0-"- ioa o: ;_ $- Jtr -t\ arahtEe.:t5 E,t 0abaa planne?9 X> rntertof aeStqnet9 m) _lo aP?roved vatveaS Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: to. UNITY DEVELOPERS AURANGABAD, MAHARASHTM, 431 OO1 Subject : Certificate of percentage of Work of completion of construction work of PMAY U Tisgaon 227 C having MahaRERA Registration Number P51500080130 (Only Applicable after project Registartion) being developed by UNITY DEVELOPERS Sir, lAffe AR. SWAPNIL SHROFF have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of PMAY U Tisgaon 227 C having MahaRERA Registration Number P51500080130 (only Applicable after project Registration, being devetoped by uNtry DEVELopERs ) Based on Site Inspection,with respect to Layout / each of the Building/Wing of the aforesaid Real Estate project I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingffiing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A LayouUBu tdi Number: BLDG-AlA2/NA (1) (21 (3) 1 Excavation , 100.00 2 Basements (if any) 0.00 3 Podiums (if ?ny) .0.00 4 PIinth, 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 lnternal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises I Sanitary Fitting within the FlavPremises 0.00 I Staircases, lifts Wells and Lobbies at each Floor level Overheao and 0.00 Underqround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofinq of the Buildinq/winq. 11 Installatlon of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenUCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. AnV other activities. LayouUBu ild ingM/ing Number: BLDG-A3A4/NA {1) (2) (3) Excavation 100.00 2 Basements (if anV) 0.00 3 Podiums {if any) 0.00 4 Plinth, 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 lnternal walls, lnter_nal plaster, Floorings, Floors and windows within 0.00 F tats/Hremtses 8 Sanitary Fittinq within the FlaUPremrses 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underqround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces wiih 0.00 waterproofinq of the Buildinq/wino. 11 Installation of Lifts, water pumps, Fire Fighting Fiitjngs and Equipment as per 0.00 CFO NOC, Electrical fitting!, m6chanical e"quipftent, c6mpliance to conditiond of environmenUCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as.ma,y be required .to complete project as per specifications in agreement of >4le. Anv otner aclvtltes uilding/VVing Number: BLDG-A5A6/NA Percentage of Actual Work Done (As on date of the Certificate) 1 (21 (3) 1 Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if anV) 0.00 4 Plinth, 10.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 lnternal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises B Sanitary Fittinq within the FlaUPremises 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overheao anc: 0.00 Underqround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 watef proofinq of the Buildinq/winq. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fitting!, mbchanical e"quipftent, c6mpliance to conditioni of environmenVCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Buildingiwing, Compound Wail and all other requirements as may be required to complete project as per specifications in agreement of Sale. Anv other activities. LayouUBuild Number: BLDG-A7A8/NA (1) (21 (3) xcavatton 100.00 2 Basements (if anV) 0.00 3 Podiums (if anv) 0.00 4 Plinth, 20.00 5 0.00 6 Slabs of Super Structure 0.00 7 lnternal walls, lnternal plaster, Floorings, Floors and w'ndows within 0.00 Flats/Premises B Sanitarv Fittinq within the FlauPremises 0.00 I Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underqround Water Tanks 10 Exiernal plumbing and external plaster, elevation, completion of terraces with 0.00 wateroroofino of the Buildinq/wino. 11 Installation of Lifis, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittlngs, mechanical equipment, compliance to conditions of environmenvcRZ NOC, Finishing to entrance lobby/s, plinth proteciion,paving of areas appudenant to Building/Wing, Compound Wall and all other requiremenis as may be required to complete project as per specifications in agreement of Sale. Anv other activities. Number: BLDG-A9A10/NA TaskslActivity Percentage of Actual Work Done (As on date of the Certificate) (1| (21 (3) Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if anv) 0.00 4 PIinth, 15.00 5 Stilt Floor 0.00 6 Slabs of SuDer Structure 0.00 7 Internal walls, lnternal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitarv Fittino within the FlaVPremises 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underqround Waier Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterDroofino of the Buildino/wino. