N CONSULTANTS (R.C.C. Designer) Amit L. Dholu (B.E. Civil. AMIE, Structural Engineer) (To be submitted at the time of Registration of Ongoing project and for withdrawal of Money from Designated Account-Project wise) BHA6VA DEVELOPERS PARTNERSHIP FIRM THROUGH MR.RIMESH J RAMANI Subject: Certificate of cost Incurred for Development of Residential Building of the project BHAGYA HAW ROW BUNGLOW situated on the Plot bearing Survey No ,35/(PART) Final Plot no 15+16Demarcaded By its boundarieS.OMT WIDE ROAD TO the NORTH ADJACENT SR.NO32/2 TO THE SOUTH ADJACENT PLOT NO 17 to the EAST7^0 M WIDW ROAD TO THE WEST VILLAGE NASHIKTALUKA NASH IK PIN 422004, ADMEASURING 599.00 SQ.MTS AREA BEING DEVELOPED BY _BHAGYA DEVELOPERS. Sir, < AMIT DHOLU have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under Maha RERA.being one building situated on Plot bearing Survey N0.15/(PART), Final Plot No.15+16 of Devision NASHIK village NASHIK Taluka-NASHIK,District-NASHIK,PIN-422004, admeasuring 599.00 ruts area being developed By BHAGYA DEVELOPER 1.Following technical professionals are appointed by owner /Promoter :- (I) Mr.Sureshpatel As Architect (ii) Mr.AmR dholu As structural Consultant (iii) Mr.Bhushan shintreas Quantity Surveyor 2. We have estimated the cost of the completion to obtain Occupation Certificate Completion Certificate, of the Ovil.MEP and Allied works, of the Building of the project our estimated cost Calculations are based on the Drawings plan made available to us for the project under Reference by the Developerand Consultants and the schedule of items and quantity for the Entire work as calculated by Mr.Bhushan shintre quantity Surveyor* appointed by Developers nd the site Inspection earned out by us. 3.We estimate Total Estimated cost of completion of the building of the aforesaid project Under refere 1,23,00000The estimated Total cost of project is with Reference to the Civil MEP and allied work required to be completed for the purpose Of obtaining occuportlon certificate/completion certificate for the building from the Nashlk Municipal Corporation Nashlk Maharashtra being the planning Authority under justification Aforesaid project Is being implemented. 4.the Estimated cost Incurred till date is calculated as Rs 76,00000 '(Total Table AandBjThe amount of Estimated cost Incurred Is calculated on the base of amount Of Total estimation cost. 5.The Balance cost of Completion of the Gvll-MEP and Allied works of the BuildTng(s) of the subjects project to obtain Occupation Certificate/Completion certificate from Naslk Municipal Corporation, Nasik, Maharashtra being the palling Authority is estimated at Rs. 4700000(Total of Table A and B). 6.1 certify that the cost of the civil. MEP and allied work for the aforesaid prepared Completed on the date of this certificate is on given In table A and 8 below. BUILDING;- BHAGYA HARI ROW BUNGLOW Building /Wing bearing Nun rs. i,u^nooo_ Rs. 70,00000 (based on Wo* done in Percentage (Based on Estimated Cost) Cost Inclined on Additional /Extra Items leon 25/07/2017 not included in die Estimated COst (A^ncxure A) (tobepnpared for the entire regi l phase of the RealiEstate Project) Sr. No. Parti Amount. (1) (2) Development Works including amenities an Facilities in the layout as on 25/O7/2017_ dale of Registration is (Based on Estimated Cost). Cost Incurred en Additional /Extra Items ason_2S/07/2017_ Signature ofEngineer. NAME: AMFT I. DHOLU" PAN NO:-BFRP1M642G ADDHAR NO:-5867S4234635 HORIZON .TANT