R.B. & ASSOCIATES PLOT N0 12/B, NEW S.T. COLONY, SHANIMANDIR, AURANGABAD ANNEXURE A FORM-2A (See Regulation 3A] ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certificate) (To be submitted at endof the Financial Year) Date: 30-05-2026 To, THE ORIENS CORPORATION, PLOT NO 19 A, 2nd FLOOR, KAUTUK BUILDING, LIMAYAWADI, MITRANAGAR, BEHIND AKASHWANI, CHHATRAPATI SAMBHAJI NAGAR Quality Assurance Certificate (Certificate No. for the year ending 2025 - 26) Subject: Certificate for quality of materials used and quality of construction and workmanship for the work of ADINATH HEIGHTS having MahaRERA Registration Number P51500080444 being developed by THE ORIENS CORPORATION. Sir, T/ We ER. B. V. RAUT have undertaken the assignment of supervision of this Real Estate Plotting Project. Our Responsibility. To carry out the work in accordance withthe development permission and as per the approved plan, to submit certificate of supervision of work, tocarry out material testing in-situ or in an authorized laboratory as per prevailing andapplicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and /or other relevant code of practice. The details of the quality are as follows: Structural Design, Stability and Testing Sr. Parameters Yes No Remarks No Whether soil investigations of the site have been conducted before the structural design and soil YES AS PER GUIDELINES parameters have been accounted for in the structural design/ drawings? Name: B V RAUT License No: Whether Structural Engineer has been appointed for the NO DDMCB/RI2021/APL/01234 project? Mobile: +91 9765550125 E-mail: bvraut@gmail.com Whether the inspection registers, site order book and qualitycontrol test registers are maintained at the site NO NOT APPLICABLE properly and endorsed by the Engineer--in-Charge? Whether testing facilities to check quality of material is NO NOT APPLICABLE available at site? R. B. & ASSOCIATES PLOT No 12/B, NEW S.T. COLONY, SHANIMANDIR, AURANGABAD Whether the statuary provisions for disaster resistance/ 5 earthauake resistant design have been incorporated, NO NOT APPLICABLE especially in case of multistoried construction? Has suitable cognizance been taken on demarcated flood 6 lines and appropriate precautions taken for protecting the YES AS PER GUIDELINES site from flooding considering local flooding issues? 2 Input Materials Sr. Parameters Yes N Remarks No Whether the following building materials confirm to relevant IS/BSNBC Code, or as per Industry Standards? If yes, provide details: 1 (a) Cement, concrete and coarse aggregate YES AS PER SUPPLIER DETAILS (b) Steel and its alloys YES AS PER SUPPLIER DETAILS (c) Electrical wire, fittings and accessories NO NOT APPLICABLE (d) Plumbing and sanitary fittings YES AS PER SUPPLIER DETAILS Whether reqular tests of materials and construction products are being done from accredited labs also? If yes, NO NOT APPLICABLE details of such labs Whether manufacturer test certificate for cement, steel, 3 pipes etc. have been obtained and whether supply NO NOT APPLICABLE records are being maintained? Whether suitable water is being used for construction? () What is the source of water? YES FROM GROUND WATER TABLE (i) Has water been tested and approved by Engineer-in YES AS PER GUIDELINES 4 Charge before construction? YES NOTESTING DONE AS IT IS (ii) Has water been tested subsequently as per GROUND WATER requirement? 3 Quality of Workmanship Sr Yes No Remarks Parameters No Whether works of all the electrical wiring/ connections/ lift installation / other electrical installations have been 1 carried out under authorized /registered electrical engineer and whether records of the same has been NO NOT APPLICABLE maintained? Whether all related works of plumbing & sanitary including installation of water supply systems, drainage 2 systems, sewage systems, sinks, toilets etc. have been carried out under authorized Iregistered plumbers YES AS PER GUIDELINES sanitary contractors and whether records of the same has been maintained? Whether all the work is being carried out under supervision of experienced and skilled professional? 3 Further, whether the workmanship and quality is satisfactory and up to the mark and the work is within the YES IN CONTRACTOR'S SCOPE acceptable and permissible limits of deviations as per relevant Code of Practice? Whether remedial measures are undertaken to prevent NO NOT APPLICABLE dampness and leakages? If yes, provide details R. B. & ASSOCIATES PLOT NO 12/B, NEW S.I. C0LONY, SHANTMANDIR, AURANGABAD 5 Whether safety precautions are undertaken during NO NOT APPLICABLE Construction activities for all type of workers Miscellaneous Sr. Parameters Yes No Remarks No Whether third party quality inspection is belng carried 1 out on site during/after completion of the works? NO NOT APPLICABLE If yes, provide details Whether anti-termite treatment has been undertaken for YES AS PER GUIDELINES 2 the soil? Whether fire-fighting arrangements has been undertaken NO NOT APPLICABLE 3 under supervision of fire consultant? Whether proper signages have been installed on site NO NOT APPLICABLE completed building as per requirement? Whether precautions are undertaken to avoid air NO NOT APPLICABLE 5 pollution duringconstruction? Please specify. Whether records of all test reports / results have been NOT APPLICABLE 6properly kept in the prescribed formats and whether theto NO same are available at site for viewing by allottees and be handed over to the association of allottees? Whether all relevant records including sanctioned buildingplans, utility drawings, various test reports / 7 results have been properly kept in the prescribed NO NOT APPLICABLE formats to be handed over to the association of allottees? Any innovative/ cost effectivel green technology has been used for improving quality/energy efficiency? NO NOT APPLICABLE Please specify Yours faithfully, R2021 ENGGINE Signature of Engineer Name: ER. B. V. RAUT License No (if any): Mobile No: 9765550125 Place: CHHATRAPATI SAMBHAJI NAGAR Agred & Accepted by: THE ORIENS CORPORATION PARTNERSHIP R. B. & ASSOCIATES PLOT NO 12/B, NEW S.T. COLONY, SHAN I MANDIR, AURANGABAD Signature of Promoter Name: THE ORIENS CORPORATION Date: 30-05-2026