U l- 0 l $ -c o f s - f !- F {\ a ; 4 Balance Cost to be incurred" {Based on Estimated Cost) 60417581,46 Cost Insurred on Additional /Extra items not included in the 0.00 Estimated Cost {Tabte -C) Yours Faithfutty, Engineer Mr. Samarth surve A,greed and Accepted by: F-RA w For M/S Aurathrone lnfra g'g @?lfia$ ,co6