Admn. Oflice : G-3, Ground Floor, Crown Commercial Complex, Opp. Ra.iiv Gandhi Bhavan, (N.M.C.), Sharanpur Road, Nashik - 422002. ANANT Ph.:2570435, 2317894, Fax:0253-2576393 TECHNOCRATS E-mail : ananttechnocrats@ gmail.com . ananttechnocrats@ redittmail.com PVT. LTD. . ENGINEERS . PROJECT MANAGERS r (CONCEPT TO C0MpLETtoN) FORM 1 (See Regulation 3l ARCH ITECTS CERTI FICATE Date- 02/07/2017 To, The Chairman/ Director Sun lnfrastructures Pvt. Ltd t -t/2,Suyojit Heights, Opp. Rajiv Gandhi Bhavan, Sharanpur Road, Nashik Subject : Certificate of Percentage of Completion of Construction Work of "suyojit One World Phase-!, Residential Sector" of Building - A, B & C, Wing - A to H of the Project situated on the land out of A) Survey No. 113/A/3.2, admeasuring H 00=88 R i.e. 8800.00 Sq.mtrs., having corresponding C.T.S. Nos. 4453, 4450 and 4444 (excluding CTS Nos. 445'J,A, 4452, 4448 & 4449), is bounded as - On Or Towards East : ByRoadoutof CTSNo.4444, On OrTowardsSouth : ByNashik-PuneRoad.OnOrTowardsWest : By Birla Hospital's Property out of CTS Nos. 4424 & 4447. On Or Towards North : By Birla Property out of CTS No.4444. B) Out of Survey No. 113A/14/6, admeasuring H 00=35 R i.e. 3500.00 Sq.mtrs., having corresponding C.T.S. No.4444 Part, is bounded as - East : By D. P. Road., South : By S. No. 1,13-Alt-Al7 (Durgesh Society) Part of CTS No. 4444, West : By Road out of CTS No. 4444 Part. North : By S. No. 1L3/AltAl4 & Birla Property. C) Out of Survey No. 113/8, admeasuring H 00=25 R i.e. 2600.00 Sq.mtrs., having corresponding C.T.S. Nos. 445lA,4452,4448and4449,isboundedasEast : ByRoadoutofCTSNo.4444South: ByCTSNos.4443 & 4440, West : By Birla Hospital's Property out of CTS Nos. 4447 & 4424 Part. North : By Southern Side of Birla Property out of CTS Nos. 4443 & 4440, Situated at Village Deolali, Taluka & District Nashik, within the jurisdiction of Sub Registrar Nashik, and within limits of Nashik Municipal Corporation, Nashik, PIN 42240L admeasuring 14900.00sq.mts. out which residential area admeasuring 6577.4O Sq.mtrs. is being developed by Sun lnfrastructures Pvt. Ltd. Sir, We M/s Anant Technocrats Pvt. Ltd have undertaken assignment as Architect /Licensed Engineer of certifying Percentage of Completion of Construction Work of the "suyojit One World-Phase-t, Residential Sector" of Building - A, B & C, Wing - A to H of the Project situated on the land out of Survey Nos. 113/4/3- 2, having corresponding C.T.S. Nos. 4453, 4450 and 4444 (excluding CTS Nos. 4451A, 4452,4448 & 44491, LL3Al7Al6 having corresponding C.T.S. No. 4444 Part, and 'J,1318, having corresponding C.T.S. Nos. 4451A, 4452, 4448 and 4449, of Division Nashik, Village Deolali, Taluka Nashik, District - Nashik, PIN 4220401 Admeasuring 14900.00sq.mts out of which residentialarea admeasuring6577.40Sq.mtrs. is being developed by Sun lnfrastructures Pvt. Ltd. 1. Following technical professionals are appointed by Promoter :- (i) M/s. Anant Technocrats Pvt. Ltd as L.S / Architect /Fellow of the lnstitution of Engineers(lndia) / Licensed Engineer. (ii) M/s. Reliable Enterprises as Structural Consultant (iii) M/s. K. K. Associates as MEP Consultant. (iv) Shri. Prasad Kale as Quantity Surveyor. Based on Site lnspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of theRealEstateProjectasregisteredvidenumber-underMahaRERAisaspertable A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Building No. A Sr. No. Tasks/Activity Percentage of word done 7 Excavation too% 2 1 number of Basement and Plinth too% 3 0 number of Podiums toj% 4 1 Stilt Floor 100% 5 7 number of Slabs of Super Structure too% 6 lnternal walls, lnternal Plaster LOO% Floorings within Flats/ Premises Doors and Windows to each of the Flat / Premises 7 Sanitary Fittings within the Flat/Premises, 100% Electrical Fittings within the Flat/Premises. 