FORM-2A , tSee Regulation 3A.l ENGINEERS'S CERTIFICATE FOR QUALIry ASSURANCE (Site Su pervisois Certificate) (To be submitted at the end of Financial year) Date:o7 t01t2025 To, The Aurathrone Infra Aurangabad (M Corp.), Aurangabad, Aurangabad, 431002 ' Quality Assurance Gertificate (Certificate No. ......................for the year Ending 31.03.2025 ) subject : certificate for quality of materials used and quality of construction and workmanship of the work of pMAy U sundarwadi g having MahaRERA Registration Number P51500079904 being developed by Aurathrone tnr." Sir, - I'/e . ......... .....-.. . have undertaken an assignment of supervision of this rear estate project Our Responsibility To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate ofsupervision ofwork, to carry out materialtesting in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality ofwork and workmanship as per prescribed specificatrons, ano as per NBC and / or other relevant code of oractice. The details of the quality are as follows : 1. Structural Design, Stabitity and Testing Whether soil investigations of the site has been conducted before the structural design and soil parameters have been accounted foi in the Whether Structural Engineer has been appointed for me ororect l Whether.the inspectton registers, site order book and quality control test registers are maintained at siteproperly the Slte Ine Ofooerlv and endorsed by fhc endo-rsed hv the Fnainear-in- Engineer-in- Whether testing facilities to check quality of material is avaiiable at site? Whether the statuary provisions for disaster resistance/earthquake resistant design have been incorporated, specially in case of multi-storeyed construction? Page 1 of3 Has suitable coonizance been taken on demarcated flood lines and ippropriate precautions taken for the site froh flooding considering local 2. Input Materials 1 Whether the following building materials confirm to Yes relevant IS/BS/NBC Code, or as per Industry Standards? lf yes, provide details: (a) Cement, concrete and coarse aggregate (b) Steel and its alloys (c) Eleckical wire, fiftings and accessories (d) Plumbing and sanitary fittings Whether reqular tests of inaterials and construction Yes products ar6 being done from accredited labs also? lf ves. details of such labs Whether manufacturer test certificate for cement, Yes steel, pipes etc. have been obtained and whether supplv records are beinq maintained? 4 Whether suitable water is being used for Yes construction? (i) What is the source of water? Well in adjoining falm site (ii) Has water been tested and approved by Yes Engineer-in-Charge before construction? (iii) Has water been tested subsequently as per Yes reouirement? 3. Quality of Workmanship 1 Whether works ot all the electricar wiring/connections/lift ;nstallation/other electrical Yet the stage has not come installations have been carried out under authorizediregistered electrical engineer and whether recorls of the same has b-een maintained? Whether all related works of plumbing & sanitary including installation of water supply systems, drainage systems, sewage systems, sinks, toilets Yet t}Ie stage has not com€ etc. have been carried out under authorized/registered plumbers/sanitary contractors and whether records of the same has been maintained? J Whether all the work is being carried out under yes supervision of experienced and skilled professional? Further, whether the workmanship and quality is satisfactory and up to the mark and the work is within the acceotable and oermissible limits of deviations as oer relevant Code of Practice? Whether remedial measures are undertaken to yes prevent dampness and leakages? lf yes, provide details 5 Whether safety precautions are undertaken during yes construction activities for all tvoe of workers? Page z oT J ,/ n.*r"""rr^n"or. Whether third party quality inspection is beinq yes carried o-ut on site during/after completion of t--he worKs l tt yesr provtde details. Whether anti-termite treatment has been undertaken yes for the soil? Whether firejighting arrangements has been Yot the stage has not come unqenaken under supervision of fire consultant? Whether proper signages have been lnstalled on yes srte/completed building as per requirement? Whether precautions are undertaken to avoid air yes pollution during construction? Ptease specify. b Whether records of all test reports/results have been yes properly kept in the prescribed formats and whether the same are available at site for viewino bv allottees and to be handed over to the adsotiation of allottees? 7 Whether all relevant recdrds including sanctioned yes building pians, utility drawings, variois test repoftsiresults have been properly kept in the prescribed formats to be hbncied 6vei to the association of allottees? o Any innovative/cost effective/green technology has Yes Alluform Shuttering has been used oeen useo ror tmprovrng quality/energy efflciency? r-rease spectry. Yours Faithllly N...--'t lA-'l Signatu16 of Engineer (Site Supervisor) Name: Surve Samarth Chandrakant Qualification (Not less than graduate) License No. (if any): Phone No: Place: Agreed and accepted by 6k Jl- \ Xc\ r \- lz Signature of Promoter Name: Aurathrone lnfra Date: G ,/ni "'<,/ Page 3 of3