umesh bogul orchitect first floor, podmo-vishwo center, old pondit colony, noshik' tel.- 0253 2579667. e.moil - orumeshblO@gmoil.com ARqHITECT',S CERTT FTCATE Date: 30112/2019. To The "Mls Rajashree Construction Partnershipfirm", 307, Padma-Vishwa Center, Oid Pandit Colony, Nashik" Subject: Certificate of Percentage of Completion of Construction Work of "OYESTER C, D, E WlN6", the Project situated on the s.NO. 233/2lBl1. Demarcated by its boundaries {latitude and longitude of the end points - 20'01'38.67"N, 73"49',42.83"8) On or towards East ADJ. S.NO. 23312/8/1(?) On or towards West ADJ. S.NO. 23311/Blu4 On 0r towards South 7.50 m. wide road & P.no.10,11,16 On oi'towards North ADJ. OPEN SPACE of Division Nashik, Taluka- NASHIK, Dist- NASHIK-422003 admeasuring 6000.00 SQ.M" Area being developed by "M/s Rajashree Construction Partnership firm." Sir, I Ar, UMESH BAGUL have undertaken assignment as Architect certifying Percentage of Conrpletion of Construction Work of ttrECtygSfER C,D, E WING" the Project , situated on the S.NO. 23312/8/1.. Of Division Nashik, Tal- NASHIK, Dist- NASHIK-422OOg admeasuring 6000.00 SQ.M. area, being developed by "M/s Rajashree Construction Partnership firm." 1. Following technical professionals are appointed by Owner / Promoter :- i. Mr. Umesh Bagulas Architect ii. Mr. Prasanna Bhore as Structural Consultant iii. Mr. Pankaj Pawar as Site Supervisor Based on Site lnspection, with respect to each of Wing of the aforesaid Reai Estate Prr:ject, I certify that as on the date of this certificate, the Percentage of work done for each of Wing of the Real Estate Project is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Ar. Umesh Bagul 'cAr93/15997 Page 1 of3 umesh bogul orchitect fint floor, podmo-vishwo center, old pondit colony, noshik. tel.- 0253 2571667. e.moil - orumeshblO@gmoil.com Table A ,,OYESTER C, D, E WING" Sr. No Tasks / Activity Percentage of wort done {%} WING € WIN6 D WING E L Excavation 100 100 0 2 Plinth 100 100 U 3 number of Podiums N.A. N.A. N.A. 4 Stilt Floor 100 100 0 5 Slabs of super Structure 100 100 n 6 lnternal walls, lnternal Plaster , Floorings within Flats I 30 100 0 lgqises, Doors Windows to each of the Flat / premises Sanitary Fitting within the Flat / premises, Electrical 0 100 0 Fittings within the Flat / Premises I Staircase , Lifts Well and Lobbies at each Floor levei qn 100 0 connect!ng Staircase and Lifts, Overhead and Unde rground Water Tanks 9 The External plumbing and external plaster, elevation , ,,^ 100 0 completion of terraces with waterproofing of the Building/ Wing, 10 lnstallation of lifts, water pumps, Fire Fighting Fitting and 0 0 0 Equipment as per cEo Noc, Electrical Fitting to common Areas, electro , mechanicai equiprnent, Compliance to conditions of environment / CRZ NOC, Finishing to entrance lobby / s, Plinth protection , paving to areas appurtenant to Building/Wing, Cornpound Wail and all other requirements as may be required to obtain ()]:5upation I Completion Certificate Ar. Umesh Bagul cA/93/1599t Page 2 of 3 a umesh bogul orchitect first floor, podmo-vishwo center, old pondit colony, noshik. tel.- 0253 2579667. e.mqil - orumeshblO@gmoil.com TABLE- B 5. no. Common areas and Proposed { Yes/ Percentage of Deta ils Facilities, Amenities No) work done 1". lnternal Roads & Footpaths No 0 Not Apolicable 2. Water supply YES 0 To be obtained from trlMC on completion of the proiect 3, Sewerage { chamber, lines, YES 50 Work in progress septic tank, STP) +. Starm Water Drains No 0 NA c L:ndscaping & Tree yes 0 As per NMC Plantins requirement. 6. Street Lighting No 0 NA 7. Community Buildings No n NA Treatment and disposal of yes 0 As per NMC sev/age and sullage water requ irement 9. Solid Waste management yes n As per NMC & Disposal requirement 10. Water conse rvation, rain Yes 0 Work yet t0 stari Water harvesting 11. Energy managernent No 0 NA 1.2. Fire protection and fire No 0 NA safetv requirements 13. Electrical rneter rocrn, sub- Yes 0 Construction of station, receiving station meter room yet to start 1"4. Open Parkine Yes 0 Work yet to start Yours Faithfully Signature & name AR. UMESH BAGUL (License No. CA/93/L5997) Ar. Umesh Bagul Page 3 of 3 cA/93/15997