ENGINEER'S CERTIF'ICATE Date:14.10.2017 To IWS Shweta Infrastructure & Housing (D pyt.Ltd Samraat House, Tagore Nagar, Opp. Ambedkar Nagar, Nashik pune Highway, Tal. & Dist. Nashik 422 006 Subject: Certificate of Cost Incurred for Development of Samraat Symphony Project 02, Building 1- Wing D, I Maha RERA Registration Number P516000027421of theProject situated on Plot No. 84, S.No. 899/l+89912t1+899t3i1l84, Nashik Shiwar,demarcated by it,s a boundaries (latitude and longitude of the end points)6.00 Mt Wide Road (19.958338, 73.771772) to the North, Samraat symphony compteted project 03(19.958070,73371s99) to the South,s.No.898 (19.9583287,73.771989) to the East and Samraat symphony project 0l(19.958229,73.771791)to the West of Tal. & Dist. Nashik, PIN 422009, admeasuring973.49 Sq. Mt. area being developed by M/s Shweta Infrastructure & Housing (r) pvt. Ltd. Sir, I Er. Sudhir Chandrakant Metkar have undertaken assignment of certifying Estimated Cost for the Samraat Symphony Project 02, Building 1- WingD,of Project situated on Plot No. 84, S. No. 89911+8991211+8991311184, Nashik Shiwar, admeasuring973.49 Sq. Mt.area being developed By 1\I/S Shweta Infrastructure & Housing India pvt. Ltd. 1. Following technical professionals are appointed by owner / promoter: - (i) Smt. Tapasya H Bendale as Architect; (ii) shd. Jayant Inamdar (srRuDCoM, pune) as structural consultant (iii) Shri. Sharadchandra Rao (ECEpH, Mumbai)_as MEp Consultant (iv) Ms. Ranjana Rahul Kulkarni as Quantity Surveyor 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our eitimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Ms. Ranjana R. Kulkarni quantity Surveyor* appointedby Developer and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs 28"271.697 (Total of Table A). The estimated Total Cost of project is rlgarding the Civil, MEP and allied works required to be completed for obtaining occupation certincate / completion certificate for the building(s) from the Nashik Municipal Corporation being the planning Authority under whose jurisdiction the aforesaid project is being implemented 4' The Estimated cost Incurred till date is calculated at Rs. Ig.4g.72g (Total of rable A). The amount of Estimated cost Incurred is calculated on the b*. of u*IGilffial Estimated cost. 5' The Balance cost of completion of the civil, MEP and Allied works of the Building(s) of the subject project to obtain occupation certificate / completion c"rtin"ut" from NashikMunicipal Corporation is estimated atR;.26"421,967 (Total of Table A). 6' I certify that the cost of the civil, MEP and allied work for the aforesaid project as completed on the date of this certificate is as given in Table A below: TABLE A BUILDING I-WING-D Sr. No Particulars Amounts Amounts I Total Estimated.ort of th" building/wing as on 14.10.2017 date of I Rc ?R )11 Ao'7 t Cost incurred as on t+.1O.ZOt7-(based on the Rs.18.49.729 /- 2 Estimated cost) \Vork done in Percentag" 1us ferc*tug" of th" eqtimated cost) 6.54 % Balance Cost to be Incurred 6ui"a *Ertir*t"a 4 Rs 2r( 4)1 q61 /- Cost Incurred on Additionul,E*t.uiGrro u, * not included in the Estimated 5 Rs. Yours Faithfully MR. SUDHIR CIIANDRAKANT METKAR. Signatufe of Engineer