Annexure A FORM 1 [See Regulation 3] ARCHITECT’S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 13-07-2026 To, ROYAL BUILDERS, PLOT NO 41, ROYAL APARTMENT, BEHIND LFHS, SHANTIPURA, AURANGABAD Subject: Certificate of Percentage of Completion of Construction Work of VIQUAR VILLAMENTS having MahaRERA Registration Number P51500080777 being developed by ROYAL BUILDERS. Sir, I / We ARCH. MOHD. HARES SIDDIQUI have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of VIQUAR VILLAMENTS having MahaRERA Registration Number P51500080777 being developed by ROYAL BUILDERS. Based on the Site Inspection, with respect to the Layout / each Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE-A Layout / Building / Wing Number __ for VIQUAR VILLAMENTS S. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100% 2 X number of Basement(s) and Plinth 25% 3 X number of Podiums ----- 4 Stilt Floor 0% 5 X number of Slabs of Super Structure 0% 6 Internal walls, Internal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/Wing 10 Installation of lifts, water pumps, Fire Fighting Fittings 0% and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Common Areas (Internal & External Development Works)_ for VIQUAR VILLAMENTS S. Common Areas & Propose Percentage Details No. Facilities d of actual (Yes / Work Done NO) (As on date of Certificate) (1) (2) (3) (4) (5) 1. Internal Roads & NO ----- N.A. Footpaths 2. Water Supply YES 15% INDIVIDUAL WATER CONNECTION from AMC AURANGABAD 3. Sewerage (Chamber, YES 0% CHAMBER LINES Lines, Septic Tank, STP) 4. Strom Water Drains NO ----- N.A. 5. Landscaping & Tree YES 0% INTERNAL PROJECT TREE Planting PLANTATION 6. Street Lighting YES 0% INTERNAL PROJECT STREET LIGHTS 7. Community Buildings NO ----- N.A. 8. Treatment & Disposal NO ----- N.A. of Sewage and Sullage Water 9. Solid Waste NO ----- N.A. Management & Disposal 10. Water Conservation / YES 0% TAINWATER HARVESTING Rain Water Harvesting AS PER NORMS 11. Energy Management NO ----- N.A. 12. Fire Protection & Fire NO ----- N.A. Safety requirements 13. Electrical Meter YES 0% MINIPILLAR & Room, Sub-Station, SANCTIONED CABLE FROM Receiving Station MSEB AS PER NORMS 14. Others (Option to NO ----- N.A. Add more) Yours faithfully, MOHAMMAD Digitally signed by MOHAMMAD HARES SIDDIQUI HARES SIDDIQUI Date: 2026.09.25 17:20:16 +05'30' ARCH. MOHD. HARES SIDDIQUI Signature & Name (IN BLOCK LETTERS) of Land Surveyor / Architect License Number : CA/2003/30896 Agreed & Accepted by: Signature of Promoter Name: ROYAL BUILDERS Date: 13-07-2026