Table B Internal and External Development Works in respect of the Registered Phase Sr. No. Particulars Amount (In Rs.) (1) 1 Total Estimated Cost of the Building/Wing/Layout 1055000.00 Plotted Development as on date of Reqistration is 2 Cost incurred as on date of certificate 833450.00 3 Work done in Percentaqe (as percentaqe of the estimated cost) 79.00 4 Balance Cost to be lncurred**(Based on Estimated Cost) 221550.00 5 Cost Incurred on the Additional/Extra items not included in the Estimated Cost (Table -C) Yours Faithfully / (} W For AADH�NEERS ER. C.0.PATEL Reg. No. STATE/R/2024/APU15038 AADHAR ENGINEERS Signature & Name (IN BLOCK LETTERS) with Stamp of Engineer [Not Less than bachelor's Degree Holder or equivalent as per Section 2(u) of the Act] Local Authority license no. STATE/R/2022/APL/03620 (if applicable) Date of C&/2025 Agreed and Accepted by: Signature of Promoter Name: Ankit Nitin Kothari Date: 31/12/2025 1.The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2.(*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor,whose certificate of In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer,the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3.(**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 4.AII components of work with specifications are indicative and not exhaustive 5.Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specifications in agreement of sale. Page 3 of 4