SACHIN R. CHANDANE ARCHITECT. B-Architecture (India) 2002. FORM- 1 [See Regulation 31 ARCHITECT CERTIFICATE Date: 27-07-20 17 To, MIS. S. D. Bhalerao Constructions Pvt. Ltd., 50 1, 5th Floor, Samarth Arcade, Opp. Holy Cross School, Old Mumbai Agra Road, Thane (W) - 400 60 1. Subject: Certificate of Percentage of Completion of Construction work of development of UPadmavatiNagarin, Building No. 1, A Wing (k B - Wing of the Project (RERA Regd. No. Applied for) situated on the Plot Nos. 15 to 18 8s 35 to 38, Gut No. 162, demarcated by its boundaries land bearing Gut No.155 (k 154 to the North, land bearing Gut No. 173 to the South, land bearing Gut No.160, 161, 157 (k 155 to the East, land bearing Gut No. 163,164 &I72 to the West, of Division Nashik, Village Pimpri Saddroddin, Taluka Igatpuri, District Nashik, PIN 422403 admeasuring 1252.56 sq.mtrs. out of total area of 20100 sq. mtrs. being developed by MIS. S. D. Bhalerao Constructions Pwt. Ltd. Sir, We M/s. CSR Architects have undertaken assignment as Architect of certifying Percentage of Completion of Construction work of uPadmavati Nagarin, Building No. 1, A 8s B Wing of the Project, situated on the plot Nos. 15 to 18 &, 35 to 38, Gut No. 162, of Division Nashik, Village Pimpri Saddroddin, Taluka Igatpuri, District Nashik, PIN 422403 admeasuring 1252.56 sq.mtrs. out of total area of 20 100 sq. mtrs. being developed by M/s. S. D. Bhalerao Constructions Pvt. Ltd. 1. Following technical professionals are appointed by Owner/Promoter:- (i) M/s. CSR Architects as Architect. (ii) M / s Associated Consultant as Structural Consultant. (iii)ShriAnil T. Mokashi as Site Engineer. N9, Sujata Soc., Vidyalaya Marg, Mulund (East), Mumbai-400081 Resi: 9 1-022-2563 8158, Mob: 9 1-9869 05 6634, Email: sachin.chandane@amail.com SACHIN R. CHANDANE ARCHITECT. B-Architecture (India) 2002. Based on Site Inspection, with respect to the Building of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of work done for the Building of the Real Estate Project as registered vide number - applied for, under RERA is as per table. 'A' herein below. The percentage of the work eftecuted with respect to each of the major activity of the Building and Overall percentage of work done with respect to Building is detailed in the Table 'B'. Table A A-wing Sr. Tasks/ Activity Percentage No. of work done 1 Excavation 100 2 One Number of Basement(s)and Plinth 100 3 Nil Number of Podiums ---- 4 Stilt Floor 100 5 4 Number of Slabs of Super Structure 100 6 Internal walls, Internal Plaster, Flooring within Flat/ 60 Premises, Doors and Windows to each of the Flat / Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 00 Fittings within the Flat/Remises. 8 Staircases, Lifts Wells and Lobbies at each Floor 50 level connecting Staircases and Lifts, Overhead and I I f Undermound water Tanks I I 191 The External plumbing and external plaster, elevation, completion of terraces with waterproofing cf &klesG2dinGD/ t'SfrTjiiG h Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to C o m m o n Areas, electra, nxchmicd equipment, Compliance to entrance lobby/ s, plinth protection, paving of areas appurtenant of ~ u i l d i n ~ / wing, Compound wall and all other requirements as may be required to obtain Occupation/ Completion I Certificate. Al9, Sujata Soc., Vidyalaya Marg, Mulund (East), Mumbai-400081 Resi: 91-022-25638158,Mob: 91-986905 6634,Email: sachin.chandane8amail. SACHIN R. CHANDANE ARCHITECT. B-Architecture (India) 2002. Table A 1 Sr. No. Tasks! Activity Percentage of work done Excavation --~ - . - - .~ , -- 100 - - 2 One Number of Basement(~) and Plinth 100 3 Nil Number of Podiums ---- 4 Stilt Floor 100 13 Number of Slabs of Super Structure 100 Internal walls, Internal Plaster, Flooring within Flat/ 60 Premises, Doors and Windows to each of the Flat / Premises I 1 7 1 Sanitary Fittings within the Flat/Premises, Electrical I I Fittings within the Flat/Premises. 1 8 I Staircases, Lifts Wells and Lcbbies at each Floor level connecting Staircases and Lifts, Overhead and Underground water Tanks The External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical eclrripiiient, Coir-fiaice to eiih=aiceloquq"y- j s, g,ihitli protection, paving of areas appurtenant of Building/ wing, Compound wall and all other requirements as may be required to obtain Occupation/Completion Certificate. N9, Sujata Soc., Vidyalaya Marg, Mulund (East), Mumbai-400081 Resi: 91-022-2563 8158, Mob: 91-9869 05 6634, Email: sachin.chandane@amaiI.com SACHIN R. CHANDANE ARCHITECT. B-Architecture (India) 2002. Internal & External Development Works in Respect of the entire Registered Project Sr. Common areas and Proposed Percentage of Details No. Facilities, Amenities (Yes/No) Work done 1 Interhal Roads & No -- N.A. Footpaths 2 Water Supply Yes 10 Work in progress 3 Sewerage (chamber, lines, Yes 0 Work yet to start Septic Tank, STP) 4 Storm Water Drains No -- N. A. 1 5 1 Landscaping Tree I No I -- I N.A. 6 Street Lighting No -- N.A. 7 Community Buildings No -- N.A. 8 Treatment and disposal of No -- N.A. 1 sewage and sullage water 9 / Solid Waste management - No -- N.A. & Disposal 10 Water conservation, R& 1 No -- I I N.A. water harvesting 11 Energy management No -- N.A. 12 , Fire pmtect;o,n, =d fire, No , I -- I I N.A- safety requirements 13 Electrical meter room, Yes 0 I Work yet to start sub-station, receiving (No sub-station station & Receiving Station) 14 Aggregate area of No -- N.A. recreational Open Space : 15 1 Open parking No -- N.A. Yours faithfully, Mr. Sachin Chandane Architect MIS. CSR Architects CR.NO. CA/2003/31193 N9, Sujata Soc., Vidyalaya Marg, Mulund (East), Mumbai-400081 Resi: 91-022-25638 1 58,Mob: 91-986905 6634,Email: sachin.chandane@arnaiI.com