!J :1- )n ^ rvcl ;r ",n ]J c_ $- !c: archttects c$ vf oan ?tannefS X: tnr,e f tof ae9t2nef9 J6 a??fovea vatuef5 Annexure A FORM 1 lsee Regutation 3l ARCHITECT'S CERTIFICATE (TobesubmittedatthetimeofRegistrationofongoingProjectandforWithdrawalofMoneyfrom Designated Account) Date: To, AUMTHRONE INFM AURANGABAD, MAHARASHTRA, 431002 Subject:CertifrcateofpercentageofWorkofcompletionofconstructionworkofPMAYUSundarwadi9havingby Registration Number p51500079904 (only Applicable after proJect Regisiartion) being developed MahaRERA AURATHRONE INFRA Sir, assignment as Architect /Licensed Surveyor of certifying uwe AR. swAPNlL SHROFF NAGAR have undertaken PercentageofcompletionofGonstructionWorkofPMAYUsundarwadighavingMahaRERA.RegisirationNumber being developed by AURATHRONE INFRA ) P51500079904 (Only Applicable after project Registration' BasedonSitelnspection,withrespecttoLayout/eachoftheBuilding/VMngoftheaforesaidRealEstateProjectI certifythatasonthedateofthiscertificate,thePercentageofWorkdoneforeachofthebui|ding/WngoftheRea| EsiateProjectunderMahaRERAiSaSperTableAhereinbelow'Thepercentageoftheworkexecutedwithrespectto Table B each of the activity of the entire phase is detailed in Table A LayouUBu ilding/wing Number: A1 -A2lNA Sr. No. (3) (1) 100.00 1 Excavation 0.00 2 Basements (if any) 0.00 D^.li"mc .!vl9lll: /if anv\ 3 :L:,-:l ----_-- 0.00 Plinth t\,'4 0.00 5 Stilt Floor 0.00 Jf c.:) .\ lslabs of Super Structure windows within 0.00 n"ll.J.,ternal plaster, Fooriq(ftgD5\and { \''{ tl\ ".{\ IlGt*""l Lrl :: t "t si9 Flats/Premises Fitri within the F ooo \o;\ :;:.: ..:{ i ,,: r\p|sn afrai*,t- riat'hrF /:.thrv- * r.andrltr.l-5 .im-i-l \*;*r;;')/ d# mellr arc-essoc ratss$S # @gmarl.conr v Sr" No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certiflcate) 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underoround Water Tanks 10 Extefnal plumbing and external plaster, elevation, completion of terraces with 0.00 waterprooflng of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electncal frtlings, mechanical e-quipirent, c-ompliance to conditiond o'l environmenVCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building^ /ing, Compound Wall and all other requirements as may be required to complete project as per speciflcations in agreemeni of Sale. Any other aciivities. LayouUBu ild ing/Wing Number: A3-A4/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth 0.00 5 Stilt FIoor 0.00 6 Slabs of Super Structurd 0.00 7 Internal walls, Internal plaster, Floorings, Floors and wjndows within 000 Flats/Premises B Saritary Fitting w'ihin the FlaVPremises 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks '10 External plumbing and exiernal plaster, elevation, completion of ierraces wiih 0.00 waterproofi ng of the Building/wing. 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fiitings, mechanical equipment, compliance to conditions ol environmenVCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving oj afeas appurtenant to Building^/y'ing, Compound Wall and all other requirements as may be required to complete poect as per specifications in agfeement ol Sale. Any other activities. Layo uUBu ild ing/Wing Number: A5-A6/NA Internal walls, lnternal plaster, Floorings, Floors and windows within Flats/Premises Staircases. lifts Wells and Lobbies at each Floor level Overhead and External plumbing and external plaster, elevation, completion of terraces wiih waterDroofino of the Buildino/winq. lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance io conditions ol environmenVCRZ NOC, Finishing to entrance lobby/s, plinth proteciion, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per speciflcations in agreement of ilding/Wing Number: A7-A8/NA #"{u Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date ofthe Certificate) 1 Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 70.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 FIais/Premises 8 Sanitary Fitting within the FlaVPremises 0.00 9 Staircases, lifls Wells and Lobbies at each Floor level Overheao and 0.00 Underground Water Tanks '10 Exiernal plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofing of ihe Building/wing. 11 lnstallalron of Lifts. water punps, Fire Frghtrng Fitiings and Equipment as per 0.00 CFO NOC. Electrical frttings, mbchanicat equrpirent, c-ompliance td conditiond ol environment/CRZ NOC, Finishing to entrance lobby/s, plinth protectron,paving of areas appurtenant to Building,^/Ving, Compound Wall and all other reqLiiremdnts as.rnay be.required to complete project as per specifications in agreement of 5ate. Any olner acttvtttes. LayouUBuilding/Wing Number: A9-A10/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date oi the Certificate) (1) (21 (3) Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 Plinlh, 70.00 5 Stilt Floor 0.00 6 Slabs of Super Slructure 0.00 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 0.00 Flats/Premises B Sanitary Fjtting within the Flat/Premises 0.00 9 Siaircases, lifts Wells and Lobbies at each Floor level Overheao anq 0.00 Underoround Water Tanks '10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofi ng of the Building/wing. 11 lnstallation of Lifls, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical frttrngb, mbchanical equipment, cbmpliance tci conditiond ol environmenVCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Buildinglr'Ving, Compound Wall and all other requirements as.may be required.lo complete project as per specifications in agreement of Jale. Any olner acttvrttes. LayouUBuilding/Wing Number: Al 1 -A1 2/NA Internal walls, Internal plaster, Floorings, FIoors and windows within Flats/Premises Staircases, lifts Wells and Lobbies at each Floor level Overhead and External plumbing and external plaster, waterproofi nq of the Buildino/winq. '1"9 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certiflcate) '11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electriial f!ttings, mbchanical equipment, compliance to conditions ol environmenVCRZ NOC, Finishing to entrance lobby/s, plinih protection, paving oi areas appurtenanl lo BuildingruVrng. Compound Wall and all olher requirements as mav be requrred to complete project as per speciflcations in agreement ol Sale. Any other activities LayouUBu td Nu mber: A13-A14/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date ol the Cerlificate) ,| (21 (3) '100.00 Excavation 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 70.00 5 Stilt Floor 0.00 6 Slabs of Super Struciure 0.00 7 Internal walls, lnternal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Saritary Fitting within the FlaUPrenises 0.00 I Staircases. lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underoround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofinq of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fltting!, mechanical equ pment, compliance to conditions of environmenUCRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building^/Ving. Compound Wall and all other requirements as mav'6e requrred to comalete aroject as per specifications in agreement of Sale Any other activities. Layo uUBu ild in g/Wing Number: A15-A16/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) 1 (21 (3) 1 Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 70.00 5 Stilt Floor 000 6 Slabs of Super Structure 0.00 7 lnternal walls, Internal plaster, Floorings, Floors and windows withan 0.00 Flats/Premises 8 Sanitary Fitting within the FlaVPremises 000 9 Siaircases. lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks '10 Extefnal plumbing and external plaster, elevaiion, completion of terraces wlth 0.00 waterorooflno of the Buildinq/winq. 11 Installation of Lifts, water pumps, Fire Fightlng Fillings and Equipment as per 0.00 CfO nOC, Electriial fitting;, mbchanical equipment, comphance to.conditions of NOC, FIni;hing to entrance lobby/s' plrnlh protect ion, paving of areas aopurtenant to Bullorng^/Vrng. Compound Wall and all oiher requIements "nuironr"hUCRz ;" fu;'b; iequireo to com6lete Froject as per specifrcations in agreement of Sale. Any other achvities LayouUBuilding/Wing Number: A1 7-A18/NA Sr, No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) Plinth, 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 Internal walls, lnternal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitary Fitting within the FlavPremises 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks '10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofi ng of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions 01 environmenUCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving ol areas appurtenant to Building^Nlng, Compound Wall and all other requirements as may be required to complete project as per speciflcations in agreement ol Sale. Any other activities. LayouUBuilding/Wi um ber: Bl 82B3/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date ofthe Certificate) (1) (21 (3) 1 Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 0.00 5 Stilt Floor 0.00 Slabs of Super Structure 0.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitary Fitting within the FlatFremises 0.00 I Staarcases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underoround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ol environmenUCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving ol areas appurtenant to Building^/Ving, Compound Wall and all other requirements as may be required to complete poect as per specifications in agreement ol Sale. Any other activities. iffi.r:t t{.:-,n}ili :'rE)' c\:---;J,: j r .c, :.".; Table B - Common Areas (lnternal and External Development Works) in respect of Registered Phase / Project Number) (1) (2) (3) (41 (5) 1 Intemal Roads & Footpaths No 0.00 NA Water Supply No 0.00 NA Sewerage (Chamber, Lines, Septic Tank , STp) No 0.00 NA 4 Storm Water Drains No 0.00 NA Landscaping & Tree Planting No 0.00 NA 6 Street Lighting No 0.@ NA 7 Community Buildings No 0.00 M 8 Treatment And Disposal Of Sewage And Sullage Water No 0.00 NA Solid Waste Management And Disposal No 0.00 NA 10 Water conservation /Rain water harvestino No 0.00 NA 11 trnerov manaoemcnt No 0.00 M 1? Fire protection and fre safety requirements No 0.00 NA 13 Electrical meter room, sub-station, receiving station No 0.@ NA 14 Aggregate area of recreational Open SDace Yes 0.00 As per Proposed Plan 1C Open Parking No 0.00 M ffi Yours Faithtully AR. SWAPNIISHROFF signature & Name (tN BLOCK LETiEF6-) of L.s/ Arch itect ( License No: CA,/1996/20610) Date of Certificate: Agreed and accepted by: <^!,.---- Signaturc of Promoter Name: Aurathrone Infra Date: Y9