umesh bogul E orchiiect first floor, podmo-vishwo center, old pondit colony' iJ' ozss zszr667. e.moil - orumeshblO@gmoil'com noshik' Forry1_1l ARCH ITECT,S CERTI FICATE Date: 05/12 l2lt7 To ,,M/s Raiashree Construction Partnership firm", 307, Padma-Vishwa Center, Old The Pandit ColonY, Nashik. D, E WING", Subject: Certificate of Percentage of Completion of Construction Work of "OYESTER C, the Project situated on the S.NO.2?3l2lBlt. Demarcated by its boundaries (latitude and longitude of the end points - 20'01'38.67"N, 73"49',42.83"E| On or towards East ADJ. S.NO. 233l2lBlt(Pl On or towards West ADJ. S.NO. 2331t/Bltl4 On or towards South 7.50 m. wide road & P.no.10,11,15 On or towards North ADJ. OPEN SPACE of Division Nashik, Nashik, Tatuka- NASHIK, Dist- NASH|K422003 admeasurine 6m0.m SQ.M. (in total ) Area being developed by "M/s Rajashree Construction Partnership firm." Sir, I Ar. UMESH BAGUL have undertaken assignment as Architect certifying Percentage of Completion of Construction Work of the "OYESTER C,D, E WING" the Project , situated on the S.NO.23tl2lglt'Of Division Nashik, Nashilq Tal- NASHIK, Dist- NASH|K422003 admeasuring 6111n.111, SQ.M. ( in total) area, being developed by "M/s Rajashree Construction Partnership firm." L. Following technical professionals are appointed by Owner / Promoter :- i. Mr. Umesh Bagulas Architect ii. Mr. Prasanna Bhore as Structural Consultant iii. Mr. Pankaj Pawar as Site Supervisor Based on Site Inspection, with respect to each of Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of work done for each of Wing of the Real Estate Project is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. .ry UI4ESH P. BAGUL 8.Arch. cAlg3lrs997 105+ 106. Paclma-vishwr Ccntre, Otd Pandit Colony, Nashlk-422 001. page l of 3 umesh bogul orchitect I--] fint floor, podmo-vishwo center, old pondit colony. noshik. tel.- 0253 2579667. e.moil - orumeshblO@gmoil.com TableA "OYESTER C. D. E WING" Sr.No Tasl6/Actiuity Peraentage of work done (%) wtl{G c WING D WING E 1 Excavation 0 100 0 2 Plinth 0 100 0 3 number of Podiums N.A. N.A. N.A" 4 Stilt Floor 0 100 0 5 Slabs of super Structure 0 80 0 6 Internal wallq Internal Plaster, Floorings within Flats / 0 0 0 Premisgs, Doors Windows to each of the Flat / premises 7 Sanitary Fitting within the Flat / premises, Electrical 0 0 0 Fittings within the Flat / Premises I Staircase, Ufts Well and Lobbies at each Floor level 0 0 0 connecting Staircase and Liftts, Overhead and Underground Water Tanks 9 The External plumbing and external plaster, elevation, 0 0 0 completion of terraces with waterproofing of the Building/WirU, 10 lnstallation of lifu, water pumps, Fire Fighting Fitting and 0 0 0 Equipment as per CEO NOC, Electrical Fitting to Common Areas, electro, mechanical equipmen! Compliance to conditions of environment / CRZ NOC, Finishing to entritnce lobby/ s, Plinth protection , paving to areas appurtenantto Building/VVing Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certifi cate UIIESH P. BAGUL LArch. cA193115997 105+10( Padma-Vishwa Centre, Old Panclrt Colony, Nrshlk-{22 001. Page 2 of 3 r umesh bogul orchitect first floq, podmo-vi*rwo center, dd pondf cdony, noshik. tel.- O253 2579667. e.moil - onlmeshbl0tOgmoil.com TAB]"E. B Internal & External Develooment works in resoect of the entire "OYESTER C. D. E WING" S. no. Common areas and Proposed ( Yes/ Percentage of Details Facilitieq Amenities Nol work done 1. Internal Roads & Footpaths No 0 Not Applicable 2. Water supply YES 0 To be obtained from NMC on completion of the project 3. Sewerage ( chamber, lines, YES 0 As per NMC septic tank, STP) requirement. 4. Storm Water Drains No 0 NA 5. Landscaping & Tree yes 0 As per NMC Planting requirement. 6. Street Ughting No 0 NA 7. Community Buildings No 0 NA 8. Treatment and disposal of yes 0 As per NMC sewage and sullaee water requirement 9. Solid Waste management yes 0 As per NMC & Disposal requirement 10. Water conservation, rain Yes 0 Work yet to start Water harvesting 11. Energy management No 0 NA t2. Fire protection and fire No 0 NA safety requirements 13. Electrical meter room, sub' Yes 0 Construction of station, receiving station meter room yet to start L4. Open Parking Yes 0 Work yet to start Yours Faithfully Signature & name .& AR. UMESH BAGUL (License No. cA/93/15997) UM€sH P. SAGUL LArch. c^193115997 10i+ 10t, Padma-vishwa Centre' 001' d; ;;;;1, Cotonv, Nashlk-422 page 3 of 3