umesh bogul orchitect first floor. podmo-vishwo center. old pondit colony, nqshik. tel.- 0253 257 I 667 . e.moil - orumeshb I O@gmoil.com ARCH TTECT',S CE RIIFT CATE Date:21106lZA]9. To The "M/s Rajashree Construction Partnership firm", 307, Padma-Vishwa Center, Old Pandit Colony, Nashik. Subject: Certificate of Percentage of Completion of Construction Work of "OYESTIR C, D, E lArlNG", the Project situated on the S.NO. 233/2/B/1. Demarcated by its boundaries {latitude and longitude of the end points * 20"01'38.67"N, 73"49'42.83"E| On or towards East ADJ. s.No. 233/2lB/uql On or towards West ADJ. s.NO. 23311/B/Ll4 On or towards South 7.50 m. wide road & P.no.10,11,1"6 On or towards North ADJ. OPEN SPACE of Division Nashik, Nashik, Taluka- NA,SHIK, Dist- NASHIK-422003 admeasuring 6000.0O SQ.M. {in total ) Area being developed by "Mfs Rajashree Construction Partnership firm." Sir, I Ar. UMESH BAGUL have undertaken assignment as Architect certifuing Percentage of Completion of Construction Work of the "OYESTEB C,D, E WlN6" the Project , situated on the S.NO. 23312l8lL Af Division Nashik, Nashik, Tal- NASHIK, Dist- NASHIK-422003 admeasuring 6000.00 SQ.M. ( in total) area, being developed by "M/s Raiashree Construction Partnership firm." 1. Following technical professionals are appointed by Owner / Promoter :- i. Mr. Umesh Bagulas Architect ii. Mr. Prasanna Bhore as Structural Consultant iii. Mr. Pankaj Pawar as Site Supervisor Based on Site lnspection, with respect to each of Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of work done for each of Wing of the Real Estate Project is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. I.'lvlESH P. BAGUL B.Arch. cA/e3/15997 105+105, Padma-Vishwa Centre, Page 1of 3 umesh bogul orchitect first floor. podmo-vishwo center, old pondit colony, noshik. tel.- 0253 2579667. e.moil - orumeshbl0@gmoil.com Table A .OYESTER C. D. E WING" Sr. No Tasks I Activity Percentage of work done {%} WING C WING D WING E 1 Excavation i"00 100 0 2 Plinth 100 100 0 3 number of Podiums N.A. N.A. N.A. 4 Stilt Floor 100 100 0 5 Slabs of super Structure 100 100 0 6 lnternal walls, lnternal Plaster , Floorings within Flats / 0 100 0 Premises, Doors Windows to each of the Flat / Premises 7 Sanitary Fitting within the Flat / Prernises, Electrical 0 100 0 Fittings within the Flat / Premises o 0 Staircase , Lifts Well and Lobbies at each Floor level 0 75 0 connecting Staircase and Lifts, Overhead and Underground Water Tan ks 9 The External plumbing and external plaster, elevation , 0 100 0 completion of terraces with waterproofing of the Buildingl Wing, L0 lnstallation of lifts, water pumps, Fire Fighting Fitting and 0 0 0 Equipment as per CEO NOC, Electrical Fitting to Common Areas, electro, mechanical equipment Compliance to conditions of environment / CRZ NOC, Finishing to entrance lobby I s, Plinth protection , paving to areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate UtvlESH P. BAGUL B.Arch. cA.l93lLs997 19It 10q, Padma-Vishwa Centre, Old Pandit Colony, Nashik-,l22 00i, Page 2 of 3 umesh bogul orchitect first floor. podmo-vishwo center, old pondit colony, noshik' tel.- 0253 2579 667. e.moil - orumeshbl O@gmoil.com ARCH ITECT'S CE RTI FICATE Date:2L/A6{2OL9. To The "M/s Rajashree Construction Partnership firm", 307, Padma-Vishwa Center, Old Pandit Colony, Nashik. Subject: Certifrcate of Percentage of Completion of Construction Work of "OYESTER C, D, E WlNG", the Project situated on the S.NO. 23312/8/1. Demarcated by its boundaries (latitude and longitude of the end points - 20"01"'38.67"N, 73"49'42,93"81 0n or towards East ADJ. S. N O. 233 / 2 / Bl ttPl 0n or towards West ADJ. s.NO. 233/t/s/Ll4 On or towards South 7.50 m. wide road & P.no.10,11,16 0n or towards North ADJ. OPEN SPACE of Division Nashik, Nashik, Taluka- NASHIK, Dist- NASHIK-422003 admeasuring 6000.0Q 5Q.fU. {in total ) Area being developed by "Mfs Rajashree Construction Partnership firm." Sir, I Ar. UMESH BAGUL have undertaken assignment as Architect certifying Percentage of Completion of Construction Work of the "OYESTER C,D, E WlN6" the Project , situated on the S.NO. 23312l8lL. Af Division Nashik, Nashik, Tal- NASHIK, Dist- NASHIK-422003 admeasuring 6000.00 SQ.M. ( in total) area, being developed by "M/s Rajashree Construction Partnership firm." 1. Following technical professionals are appointed by Owner f Promoter :- i. Mr. Umesh Bagulas Architect ii. Mr. Prasanna Bhore as Structural Consultant iii. Mr. Pankaj Pawar as Site Supervisor Based on Site lnspection, with respect to each of Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of work done for each of Wing of the Real Estate Project is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. U-!vIESH P. BAGUL B.Arch. cA/e3/1s997 105+105, Padma-Vishwa Centre, Page 1of 3