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenVCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Anv other activities. Number: BLDG-Al 1A12lNA (1) (21 (3) 1 Excavation 100.00 2 Basements (if anv) 0.00 3 Podiums (if anv) 0.00 4 'linth. 0.00 5 Stilt Floor 0.0c 6 Slabs of Suoer Structure 0.00 7 Internai walls, Internal plaster, Floorings, Floors and windows within 0.00 Flais/Premises 8 Sanitarv Fittinq within the FlaVPremises 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underqround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 wateroroofino of the Buildino/wina. Percentage of Actual Work Done (As on date oflhe Cenificate) 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipmenl as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance io condiiions of environmenVCRZ NOC, Finishing io entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specificalions in agreement of Sale. Anv other activities. Layout/Build Number: BLDG-A1 3A14/NA Percentage of Actual Work Done (As on date of the Certificate) (1) (2\ (3) Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 0.00 5 Stilt Floor 0.00 6 SIabs of Super Structure 0.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises I Sanitarv Fittinq within the FlaVPremises 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overheao ano 0.00 Underoround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 wateroroofinq of the Buildino/winq. 11 Insiallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance io condiiions of environmenVCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building^iving, Compound Wall and all othef requirements as may be required to complete project as per specifications in agreement of Sale. Anv other activities. td n uinq Number: BLDG-A1 5A1 6/NA (1) (21 (3) 1 Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth. 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitary Fittinq within the FlaUPremjses 0.00 I Staircases, lifts Wells and Lobbies at each Floor level Overheao and 0.00 Underqround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterDrooflnq of the Buildino/wino. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenvcRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building,^/Ving, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Anv other activities. Layout/Buildin Number: BLDG-A1 7A1 8/NA Tasks/Activity (1) (2\ (3) 1 Excavation 100.00 2 Basements (if anv) 0.00 3 Podiums (if anv) 0.00 lnternal walls, Internal plaster, Floorings, Floo[s and windows within Staircases, lifts Wells and Lobbies at each Floor level Overhead and External plumbing and exlernal plaster, elevation, completion of terraces with lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fiftingb, m6chanical e--quipitent, c6mpliance td conditiond of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to BuildingM-ing, Compound Wall dnd all other reqriiremeits as.may be required to complete project as per specifications in agreement of Table B - Gomm-on Areas (lnternal and External Development Works) in respect of Registered Phase / Project Number) Percentaqe of Actual WorE Done (As on date of [he Certificate) (1) (21 (3) &l (s) 1 Internal Roads & Footpaths NO 0.00 NA 2 Water Supply No 0.00 NA 3 Seweraqe (Chamber. Lines. Seotic Tank . STP) No 0.00 NA 4 Storm Water Drains NO 0.00 NA 5 Landscapino & Tree Plantinq NO 0.00 NA 6 Street Liqhtinq No 0.00 NA 7 Communitv Buildinos No 0.00 NA 8 Treatment And Disposal Of Sewaqe And Sullaoe Water No 0.00 NA I Solid Waste lvlanaqemenl And Disoosal No 0.00 NA '10 Water conservation /Rain water harvestino No 0.00 NA Energy managemcnt No 0.00 NA 1a Fire protection and lire safetv reouirements No 0.00 NA Electrical meter room, sub-station, receivinq station NO 0.00 NA Aggregate area of recreational Open Space Yes 0.00 As per Prooosed Plan 15 Open Parkinq No 0.00 NA D ,d\.' Yours Faithfully G \ I$ A hh[l (\---,/--Tt'- .,I,WV nt 1 f3 roq iF(,9 'A NG v^ AR. SWAPNIL SHROFF S jgnature & Name (lN BLOCK LETTERS) of L.S/ Arch jtect ( License No: CA,/1996/20610) Date of Certificate: Agreed and accepted by: re gnature of Promoter Name: Unity Developers Date: