--------S>lll~~10",W,· 1"',.~lall---------------- ------------ \ SAMEER S. MADIYAR (B.ARCH. A.I.I.A.) REG. NO.: CA-99/2 4800 346, 2nd Floor, 'B' Wing, Market Yard Shopping ARCHITECT Comple x, Adjecen t To Suyog H?spita l, Opp. Patel Arcade Building, Dindon Road, INTERIOR DESIGNER Panchvati, Nashik-422003. FINE ARCH PH.: (0253)2514753. Mobile: 9890061066 LANDSCAPE DESIG NER Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registratio,n of Ongoing Project and for withdraw al of Money from Designated Account) Date:31 /12/2025 To, ANKIT NITIN KOTHARI NASHIK, MAHARASHTRA, 422003 Subject : Certificate of percentage of Work of completion of construc tion work of MONSO ON MEADO WS having MahaRERA Registration Number P51600007396 (Only Applicable after project Registartion) being develop ed by ANKIT NITIN KOTHARI Sir, I/We SAMEER S MADIYAR have undertaken assignment as Architect /license d Surveyor of certifying Percentage of completion of Construction Work of MONSOON MEADOWS having MahaRE RA Registration Number P51600007396 (Only Applicable after project Registration, being developed by ANKIT NITIN KOTHA RI) Based on Site lnspection,with respect to Layout/ each of the Building/ Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percenta ge of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Layout/Building/Wing Number: MONSOON MEADOWS/NA Sr. No. Tasks/Activity Percentage of Actual Work , . Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 Basements (if any) 100.00 3 Podiums (if any) 0.00 4 Plinth, 100.00 5 Stilt Floor 100.00 6 Slabs of Suoer Structure 100.00 7 Internal walls, Internal plaster, Floorings , Floors and windows within Flats/Premises 70.00 8 Sanitarv Fittinq within the Flat/Premises 25.00 Page 1 of 3 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) 9 Staircase s, lifts Wells and Lobbies at each Floor level Overhead and Underaround Water Tanks 70.00 10 External plumbing and external plaster, elevation, completion of terraces with wateroroofing of the Building/wing. 25.00 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of 0.00 environmenUCRZ NOC, Finishing to entrance lob~/s, plinth protection.paving of areas appurtenant to Building/Wing, Compound all and all other requirements as may be required to complete project as per specifications in agreement of Sale. Anv other activities. Page 2 of 3 Table B • Common Areas (Internal and External Development Works) in respect of Registered Phase I Project Number) Sr.No Common areas and facilities Is Available Percentage of Actual Details (Yes/ No) Work Done (As on date of the . Certificate) (1) (2) (3) (4) (5) 1 Internal Roads & Footpaths No 0.00 NA 2 Water Supply Yes 0.00 TOBE COMPLETED BEFORE OCCUPANCY 3 Sewerage (Chamber, Lines, Septic Tank, STP) Yes 0.00 TOBE COMPLETED BEFORE OCCUPANCY 4 Storm Water Drains No 0.00 NA 5 Landscaping & Tree Planting Yes 0.00 TOBE COMPLETED BEFORE OCCUPANCY 6 Street Lighting Yes 0.00 TOBE COMPLETED BEFORE OCCUPANCY 7 Community Buildinos No 0.00 NA 8 Treatment And Disposal Of Sewaoe And Sullaoe Water No 0.00 NA 9 Solid Waste Manaoement And Disposal No 0.00 NA 10 Water conservation /Rain water harvesting Yes 0.00 TOBE COMPLETED BEFORE OCCUPANCY 11 Enerav manaoemcnt No 0.00 NA 12 Fire protection and fire safetv reauirements No 0.00 NA 13 Electrical meter room, sub-station, receiving station Yes 0.00 TOBE COMPLETED BEFORE OCCUPANCY 14 Aaaregate area of recreational Open Space No 0.00 NA 15 Open Parkinq No 0.00 NA Yours Faithfully l'or FINE ARCh ~ &.ARCH., AJ.LA. SAMEER S MADIYAR CA 91 I 2JIIOO Signature & Name (IN BLOCK LETTERS) of LS/ Architect ( License No: null) Date of Certificate: 31/12/2025 Agreed and accepted by: Signature of Promoter Name: Ankit Nitin Kothari Date: 31/12/2025 Page 3 of 3