4 Storm Water Drains N/e 5 Landscaping & Tree YES 100 PAVING AND Ptanting I..ANDSCAPE tS DONE 5 Street Lishtine N/A 7 Community Buildines N/A 8 Treatment and disposal of N/A sewage and sullage water 9 Solid Waste management N/A & Disposal 10 Water conservation, Rain YES 100 RAIN WATER water harvesting HARVESTING AND BORE WATER IS DONE. 11 Energy management N/A \2 Fire protection and fire YES 100 NOC FROM CFO FIRE IS safetv reouirements OBTAINED. 13 Electricalmeter room, YES 100 ELLECTRrcAL METER sub-station, receiving ROOM IS COMPLETE. station lnternal & E*ernal Development Works in Respect of the entire Registered Phase Building RUTUGANDHA B Wing Number 2/2 Sr.No Common areas and Proposed Percentage of Details Facilities, Amenities (Yes/No) Work done 7 lnternal Roads & N/A Foothpaths 2 WaterSupply YES 100 PERMENENTWATER SUPPLY WILL BE AVAIIABLE AFTER THE COMPLETION CERTIFICATE IS OBTAINED. 3 Sewarage (chamber, lines, YES 100 CONNECflON TO THE Septic Tank, STP) MAIN DRAINAGE LINE IS COMPLETE. 4 Storm Water Drains N/A 5 Landscaping & Tree YES 100 PAVING AND Planting LANDSCAPE IS DONE 6 Street Lishtins N/A 7 Community Buildincs N/A I Treatment and disposal of N/A sewage and sullage water 9 Solid Waste management N/A & Disoosal 10 Water conservation, Rain YES 100 RAIN WATER waterharvesting HARVESI]NG AND BORE WATER IS DONE. 11 Energy management N/A L2 Fire protection and fire YES 100 NOC FROM CFO FIRE IS safety requirements OBTAINED. 13 Electricalmeter room, YES 100 ELLECTRICAL METER sub-station, receivi ng ROOM IS COMPLETE. station (ROOPAYAN CONSULTANTS PROP.) Signature & Name (lN BLOCK LFTTERS) of L.Sl Architect ( License NO CA/2003/310441