8 Staircases, Lifts Wells and Lobbies at each Floor level 90% connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, 100% completion of terraces with waterproofing of the Building/Wing. 10 lnstallation of lifts, water pumps, Fire Fighting Fittings and 90% Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building /Wing, Compound Wall and all other requirements as may be required to obtain Occupation /Completion Certificate. Building No. B Sr. No. Tasks/Activity Percentage of word done 7 Excavation 1.00% 2 1 number of Basement and Plinth LOO% 3 0 number of Podiums 1.OO% 4 1 Stilt Floor 100% 5 6 number of Slabs of Super Structure 1.OO% 6 lnternal walls, lnternal Plaster LOO% Floorings within Flats/ Premises Doors and Windows to each of the Flat / Premises 7 Sanitary Fittings within the Flat/Premises, 100% Electrical Fittings within the Flat/Premises. 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 90% Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, LOO% completion of terraces with waterproofing of the Building/Wing. 10 lnstallation of lifts, water pumps, Fire Fighting Fittings and 90% Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to obtain Occupation /Completion Certificate. Building No. C Sr. No. Tasks/Activity Percentage of word done 7 Excavation 1_OO% 2 0 number of Basement and PIinth 1.OO% 3 0 number of Podiums 1,OO% 4 1 Stilt Floor 1.OO% 5 5 number of Slabs of Super Structure 100% 6 lnternal walls, lnternal Plaster 700% Floorings within Flats/ Premises Doors and Windows to each of the Flat / Premises 7 Sanitary Fittings within the Flat/Premises, too% Electrical Fittings within the Flat/Premises. 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 90% Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, 100% completion of terraces with waterproofing of the Building/Wing. 10 lnstallation of lifts, water pumps, Fire Fighting Fittings and 90% Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to obtain Occupation /Completion Certificate. TABLE- B lnternal & External Development Works in Respect of the entire Registered Phase S. No. Common Areas and Facilities, Proposed Percentage of Details Amenities (Yes / Work done No) t lnternal Roads & Foothpaths Yes 100% Completed 2 Water Supply Yes 100% Completed 3 Sewarage (Chamber, lines Septic Yes 80% Will be completed before Tank, STP) Occupation Certificate 4 Storm Water Drains Yes 80% Will be completed before Occupation Certificate 5 Landscaping & Tree Planting Yes 80% Will be completed before Occupation Certificate 6 Street Lighting Yes 80% Will be completed before Occupation Certificate 7 Community Buildings Yes 90% Will be completed before Occupation Certificate 8 Treatment and disposal of sewage Yes 90% Will be completed before and sullage water Occupation Certificate 9 Solid Waste management & Disposal Yes 90% Will be completed before Occupation Certificate 10 Water conservation, Rain water Yes 90% Will be completed before harvesting Occupation Certificate tl Energy management Yes 90% Will be completed before Occupation Certificate 72 Fire protection and fire safety Yes 60% Will be completed before requirements Occupation Certificate 13 Electrical meter room, sub-station, Yes Will be completed before 90% receiving station Occupation Certificate L4 Aggregate area of recreational open Yes 700% Completed space 15 Open Parking Yes 100% Completed Yours Faithfully For Anant Technocrats Signature l\- (License No.69/2016) I N