, Ar. Toposyo Bendole Res : 6, Blue Berry Apartment, Bhavanjali Nagar, Off. Gangapur Road, Nashik-13. Contact : 9552592987, 02Sg- 2418080 Email : tapasyabendale@yahoo.com Registration No. CA/2004/33306 ARCHITECT'S CERTIFICATE Date:22-07-77 To, M/S Shweta lnfrastructure & Housing (l) Pvt.Ltd. Samraat House, Tagore Nagar,Opp. Ambedkar Nagar, Nashik-Pune Highway, Tal. & Dist. Nashik,4220ffi. Subject : Certificate of Percentage of Completion of Construction Work of Samraat Symphony Project 02, Building 1 - Wng D,of the Project situated on Plot No. 84, S.No. 899/1+899/21+899131118/, Nashik Shiwar, demarcated by it's a boundaries (latitude and longitude of the end points) 6.00 MtWide Road(19.958338,73.771772) to the North, Samraat Symphony Completed Project 03 (19.958070,73-771389) to the South,S.No.898 (19.9583287,73.771989) to the East and Samraat Symphony Project 01(19.958229, 73.771791) to theWest of Tal. & Dist.Nashik,PlN422009, admeasuring 973.49 Sq. Mt.area being developed by M/S Shweta lnfrastructure & Housing (l) Pvt. Ltd. Sir, I Ar. Tapasya H. Bendale, have under taken assignment as an Architect of certifying Percentage of Gompletion of Construction Work of Samraat Symphony Project 02, Building 1- WingD,of Project situated on Plot No. &4, S. No. 899/1+899/21+899H114, Nashik Shiwar, admeasuring 973.49Sq. Mt.area being developed By M/S Shweta lnfrastructure & Housing lndiaPvt. Ltd. 1. Following technical professionals are appointed by Owner/ Promoter:- (D Smt.Tapasya H. Bendaleas an Architect (iD Shri.Jayant lnamdar (STRUDCOM,Pune) as Structural Consultant (iii) Shri.Sharadchandra Rao (EGEPH, Mumbai)as MEP Consultant Based on Site lnspection, with respect to each of the Building / Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building / Wing of the Real Estate Project is as per table A herein below. The percentage of the work done executed with respect to each of the activity of the entire phase is in Table B. t*tiiltXlhfflS8ti'r Table A D Percentage Sr. of work No Tasks /Activity done 1 Excavation 10Oo/o 2 Plinth 75o/o 3 Podium 1OO o/o 4 Stilt Floor Oo/o 5 I number of Slabs of Super Structure 0o/o lnternal walls, lntemal Plaster, Floorings within Flats/Premises, Doors and 0o/o 6 Windows to each of the FlaUPremises 0o/o 7 sanitary Fittings within the FlauPremises, Electrical Fittings within the FlaUPremises Staircases, Lifts Wells and Lobbies at each Floor level connecting Oo/o 8 Staircises and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and extemal plaster,elevation, completion of terraces Oo/o with waterproofing of the BuildingMing, Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per Oo/o CFO NOC, Electrical fittings to Common Areas, electro, mechanical 't0 equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 4' Ar. TapasYa H. Bendale (Reg. N6. cA t 2oa4 / 33306) 2 l TABLE-B lntema! & External Development Works in Respect of the entire Registered Phase - Percentage Sr. Proposed of Work No Gommon areas and Facilities, Amenities (Yes/No) done Details lnternalPaved I lnternal Roads & Footpaths Yes Oolo Driveways 0o/o To be obtain 2 Water Supply Yes from NMC Sewerage (chamber, lines, Septic Tank, 30% 3 sTP) Yes Proposed Oo/o 4 Storm Water Drains Yes Proposed Oolo Proposed on Podium & 5 Landscaping & Tree planting Yes Periphery 6 Street Lighting Yes Oo/o Proposed 40o/o Club & 7 Community Buildings Yes Gymnasium Treatment and disposal of sewage and 30o/o I sullage water Yes STP Oo/o Ghantagadi, Nashik Municiple I Solid Waste management & Disposal Yes corporation Oo/o Rain water 10 Water conservation, Rain water harvesting Yes Harvestinq 11 Energy management Yes Oolo LED Liqhtinq Oo/o Fire Fighting System, Lighting 12 Fire protection and fire safety requirements Yes arrester Electrical meter room, sub-station, receiving 60% 13 station Yes Substation ready 14 Aggregate area of recreational open space NA N.A. NA 15 Open Parking Yes Oo/o Proposed Yours Faithfully, tll AT. TAPASYA H. BENDALE. (cA/2004/33306) 4* Ar. TaPasYa H' Bendale - (id.i6. CA t2oa4/ 33306)