Bhushan Shintre Near Uisav Garden, Nashikroad, Nashik 422101. FORM-2 see Regulation 3] ENGINEER'SCERTIFICATE Date : 01/11/2021. To Tne Jay Developers, Subjec: Certificate of Cost Incurred for Development of Vijay Sneh building(s)/ "E" Wing(s) of the hase, situated on the Plot bearing Sr. No. 274/2/2/B, Plot Nos. 19 to 31, Kailas Naga ear indu Lawns, Aurangabad Road, Nashik, demarcated by its boundaries (latitude and ongituce of the end points) Tc North 9.00 Mtr Wide Road, To South 7.50 Mtr Wide Road, Te East Chari, To West Sr. No.272/1Part, of iasni Division, Nashik Village, Nashik Talukä, Nashik District, admeasuring 2515.60 SqMtrs. areateg developed byJay Developers Reference :MahaRERA Registration Number Sir /We Bhushan Shintre, have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, situated on the Sr. No. 274/2/2/B, Plot Nos. 19 to 31, Of Nashik Division, Nashik Village, Nashik Taluka, Nashik District, admeasuring 2515.60 SqMtrs. area being developed by Jay Developers 1.following technical professionals are appointed by Owner/ Promoter 4/:/thri/Smt Abhijit Malpure as L.S./Architect ) M//hri/Smt Vilas Katkade as Structural Consultant; (iwy 14/+/9huri/smt Not Applicable asMEP Consultant; (iv) M/:/hri/Smt Amol Bhalerao as Quantity Surveyor*; 2. W tave etinated the cost of the completion to obtain Occupation Certificate/ Completion Certshtate, of the Civil, MEP and Allied works, of the Buildugts) Buildiug:(s) of the project projert Our estinated estinated cost calculations are based on the Drawings/plans made availabie to us for the project undet elerene by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Amol Bhalerao, Quantity Sturveyor appointed by Developer/t ngineer, and the assunption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. Bhushan Shintre A-522364-5 B.E.(Civil) . We estimate Total under Estimated Cost of completion of reference as Rs. the buildingls) of the aforesaid project LOt of 1,92,00,000/-, project project is with (Total of Table A and B). The estimated estimated lota reference pieeu íor the purpose of obtaining to the Civil, MEP and allied works required to DE unding(s) from the Nashik occupation certificate/ completion certificate Municipal Corporation for the jursdiction aforesaid project is being the being the Planning Authority under whose implemented. The Estinated Cost Incurred till date attiount of Estimated is calculated at Rs. NIL /-, (Total of Table A and B) The Cost incurred is calculated on the base of amount of Total Estimiated cost The Balance cost of Completion of the Civil, MEP and Allied works of the Buildingls) ot the subject project to obtain Occupation Certificate/ Completion Certificate from Nashik Municipal Corporation is estimated at Rs. 1,92,00,000/,(Total of Table A and B) .certify that the Cost of the Civil, MEP andallhed work for the afore said Project as completed on the date of this certificate is a5 8iven in Table A and B below TABLE A "Vijay Sneh" "E" Wing by Jay Developers (to be p1epated sepaiately for eath buiiding Wing ot the Real E state Pr oject) No Particulars Amounts otal tstmated cost of the building/wing as on date of Registration is Rs. 1,80,00,000/ Cost incutred incurmed as on date (Dased on the Estinmated Cost ) Rs. NIL/ Work done in Percentage (s Percentage of the Estimated Cost) 0.00 (ZERO) % Balance Cos1 to be Incurred (Based on Estimated Cost) Rs. 1,80,00,000/- Cost inuted on Additional/Extra Items as on date not included an the Estimated Cost (Annexure A) NIL Bhushan Shintre A-522364-5 B.E.(Civil) TABLE B (to be prepared for the entire registered phase of the Real Estate Project Sr. No Particulars Amounts 1 Total Estimated of cost the Internal and External Development Works including Amenities and Facilities in Rs. 12,00,000/- the layout as on date of Registration is 2 Cost incurred incurred as on date (based on the Estimated Cost) Rs. NIL/ 3 Work done in Percentage 0.00 (ZERO) % (as Percentage of the Estimated Cost) Balance Cost to be Incurred (Based on Estimated Cost) Rs. 12,00,000/- 5 Cost Incurred on Additional/Extra Items as on date not included in the Estimated Cost (Annexure A) NIL Yours Faithfully Signature dfWAAer 4Hees.N5.{Civil) Note 1. The scope of work is to complete entire Real Estate Project as per crawings approved from time to time so as to obtain Occupation Certificate /Completion 2. () Quantity survey can be done by office Certificate of, Engineer or can be done by an independent Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In Quantity case of independent quantity surveyor being appointed by Developer, the name has te be mentioned at the place marked (") and in case quantity quantity are being calculated calculated office of name of the person in the office of by Engineer, the Engineer, who is responsible for the quantity calculated should be mentioned at the place marked () 3. The estimated cost includes ali labour, material, equipment and entire work. machinery required to carry out 4. As this is an estimated cost, any deviation in quantity required for Project will result in amendment of the cost incurred/to be development of the Real Estate 5. All components of work incurred with specifications are indicative and not exhaustive.