3 . 筍 50PAN K.PARDESHI CONSULIINθ ENθ INEER Plo十 noア opp New courlSinnor′ FORM - 2 uNc,,{ffiiXi%'ilil'.%"', (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project wise) Date: 15.10.2024 To, Mr. Girish Sudhakar Thakur 1,001, Gold Craft Society Ghodbandar Road, Hiranandani Estate, Thane-400607. Subject Certificate of Cost Incurred for Development of "Shree Gaianan Industrial Layout"having MahaRERA Registration Number: P51600010412being developed by Girish Sudhakar Thakur. Sir, 1. I Sopan Krishna Pardeshi have undertaken assignment of certifying Estimated Costfor"Shree Gaianan Industrial Layout" having MahaRERA Registration Number: P51600010412being developed by Girish Sudhakar Thakur. 2. We have estimated the cost of civil. MEP and allied works required for completion ofthe apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreement of sale.our estimated cost calculations are based on the drawings/plans made available to us for the project under reference by the Developer / consultants.The schedule of items and quantity required for the entire work as calculated by Quantity Surveyor* appointed by Developer/Engineer, the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us to ascertatn / confirm the above analysis given to us. 3, We estimate Total Estimated Cost of completion of the aforesaid project under reference at Rs. 1,50,00,000/- (Total of Table A and B)at the time of Registration. The estimated total cost of project is with reference to the Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & external works, as per specifications mentioned in agreement of sale and for the purpose of obtaining occupation certificate/completion certificate for the building(S) / Wing(S) / Layout / Plotted Development from the Nashik Metropolitan Region Development Authority being the planning authority under whose jurisdiction the aforesaid project is being implemented. The estimated Cost Incurred nlL 21.12.2017 is calculated at Rs.1,43,51,,083/- (Total of Table A and B). The amount of Estimated Cost Incurred is calculated on the basis of input materials / services used and unit cost of these items. 5, The Balance cost of Completion of the Civil, MEP and Atlied works for completion of the apartments and proportionate completion of internal& external works, as per specifications mentioned in agreement of sale, of the project is estimated at Rs.6,48,917 /- (Total of Table A and B). 6. I certify that the cost of the for the apartment and proportionate internal & external works, as per specifications mentioned in agreement of sale, of aforesaid Project as completed on the date of this certificate is as given in Table A and B Below: Table A Building/Wing/Layout/Plotted Development bearing Number or called Shree Gajanan Industrial Layout Sro No。 Particulars Amounts (In Rs.) 1 Total Estimated cost of the Rs.1′ 50′ 00′ 000.00/― building/wing/Layout/Plotted Developments as on 2't.12.2017 2 Cost incurred as on 21,.12.2017 Rs.1′ 43′ 51′ 083.00/― 3 Work done in percentage (as percentage of the estimated 95.67% cost) 4 Balance Cost to be Incurred**(BasedOn Estimated Cost) Rs.6′ 48′ 917.00/― 5 Cost incurred on additional / Exha Itemsnot included in NA the Estimated Cost (Table-C) Table B Internal & External Development Works [n Respect of the Registered Phase Sr.No. Particulars Amounts (In Rs.) Total Estimated cost of the Intemal and External Development works including amenities and facilities in the layout 2 Cost incurred 3 Work done in percentage (as percentage of the estimated cost) 4 Balance Cost to be Incurred (Based On Estimated Cost) 議器 糧:翻tT」 /Ex:フ 堵業ぜ 5 ded m tte ヽ Yours fai仕 ぜtuy′ 嗜 ク Na K■ ishna Pard( Local Authority licence no.STATE/R/2023/ Agreed and Accepted by: For, Gajanan Developers signature or promoter I sllREE 0"6{&EVEL0PERS Name: Gtuish Sudhakar Thakur \y/. Designation: Proprietor iirisll S. Tharur Date415.10.2024 Proorietor Place: Thane Note: 1' The scope of work is to complete Registered Real Estate Project as per Drawings approved from time to time and as per specifications mentioned in agreement of sale. 2. (-)Quantity suNey can be done by office of engineer or can be done by an independent Quantity Su*eyor, w'hose Certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked(1)and in case quantity are being calculated by the Engineer, the name of the person in ihe office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked(*). 3. (**)Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cosL any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred/ to be incurred. 4. All components of work with specifications are indicative are not exhaustive. 5. Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specification in agreement of sale. Table C List of Extra/ Additiona/ Deleted Items considered in cost were not of the estimated of Total Sr No. List of Extra/ AdditionaV Deleted items Amount (In Rs.) Not Applicable