FORM-2 ENGINEER'S CERTIFICATE Dare : 15o May 20tB To, Nirmiti Builders and Developers Nasik. Subject : Certificate of Cost Incurred for Construction of Vrindavan Apt, S. no. 298/L, P. no. 59/60/A/B/c, Pathardi, Nasik No. of Building(s) 1, wing(sj of the __ Phase of the Project [MahaREM Registration Number applied for] situated on the Plot bearing C.N. No/CTS No./Survey No./ Final plot No. SSTOO /A/B/C demarcated by its boundaries (latitude L9.94769424 and. longitude 73.76t42383) 9.00 m w road to the North, plot no 61 to the South, plot no 53 to 5B/H to the East, 7.50 m w road to the West, of Division, Nasik village pathardi, taluka NASIK District NASIK PIN 422010 admeasuring 586.67 sq. mtr. Area being developed by Nirmiti Builders and Developers. Ref : MahaREM Registration Number (applied for) Sir, l/ We Bhavesh Patel have undertaken assignment of certi$ring Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaREM, being 1 Building(s)/ 1 Wing(s) of the first Phase situated on the plot bearing C.N. No./CTS No./Survey No./ Final Plot No. 59/60 /A/B/C of Division NASIK Vittage Pathardi Taluka Nasik District Nasik PIN 422010 admeasuring 586.67 sq.mts. area being developed by Nirmiti builders and Developers. 1. Following technical professionals are appointed by Owner / Promoter :-- [i) M/s/Shri/Smt. fayant Bhadange as L.S. / Archirect;E (ii) M/s /Shri / Smt. Bhavesh f. Patel as Strucrural Consultant (iii) M/s /Shri / Smt. as MEP Consultanr (iv) M/s /Shri / Smt. Dilip Solanke as Site Supervisor Z.We have estimated the cost of the completion to obtain Occupation Certificate/ CompletiontsCertificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under refelence by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Bhavesh Patel quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs. r,04,77,060/- (Total of Table A and B .{Es H i The estimated Total Cost of project is with reference to the Civil, MEP and a 60:;=t4 Y'-\S\\p i447-gl 4044 -/6r %,;^*€ /, \---2J # works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the Executive Engineer, Nasik Municipal Corporation, Nasik being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated cost incurred till date is calculated at Rs. L04,2r,060/- (Total of Table A and B). The amount of Estimated Cost Incurred is calculated on ihe base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from Executive Engineer, Nasik Municipal Corporation, Nasik (planningAuthority) is estimated at Rs. 0/- (Total of Table A and B). 6. I certi$r that the Cost of the Civil, MEP and allied work for the aforesaid project as completed on the date of this certificate is as given in Table A and B below : TABLE AE Building called Vrindavan ApartmentB Sr no Particulars Amounts L Total Estimated cost of the building / wing as on date of Rs. L04,77,060 Registration is 2 Cost incurred as on L5 May 2018 [based on the Rs. L04,77,060 Estimated cost ) 3 Work done in Percentagen (as Percentage of the L00 o/o estimated cost ) 4 Balance Cost to be Incurred [Based on Estimated Cost) NIL 5 Cost Incurred on Addition al /Extra Items as on N. A. not included in the Estimated Cost (Annexure A) TABLEB:NOTAPPLICABLE Yours Faithfully, f$A'{"qry W*'*,]f, h. "'nii, &kr#