GANESH V. SHIRSAT B.E. (Civil) Reed. Office: AIP- Babaduri, Tal- Chandwad, Nasbik, 7743905071 Email-Shirs"tgt@gm~iI.com FORM-2 (See Regulation 3) ENGINEER'S CERTlFICATE lto be submiucd .. the time o(Regist.l'Jltion ofOr\gfling Project and fbr witbdf'ftwu.l of Money ftOl11 IJesig,J131cdAceeurn- Project wise) Date: If 12120 18 To. Director, Shreya properties private Limited. 2, Jccvanshanti Apartment. Bhabha nagar, Nashik SUbject: Certificate of Cost Incurred for Development of 'Shreya Heights' for Construction of residential building. one Wing of the single Phase (1)51600008371) situated on the Plot bearing Survey No.7921IA1I+2+3, Final Plot No. 7+8 demarcated by its boundaries 19.9826238,73.7728547 to the North to the South 19.9825034, 73.7724682 10 the East 19.9824955 to the West of Division 19.9826534. 73.7724522. Village Nashik, Taluka Nashik, District Nashik PIN 422002 admeasuring 854 sq.rnts. area being developed by Bharat Ramjilal Singhal & other Directors, Ref: MahaRERA Registration Number - PS1600008371 Sir, 1, Ganesh Shirsat • have undertaken assignment of certifying Estimated COSt for the Subject Real Estate Project proposed to be registered under MahaRERA. being one Building one Wing of the first Phase situated on the plot bearing Survey No.792fIAlI+2+3/ final Plot No.7+8 of Division Nasbik Village Nashik Taluka Nashik District Nashik, PIN 422002 admeasuring 854 sq.mts. area being developed by Bharar Ramjilal Singhal & other Directors, 1. Following technical professionals are appointed by Owner I Promotcr:- (i) Shri Ajit Ghodke as L.S. / Architect; (ii) Shri Yogin Kulkarni as Structural Consultant (iii) Shri Ajit Ghodke as MEP Consultant (iv) Shri Chelan Nandre as Quantity Surveyor • 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate. of the Civil, MF..Pand Allied works. of the Buildingts) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Chctan Nandre, GANESH V. SIDRSAT B.E. (Civil) Regd. om~:AlP· Bahadurl, Tal- Chandwad, Nashik. 7143905071 Email- Shirsatgl@\:mHil.tom quantity Surveyor" appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated COStof completion ofthc buildingfs) olthe aforesaid project under reference as Rs, 5,25,49,913 (Total of Table A and B). The estimated Total COSIof project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate 1 completion certificate for the building(s) from the Nashik Municipal Corpoiration being the Planning Authority under whose jurisdiction the aforesaid project is being implemented, -4. The Estimated Cost Incurred till date is calculated at Rs, 4,45,41,591 Total of Table A and B}_. The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) oflhe subject project to obtain Occupation Certificate 1 Completion Certificate from NMC (planning Authority) is estimated at Rs, 90,08,322 ( Total of Table A and B). 6. J certify that the Cost of the Civil. MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: TABLE A Building /Wi ng bearing N umber one or called Shrcya Height' s. (to be prepared separately fOTeach Building !Wing of the Real Estate Project) Sr. No Particulars Amounts in INR (I) (2) (3) I Total Estimated cost of the building/wing as on 1/1212018 5,25,49.913 date of Registration is 2 Cost incurred as on 111212018 4,45,41.591 (based on the Estimated cost) 3 Work done in Percentage % 95% 4 I (as Percentage of the estimated cost) Balance Cost to be Incurred (Based on Estimated Cost) 80,08,322 5 I Cost Incurred on Additional.Extra hems as on not included in the Estimated COSt(Annexure A) NIL TABLER (to be prepared for the entire registered phase of the Real Estate Project) Sr. No Particulars Amounts in lNR (1) (2) (3) 1 Total Estimated cost of the Internal and External 10,00,000 Development Works including amenities and Facilities in the layout as on 1/1212018 date of Registration is GANESH V. SHIRSA T D.E. (Civil) Regd. Office: A/P- 8ahadurl, Tal- Chandwad, Nashik, 7743905071 Emalt- Shirsatgll!!,l:mail.com 2 COst incurred as on 1/12f20 18 (based on the Estimated 0 cost). 3 Work done in Percentage 0% (as Pcrcentazc ofthe estimated cost). 4 Balance Cost to be lncurred 10,00,000 (Based on Estimated Cost). 5 Cost Incurred Oil Additional/Extra Items as on 1/1212018 NIL not included in the Estimated Cost (Annexure A). Yours Faithfully. OANESH VI.' ,\1,' ~HIRSAT Reg I ,.;cr Reg,No.,. _-13/3/18 Signature of Engineer. (Licence No ... ?:-.?5...) .. ote: 1.The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate/Completion Certificate, 2. (0) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose ceni ficate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer. the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer. who is responsible for the quantity calculated should be mentioned at the place marked (0). 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4. As this is an estimated COS" any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred f to be incurred. 5. All components of work with specifications are indicative and not exhaustive. Annexure A List of Extra/Additional Items executed with Cost (which were not part of the original Estimate of'Total Cost).