, Behind Ved Mandir, Nashik Subject: Certificate of Percentage of Completion of Construction Work of Shree Ravi Residency having MahaRERA Registration Number -P51600010553 (only applicable after project registration) being developed by Shree Builders & Contractors Sir, I Mr. Ravindra S Patil have undertaken assignment as Licensed Surveyor of certifying Percentage of Completion of Construction Work Shree Ravi Residency having MahaRERA Registration Number -P51600010553 (only applicable after project registration) being developed by Shree Builders & Contractors. Based on Site Inspection. With respect to Layout leach of the Building/Wi.ng of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Tahle A Shree Ravi Residencv Percentage Sr. of Actual work done Tasks /Activit"v No (2) , (ns on the date of (1) certificate) (3) 1 Excavation t00 2 Basements (if any) r00 3 Podiums (if any) NA 4 P nth 00 5 St t Floor 00 6 Slabs of Super Structure 00 7 Internal walls, Internal Plaster, Floorings, Doors and r00 Windows within Flats/Prem ises 8 Sanitary Fittings within the Flat/Premises r00 9 Staircases, Lifts Wells and Lobbies at each Floor level r00 Overhead and Underground Water Tanks t0 The external plumbing and external plaster, elevation, t00 completion of terraces with waterproofing of the Building/Wing, lt Installation of lifts, water pumps, Fire Fighting Fittings 100 and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment ICRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any other activities TABLE-B Common Areas (Internal & External Develonment Works) in Resrrect of the Registered Phase/proiect number Percentage of Sr. Proposed Actual Work done Common areas and Details No. (Yes/I.,lo) (as on the date of Facilities (2) (s) (l) (3) certificate) (4) I Internal Roads & NO Footpaths 2. Water Supply YES r00 FROM NMC 3. Sewerage (chamber, YES t00 Septic Tank and Soak lines, Septic Tank, STP) Pit 4. Storm Water Drains NA 5. Landscaping & Tree NA Plantins 6. Street Liehtins NO 7. Community Buildings NA 8. Treatment and disposal NA of sewage and sullage water 9. Solid Waste NA management & Disposal 10. Water conservation/ YES r00 Rain Water Rain water harvesting Harvesting il Energy management NA 12. Fire protection and fire NA safety requirements Percentage of Sr. Proposed Actual Work done Common areas and Details No. (Yes/|.{o) (as on the date of Facilities (2) (s) (1) (3) certificate) (4) 13. Electrical meter room, YES r00 Electrical Meter Box sub-station receiving station 14. Others (option to add NA more) For Ravindra Patil & Associates at) s. PATrL YYz*IITNDRA w Engineer (Reg. No. 341) Ravindra S. Patil Licensed Engineer (License No.341) Date: 1810412019 Place : Nashik For Quarter April to June 2019 Agreed and Accepted by: 49 Signature of Promoter Name: Sanjay Manak Patil