ioa t; o: u) "lJ tr_ $- Jtr archttects E$ urr,an ?tanner5 a] _io tnxerlor ae9t4nef5 aTFfavea va t0 ef9 Annexure B FORM 2 -^,^,1:::::n:':y'r ENGINhEH'S CER TIFICATE (To be submitted at the time of Registration of Ongoing Project and for wiihdrawal of Money from Designated Account-Project Wse) Date: To, Aurathrone lnfra Aurangabad, MAHARASHTRA,43l002 Subject: Certificate of Cost Incurred for Development of PMAY U Sundarwadi g having MahaRERA Registration Number P51500079904 (Only Applicable after project Registartion) being developed by Aurathrone tnfra Sir, l/We Surve Samarth Chandrakant have of Certirying Estimated Cost for PMAY U Sundarwadi t havjng MahaRERA Registration Numbbr P51500079904 (Only Applicable after project Registration, being developed by Aurathrone Infra ) 2. We have Estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreements of sale. Our estimated cost calculaiions are bassd on the drawings/plans made available to us for the project under reference by the Developer / Consulatants. The Schedule of items and quantity required for the entire work as calculated by Quantity Surveyor* appointed by Developer/Engineer, the assumption ofthe cost of materiat,tabour and other inputs made by developer,and the site inspection carried out by us to ascertain / confirm the above analysis grven to us. 3. We estimate Total estimated the Cost of completion of thc aforesaid project under reference at Rs. 1089414051.00 (Total of Table A and B) at the time of Registratjon. The estimated Total Cost ofproject is with reference to thc Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal & external works,as per speciflcations mentioned in agreements of sale, and for the purpose of the obtaining occupation certificate / compleiion certificate for the Building(s) /Wing(s)/ Layout /Plotted Developmedt from the Chhratapati Sambhajinagar Municipal Corporation being the Planning Authority under whose jurisidiction the aforesaid project is being implemented. Cost incured till date is calculated at Rs. 48864876.45 (Total of Table A and B).The amount of is calculated on the basis of input mate@ffiilqq used and unitbost of these items. l of the Civil, IVIEP of th.e apartments and. _ . r chctin r$JFcf lf F Cdonyl ilr1an6.|Hiu-it.Vn.s., ph,r OA4O-t.329 ssocretes$SS @gff ert,dom proportionate Complition of internal & external works, as per specification mentioned in agreement of sale, of the Project is estimated at Rs 1040549174.55 (Total of Table A and B) 6. I certify that the Cost of the Civil, IVEP and allied works the for the apartments and proportionate ate lnternal & external works,as per specification mentioned in agreement of sale, of the aforesajd Project as completed on the date of this certificate is as given in Table A and B below: Table-A Building/ Wng /Layout Plotted Development bearing Number :A1-A2lNA Sr. No, Particulars Amount (ln Rs.) 1 Total Estimated Cost of the Building/Wng/Layout 102899647.00 Plotted Development as on date of Registration is 2 Cost incurred as on date of certificate 2570000.00 3 Work done in Percentage (as Percentage of the estimated cost) 2.50 4 Balance Cost to be Incurred**(Based on Estimated Cost) 100329647 .00 5 Cost lncurred on the Additional/Extra items not included in the 0 Estimated Cost (Table-C) Building/ Wing /Layout Plotted Development bearing Number:43-A4/NA Sr, No. Particulars 1 Total Estimated Cost of the Building/Wng/Layout 102899647.00 Plotted Development as on date of Registration is 2 Cost incurred as on date of certiflcate 2570000.00 3 Work done in Percentage (as Percentage of the estimated cost) 2.50 4 Balance Cost to be Incurred**(Based on Estimated Cost) 100329647.00 5 Cost Incurred on the Additional/Extra items not included in the 0 Estimated Cost (Table-C) Building/ Wing /Layout Plotted Development bearing Number:A5-A6/NA Sr. No. Particulars Amount (ln Rs.) 1 Total Estimated Cost of the Build ing/Wng/Layout 102899647 .OO Plotted Development as on date of Registration is 2 Cost incurred as on date of certificate 2570000.00 3 Work done in Percentage (as Percentaqe of the estimated cost) 2.50 4 Balance Cost to be lncurred*'( Based on Estimated Cost) 100329647 .O0 5 Cost Incurred on the Additional/Extra items not included in the 0 Estimated Cost (Table-C) Bullding/ Wing /Layout Plotted Development bearing Number :A7-A8/NA Sr. No. Particulars Amount (ln Rs.) 1 Total Estimated Cost of the Building,^/Ving/Layout 102899647 .00 Plotted Development as on date of Reqistration is 2 Cost incurred as on date of certificate 7202975.29 3 Work done in Percentaoe fas Percentaoe of the estimated cost) 7 .00 Balance Cost to be Incurred*"(Based on Estimated Cost) 95696671.71 5 Cost lncurred on the Additional/Extra items not included in the Estimated Cost (Table-C) Number :A9-A1o/NA Total Estimated Cost of the B Plotted DeveloDment as on date of Cost incurred as on date of certificate a s'- ("|'/ Balance Cost to be Incurred**fBased on 9569667't.71 ?