MANISH NAVAPARIA B.E.CIVIL CONSULTING ENGINEER & BUILDING PLANNER Varun Bu . Atul , Ambad Link Road, Nashik - 422010 FORM-2 [see Regulation 3] E NGII{E ER' S CERTTFICAJT nate:..t I |.8. [*o :.... r To, Dineshbhai Mavjibhai Viramgama Flat No-6; Gajanan Park, B/H Gauri-shankar mangal karyalay, Ambad Link Road, Nashik422010 Subiect Certificate of Cost Incurred for Development of Dineshbhai Mavjibhai Viramgama : "Shiv Shakti Row House" (MahaRERA Registration Number) situated on the plot No- 1,2,11 to 19, S.No.544 &540+541+54?1846 & 543+544(p), demarcated by its boundaries existing 6.00 MTR Road to the Norffr, p.No-20 a ia to the southj extisting 6.00 MTR to the East, Existing 7.50 MTR Road to the West, Adgaon shiwar, Taluka Nashik Dist. Nashik,pin.422003, admeasuring.1903.29 Jq.mts.& F.s.l. Area 1899.44 sq.rr.arca being developed by ,,Dineshbfiai Mavjibhai Viramgama" Sir, I Er Manish Ratilal Navaparia have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Proiect proposed to be registered under MrhaREiiA bearing plot No- 1,2,111o 19, S;No. 544 &540+i41+542+546 & 543+544lpl, Adgaon Shiw"ar, Taluka Nashik Dist. Nashik, pin.422oo3, admeasuring 190i.29 sq.mts.& F.s.t. Area 1899.44 sq.m. area being developed by ,,Dinishbhal naavjibhai viramgama,, Followirig technical professionals are appointed by owner promoter :- / MANISH NAVAPARIA fionsultino [nninser & Buildino Planner (') M/s. Manish Ratilal Navaparia as L.S "/ Architect (ii) M/s. Manish Ratilal Navaparia as Structural Conlultant. 1. We have estimated the cost of the completion to obtain Occupation Cerltficate/ Completion CertificaG, of the Civil MEP and Allied.wor$r, of the proiect. Our estimated cost calculations are based on the Drawings/plans made available to us for the proiect under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by quantity Surveyor" and the assumption of the cost of materiaf labour arid other inputs made by developer, and the site inspection carried out by us. 2. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid pioject under reference as Rs. 3,7O210xJ[ /-(Total of Table A and B). TypE " N' - 1F4,67,0m/ -. TWe "Y' - 1,20,00,000 / -, Type "c" - 95,54,A00/-. The estimated Total bost of project is with refurence to the Civil MEP and allied woJks required to be completed for the pulpo$e of obtaining occupation certificate / completion certificate for the building from the NMC being the Planning Authority under whose ;'urisdiction the aforesaid project is being implemmted. 3. The,Estimated Cost Incurred till date is calculated at Rs.143SNO/- Total of Table A )-. The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 4. The Balance cost of Completion of the Civil MEP and Allied works of the Building of'the subl'ect project to obtain Occirpation Certificate / Completion Certificate from NMC (planning Authority) is estimated at Rs. g,SS,SSpUJ,l- ( Total of Table A ). 5. I certify that the Cost of the Civil, MEP and allied work for the aforcsaid Project as completed on the date of this certificab is as given in Table A and B below : *=ffi*;" NilANISH NAVAPARIA {)onsulting Engineer & Building Plannel F,&ET,EA Building named Shiv Shakti Ito.,ry House Type,, A,' Sr. No Farticrrtrars A*r*u*i:; t,.,,i! TS*a l, Ss,*isn,ili*d:c*rt *{,&* t$.*. .,i.1ff :eh:tl j$ 2Ci 7 eiate r,i l?egis*rition is ' {ts;r3.5.q,6f,,,r 'l- f'osi ir':cLirleei as ** 3'l Juli,2i;"i7 fbasect *n Lhe 2 tlqi-),/- Esiirrral+r1 i,'*si l, W*l'k d**e *r lre.rewta#tA_"- p a;$H,geffi 3 Sry" 6eianc* [.csi ir.r bt i]lcurred{Based rn Estimated 4 Ci:st ) Lcst lnrcirre,,l an Adriitional.fExtra lienrs as on :;.}',: 3l .|u11,21)'!7 not rn*luded ir.:tiie Esunrar"ec! Ccii {+"$ {Annc,:.ri*$A,} r,l','".' ,Ir ,,,l l,'.,' ,,,,' ...u".1",,' TABI,E A Building named Shiv Shakti Iiow House Type,,B,, 5r. Nc Partie rciars A;:lr-iirraig t , Ccsl *':c*rred i;s ol: 31 Julv 3i)17 ibased an the Estim;lted l*st i l?s"01- ,g= {}, ; ii.:.i== Sala*c* L.ost tc lre lncurrerlqBasecl cn Estimate_r-t 4 R s. 1 " 2lj,illr,ii*t) I - Cir-:st) (ost lni urr*C r:'.r **elificn*i/ExtG]ffiil$ o{^r 5a- , 3 J {ut,r,**l f ,n*t,l**:fuderi *rn {Axx+r*ig A}=- ,.,r , r,fiiqru.e* ..t}rn . ,. !=r5=F, IUANISH NAVAPARIA Consulting Engineer & Building Planner TABTE A Building narred Shrv Shakti i{ow l-{ouse'lype"C' Sr. No Farticu*;*rs &use*Etre** Ytr" $5,S.t;{}S.lr;'- :: l : .,:l 2 I?q 1.:1'. 1i::.]'- .."'....1-*.-..]T- s x:il' ("r.i, fidiJ i - i..r:i. i0 iir,: r ir. rr frg-i i Sasi:r1.*rr Xstlr:na ied r L.()9i! csrxr {r,riu}rc* *a' E* *-ffi TABLE B Building named Sh.iv Shakii Row House Arn*u*is Its.ill- i\,lAlilSH NAVAPARIA i.al. hl MAN RIA Consulting fngineer & Building Plarmer Stamp & Signature of Engineer (Licence No.. 9.$2.'..; *Not" 1. The scope of work is to complete entire Real Estate project as per drawings approved from time to tinrc so as to obtain occupation Certificate / Completion Certif ic ate (") Quantity survey can be done by office of Engineer or can be done by an independent Quantity surveyor, whose certificate of quantity ialculated can be relied upon by the Engineer. In case of independent quantity.surveyor being appointed by Developer, the name has to be mentioned at the place marked f) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. The estimated cost includes all labour, materia! equipment and machinery required to carry out entire work. 4. As this is afl estimated cost, any deviation in quantity required for development of the Real estate project will result in amendment of the cost incurred/to be incurred. 5. All components of work with specifications are indicative and riot exhaustive. Annexure A Lisi of Extra / Additional ltems executed with Cost (which were not part of the original Estimate of Total Cost)