FORM-2 [See Regulation 3] ENGINEER’S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Project wise) Date : 28/07/2017 To, The AAKAR BUILDCON, 1, Karpoor Apt., Sawarkar Nagar, Gangapur Road, Nashik-422013. Subject : Certificate of Cost Incurred for Development of AAKAR ELITE Building of the Project [MahaRERA Registration Number] situated on the Plot No.24 demarcated by its boundaries (latitude and longitude of the end points) Plot no.23 to the North Plot no.25 to the South 25 ft. road to the East Plot no.15/16 to the West of Division Nashik village Nashik taluka Nashik District Nashik PIN 422002 admeasuring 631.91 sq.mts. area being developed by AAKAR BUILDCON. Ref : MahaRERA Registration Number _____________________ Sir, I Mr. Milind Rathi have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being AAKAR ELITE Building of the Project [MahaRERA Registration Number] situated on the Plot bearing C.N. No/CTS No./Survey No./ Final Plot No. Sr. No. 1024/1/31, Plot No.24 Division Nashik village Nashik taluka Nashik District Nashik PIN 422002 admeasuring 631.91 sq.mts. area being developed by AAKAR BUILDCON. 1. Following technical professionals are appointed by Owner / Promoter :–– (i) Smt Priyanka Sanjay Gupta as L.S. / Architect ; (ii) Mr. Milind Rathi as Structural Consultant 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs. 3,35,00,000/-. The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from thebeing the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 71,98,375/- . The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from planning Authority is estimated at Rs. 2,63,01,625/-. 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below : TABLE A Building AAKAR ELITE (to be prepared separately for each Building /Wing of the Real Estate Project) Sr.No. Particulars Amounts 1 Total Estimated cost of the building/wing as on 3,25,00,000/- 28/07/2017 date of Registration is 2 Cost incurred as on 28/07/2017 71,98,375/- 3 Work done in Percentage (as Percentage of the 30% estimated cost ) 4 Balance Cost to be Incurred (Based on 2,53,01,625/- Estimated Cost) 5 Cost Incurred on Additional /Extra Items as on 0 _____________not included in the Estimated Cost (Annexure A) TABLE B (to be prepared for the entire registered phase of the Real Estate Project) Sr. Particulars Amounts No. 1 Total Estimated cost of the Internal and External Rs.10,00,000/- Development Works including amenities and Facilities in the layout as on 28/07/2017 date of Registration is 2 Cost incurred as on 28/07/2017 (based on the 0 Estimated cost). 3 Work done in Percentage (as Percentage of the 0% estimated cost ) 4 Balance Cost to be Incurred (Based on Estimated Rs.10,00,000/- Cost) 5 Cost Incurred on Additional /Extra Items as on NILL _____________not included in the Estimated Cost (Annexure A) Yours Faithfully Milind Rathi (License No – M-125145) Chartered Engineer