{i ?.t<1 n:,:*21 Sr. No. Particulars Amount ln Rs.) 5 Cost Incurred on the Additional/Extra items not included in the 0 Estimated Cost (Table-C) Build Plotted Development bearing Number :A1 1-A12lNA Sr. No. Particulars Amount (ln Rs.) 1 Total Estimated Cost of the Building/Wing/Layout 102899647.00 Plotted Development as on date of Reoistration is 2 Cost incurred as on date of certificate 720297 5.29 3 Work done in Percentage (as Percentage of the estimated cost) 7.00 4 Balance Cost to be Incurred**(Based on Estimated Cost) 95696671.71 5 Cost Incurred on the Additional/Extra items not included in the 0 Estimated Cosi (Table-C) Building/ VVlng /Layout Plotted Development bearing Number :A13-A14/NA Sr. No. 1 Total Estimaied Cost of the Building/lving/Layout 102899647.00 Plotted DeveloDment as on date of Reoistration is 2 Cost incurred as on date of certificate 720297 5.29 3 Work done in Percentage (as Percentage of the estimated cost) 7.00 4 Balance Cost to be Incurred**(Based on Estimated Cost) 95696671.71 5 Cost Incurred on the Additional/Extra items not included in the 0 Estimated Cost (Table-C) Building/ Wng /Layout Plotted Development bearing Number :A15-A'16/NA Sr. No. Particulars 1 Total Estimated Cost of the Building/Wing/Layout 102899647.00 Plotted Development as on date of Registration is Cost incurred as on date of certificate 720297 5.29 3 Work done in Percentage (as Percentage of the estimated cost) 7.00 4 Balance Cost to be Incurred**(Based on Estimated Cost) 95696671.71 5 Cost Incurred on the Additional/Extra items not included in the 0 Estimated Cost (Table-C) Building/ Wng /Layout Plotted Development bearing ng Number :A17-A18/NA Sr. No. Particulars Amount (ln Rs.) Total Estimated Cost of the Building/Wing/Layout 102899647.00 Plotted Development as on date of Registration is 2 Cost incurred as on date of certiflcate 2570000.00 3 Work done in Percentage (as Percentage of the estimated cost) 2.54 4 Balance Cost to be Incurred**(Based on Estimated Cost) 100329647.00 5 Cost lncurred on the Additional/Extra items not included in the 0 Estimated Cost (Table-C) Building/ Wing /Layout Plotted Development bearing Number :Bl 82B3/NA Sr. No. Total Estimated Cost of the Building/VVing/Layout '102899647.00 Plotted Development as on date of Reqistration is 2 Cosi incurred as on date of certificate 2570000.00 3 Work done in Percentage (as Percentage of the estimated cost) 2.50 Balance Cost to be Incurred-.(Based on Estimated Cost) '100329647.00 5 Cost Incurred on the Additional/Extra items not included in the 0 Estimated Cost (Table-C) r',..' " Table B Internal and External Development Works in respect of the Registered Phase Padiculars 'l Total Estimated Cost of the Building/Wing/Layout 60417581 .00 Plotted Development as on date of Reqistration is 2 Cost incurred as on date of certificate 0 3 Work done in Percentage (as percentage of the estimated cost) 0 4 Balance Cost to be Incurred**(Based on Estimated Cost) 6041758'1 .00 5 Cost lncurred on the Additional/Extra items not included in the Estimated Cost (Tablc -C) Yours Faithfully nl---< V SURVE SAMARTH CHANDRAKANT Signature & Name (lN BLOCK LETTERS) with of Engineer [Not Less than bachelor's Degree. Hoider or equivalent as per Scction 2(u) of thc Act] Local Authority license no. (if applicable) Date of Certificate: Agreed and Accepted by: Signature of Promoter Name: Aurathrone Infra Daie: 1. The scope of work is to complete Registered Real Estate Prqect as per drawings approved from time to time and as per specifications mentioned in agreemeni of sale. 2.(-) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor,whose certificate of In case of independent quantity surveyor being appointed by Developer, the name has io be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer,the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3.(..) Batance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Prolect will result in amendment of the cost incurred / to be incurred. 4.All comoonents of work with speciflcations are indicative and not exhaustive 5.Please specify if there are any deviations / qualifications. put material used from of sale. los Y7 (JI ffi TABLE C List of Extra/Additional/Deleted ltems considered in Gost. (which were not part of the original Estimate of Total Cost) ffi ffi