Ar, Toposyct Bendole Res:6, Blue BerryApartment, Bhavanjali Nagar, Off. Gangapur Road, Nashik-13. Contact : 9552592987, 0ZSg - 241BABO Email : tapasyabendale@yahoo.com Registration No. CA/2004/33306 I ARCMTECT' SCERTTFICATE Date:04.10.17 To, Nl/S Shweta Infrastructure & Housing (l) P\^.Ltd Samraat House, Tagore Nagar,Opp. Ambedkar Nagar, Nashik-Pune Highway, Tal. & Dist. Nashik,422006- Subject Certificate of Percentage of Completion of Construction Work of Samraat Symphony Project 02, Building l-Wing D, I Maha RERA Registration Number P516000027421othhe Project situated on Plot No. 84, S.No. 899/1+899/21+8991311184, Nashik Shiwar,demarcated by it's a boundaries (latitudri and longitude of the end points)6.00 Mt Wide Road (19.958338, 73.771772) to the North, Samraat Symphony Completed Project. 03(19.958070,73.771389) to the South,S.No.898 (19.9583287,73.771989) to the East and Samraat Symphony Project 01(19.958229,73.771791)to the West of Tal. & Dist. Nashik, PIN 422AO9, admeasuring 973.49 Sq. Mt.area being developed by M/S Shweta lnfrastructure & Housing (D Pvt. Ltd. Sir, I Ar. Tapasya H. Bendale,haveundertakenassignmentasan Architectof certiffing Percentage of Completion of Construc{ion Work of Samraat Symphony Project 02, Building 1- WngD,of Projed situated on Plot No- 84, S- No. 899/1+899/21+89913111M, Nashik Shiwar, admeasuring 973.49 Sq. Mt.area being developed By M/S Shweta lnfrastructure & Housing lndia Rrt. Ltd. 1. Following technical professionals are appointed by Owner/'Promoter:- (D Smt. Tapasya H. Bendaleas an Architect (iD Shri- Jayant lnamdar (STRUDCOM,Pune) as StructuralConsultant (iiD Shri. Sharadchandra Rao (ECEPH, Mumbai) as MEP Consultant Based on Site lnspection, with respect to each of the Building / Wing of the aforesaid Real Estate Project, I certiff that as on the date of this certiticate, the Percentage of Work done for each of the building I Wing of the Real Estate Project is as per table A herein below. The percentage of the work done executed with respect to each of the activity of the entire phase is in Table B. $ffiIilTXllo&"i'8fli.r Table A 1- D Percentage Sr. of work No Tasks /Activity done 1 Excavation 100% 2 Plinth 100 % 3 Podium 1OO o/o 4 Stilt Floor 1OO o/o 5 8 number of SIabs of Super Structure 15 o/o lntemal walls, lntemal Plaster, Floorings within FlatVPremises, Doors and Oo/o 6 Wndows to each of the FlaUPremises Oo/o Sanitary Fittings within the FlaUPremises, Electrical Flttings within the 7 FlaUPremises Oo/o Staircases, Lifts Wells and Lobbies at each Floor level connecting I Staircalses and Lifts, Overhead and Underground Water Tanks The extemal plumbing and extemal plaster,elevation, completion of tenaces Oo/o 9 with waterproofins of the BuildinqAMng, lnstallation of lifts, water pumps, Fire Fighting Fittings and Equipment as per Oolo CFO NOC, Electrical frftings to Common Areas, elec{ro, mechanical equipment, Comptiance to conditions of environment /CRZ NOC, Finishing 10 to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate -de Ft['-?XtXl ia &","33r1i'r 2 TABLE-B I ntemal&External DevelopmentWorksin RespectoftheentireReg isteredPhase - Percentage Sr. Proposed of Work No Common areas and Facilities, Amenities (Yes/No) done Details Internal Paved 1 lnternal Roads & Footpaths Yes Oo/o Driveways Oo/o To be obtain 2 Water Supplv Yes from NMC Sewerage (chamber, lines, Septic Tank, 3oo/o 3 STP) Yes Proposed Oo/o 4 Storm Water Drains Yes Proposed Oo/o Proposed on Podium & 5 Landscapinq & Tree plantinq Yes Periphery 6 Street Lighting Yes Oo/o Proposed 5oolo Club & 7 Community Buildings Yes Gymnasium Treatment and disposal of sewage and 3Oo/o I sullaqe water Yes STP Oo/o Ghantagadi, Nashik Municiple I Solid Waste management & Disposal Yes corporation 100 o/o Rain water 10 Water conservation, Rain water harvesting Yes Harvesting 11 Energy management Yes Oo/o LED Liqhtinq Oo/o Fire Fighting System, Lighting '12 Fire protection and fire safetv requirements Yes arrester Electrica! meter room, substation, receiving 60% 13 station Yes Substation ready 14 Aqqreqate area of recreational open space NA N,A. NA 15 Open Parking Yes 0o/o Proposed Yourc Faithfully, -/,1-' AT. TAPASYA H. BENDALE, (cA/2004133306) Ar. Tapasya H. Bendale (Reg. No. CA I 2004 / 33306)