Ermoeba design 38/chai-traban F,/wing B, off ITI road, opp croma, aundh, pune 4110 0 7 pashminshah@gmai 1 . com +91 9503 906 600 TO WHOMSOEVER IT }'AY CONCERN Date: L5.12.20L9 Subject: Cer:tificate of Percenta ge of Completion work of building name "SIDDHf ELfTE APaRTMENT" for Construction Work of 1 Building sj-tuated on the PLot No. 1A+1B+1C+1D bealing Sulvey no. 109/108, demarcated by its boundaries (Iatitude and long.itude of the end points) PIot No. 2 to the North, 'l .62 mtr. Road to the South, Plot No. 3 to the East, 9 Mtr. Road to the West7 of Division Wadala, Village trladala, taluka Nashik, District Nashik PIN 422009 admeasuring 901.875 Sq. Mtrs. area being developed by Patanj. Shah Associates. Sir. I Ar. Pashmin S. Shah have undertaken assignment as Architect of certifying Percentage of Completion of construction work of the project 'SIDDEI ELITE APARTMENI" situated on the Plot No. 1A+1B+1C+1D bearing Survey no. 109/108, of Division NASHIK, vilfage Wadala, village Wadala, taluka Nashik, District Nashik PIN 422009 admeasuring 901.875 Sq. Mtrs. area being developed by Patani Shah Associates - 1. FoIlowing technical profes s ionals are appointed by Owner / Promoter : - (i) Ar. Pashmin S. Shah Architect i (ii ) Er. Nitin Tekal-e as Structural ConsuLtant Based on Site Inspection. with respect to each of the Buildings of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project as registered vide number P51600005829 under RERA is as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building / Wing and overall Percentage of the work done with respect to each Building / !!ing is detailed in the TabLe B. Table A *SIDDEI ELITE APARTI{ENT" Tasks / Activity Percentage Sr.No. 1 Excavation 100 2 1 number of Plinth 100 3 0 number of Podiums 0 4 Stilt Floor 100 5 6 nurnber of Slabs of Super Structure 100 6 Internal WaI1s, Internal Plaster, E.Ioorings within the FIat / Premises, Doors and Windows to each of the Flat 90 / Prem.ises 1 Sanitary Fittings within the FIat ,/ Premises, 40 EIectrj.caL Fitt ings within the FIat / Premises, 8 Staircases. ],ifts Wells and l,obbies at each Eloor IeveI connecting Staircases and Lifts, overhead and 100 Underground Water Tanks 9 External Plumbing and Externaf PIaster, El-evation, completion of Terraces with Waterproofing of the 100 Building / Wing 10 lnstallation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as per CEO NOC, Electrical Fittings to Common Areas, Electro, Mechanical Equipment, Compliance to condj.t j-ons of Environment / CRZ NOC, Einishing to Entrance Lobby/s. Plinth 80 Protection, Paving of areas appurtenant to Building / Wing, Compound WaII and all other requirements as may be required to obtain Occupation / ComPletion Certl f .icate . *SIDDIII ELITE -APART!,IENT " TABLE B lnternal & External- Development Works in Respect of the project St. Comon Roade and Proposed P€rcentage No. Facilities, Amenities (Yes /No) of lilork Details done 1 Internal Roads and No 0 NA Footpaths 2 Water Supply Yes 0 obtained 3 Sewerage (Chamber, Lines, Yes 100 Septic Tank Done Septic Tank, STP) 4 Storm Water Drains No 0 NA 5 Landscaping and T.ree Yes 100 Completed Plant ing 6 St.reet Lighting Yes 100 By NMC Corrununity Buildings ,7 No 0 NA 8 Treatment and Disposal of No 0 NA Sewage and Salvage water 9 Solid Waste Management No 0 NA and Disposa l 10 Water Conservation and Yes 100 Rain Water Harvesting Ra j-n Water Harvesting Done 11 Energy Management No 0 NA t2 Fire protection and Fire Yes 80 Work fn Progress Requirements 13 Electrical Meter RoomT Yes 100 Some Electrical Sub-Station, Receiving Meters Taken Station 74 Others (Option to add more) Yours Faithfully n- c c'Ia rl.