umesh bogul orchitect first floor. podmo-vishwo center, old pondil colony, noshik' tel.- 0253 2579667 . e.moil - orumeshb I O@gmoil.com ARCH TTECT',S CERT! FTCATE Date: 2110612019" To The"M/sRajashreeConstructionPartnershipfirm",30T, Padma-Vishwa Center, Old Pandit Colony, ltlash ik. Subject: Certificate of Percentage of Completion of Construction Work of "OYESTIR C, D, E WING', the Project situated on the s.No. 233/2lB/1. Demarcated by its boundaries {latitude and longitude of the end points - 20"01'38.67"N, 73"49',42"93"8) On or towards East ADJ " S. N 0. 233 / 2 / B/ t(Pl On or towards West ADJ. s.NO. 233/3./sl Ll4 0n or towards South 7.50 m. wide road & P.no.10,11-,L6 0n or towards North ADJ. OPIN SPACE of Division Nashik, Nashik, Taluka- NASHIK, Dist- NASHIK-422003 admeasurinC 6000.00 SQ.M" iin total ) Area being deveioped hy "Mfs Rajashree Construction Partnership firm." Sir, lAr. TJMESH BAGUL have undertaken assignment as Architect certifying Percentage of Completion of Construction Work of the "OYESTER C,D, E WING" the Project, situated on the S.NO. 233/2lB/L Af Division Nashik, Nashik, Tal- NASHIK, Dist- NASHIK-422003 admeasuring 6000.00 SQ.M. (in total) area, being developed by "M/s Rajashree Construction Partnership firm"" 1. Following technical professionals are appointed by Owner / promoter :- i. Mr. Umesh Bagulas Architect ii. Mr. Prasanna Bhore as Structural Consultant iii. Mr. Pankaj Pawar as Site Supervisor Based on Site lnspection, with respect to each of Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of work done for each of Wing of the Real Estate Project ls as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. UlvlESH P. B'\GUL B.Arch. cAl93lL5997 105+106, Padma-Vishwa Centr€, Page 1of 3 umesh bogul orchiiect first floor, podmo-vishwo center, old pondit colony, nqshik. tel.- 0253 2579667. e.mqil - orumeshblO@gmoil.com Table A .OYESTER C, D. E WING' 5r. No Tasks / Activity Percentage of work done (%) WING C WING D WING E l- Excavation i.00 100 0 L Plinth 100 100 0 3 number of Podiums N,A. N,A" N.A. 4 Stilt Floor 100 100 0 5 Slabs of super Structure 100 100 0 6 lnternal walls, lnternal Plaster , Floorings within Flats / 0 100 0 Premises, Doors Windows to each of the Flat / Premises 7 Sanitary Fitting within the Flat y' Premises, Electrical 0 100 0 Fittings within the Flat / Premises I Staircase , Lifts Well and Lobbies at each Floor level 0 75 0 connecting Staircase and Lifts, Overhead and Underground Water Tanks 9 The External plunrbing and external plaster, elevation , 0 100 completion of terraces with waterproofing of the Building/ Wing, 10 lnstallation of lifts, water pumps, Fire Fighting Fitting and 0 0 0 Equipment as per CEO NOC, Electrical Fitting to Common Areas, electro, mechanical equipment Compliance to conditions of environment / CRZ NOC, Finishing to entrance lobby / s, Plinth protection , paving to areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate \: UIUIE$H P. B'\GUL B.Arch. cA.l93lts9e7 105+ 106, Padma-Vishwa Centre, Old Pandit Colony, Nashik-,|22 ffii. Page 2 of 3 umesh bogul orchitect first floor, podmo-vishwo center, old pondit colony, noshik. tel.- 0253 2579667. e.moil - orumeshblO@gmoil.com TABLE- B lnlernal & External Develooment wprks in respect of the entire "OYESTER C, D, E WING" S. no. Common areas and Proposed { Yes/ Percentage of Details Facilities, Amenities No) work done I I. lnternal Roads & Footpaths No n Not Applicable 2. Water supply YES 0 To be obtained from NMC on cornpletion of the proiect 3. Sewerage ( chamber, lines, YES 50 Work in progress septic tank, STP) 4. Storm Water Drains No 0 NA 5. Landscaping & Tree yes 0 As per NMC Plantins requirement. 5. Street Lighting No 0 NA 7. Cornmunity Buildings llo 0 NA 8. Treatment and disposal of yes 0 As per NMC sewage and sullage water requirement 9. Solid Waste management yes 0 As per NMC & Disposal requirement 10. Water conservation, rain Yes 0 Work yet to start Water harvesting 11. Energy management No o NA 1.2. Fire protection and fire No 0 NA safety requirements _l-5. Electrical meter room, sub- Yes 0 Construction of station, receiving station meter room yet to start t4" 0pen Parking Yes 0 Work yet to start Yours Faithfully Signature & name AR. UMESH BAGUL (License No. CAl93/15997) U]vlEST{ P. BAGUL B.Arch. cfile3ltsegT Page 3 or 3