u :1- aoa :L o; t_ $- llg -t\ arcnttects EN uf0aA Plannefs R5 rnterfor deStaner9 _i(n 2P?rOVeA VAtV ef9 Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: lo, UNIry DEVELOPERS AURANGABAD, MAHARASHTRA, 431 OO1 Subject : Certificate of percentage of Work of completion of construction work of PMAY U Tisgaon 227 B having MahaRERA Registration Number P51500080093 (Only Applicable after project Registartion) being developed by UNITY DEVELOPERS Sir, l/We AR. SWAPN|L SHROFF have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of PMAY U Tisgaon 227 B having MahaRERA Registration Number P51500080093 (Only Applicable after project Regislration, being developed by UNITY DEVELOPERS ) Based on Site lnspection,with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Vving of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A lcli Number: BLDG-A1A2/NA : "r:!:''Y'' '..'. (1) (21 (3) Excavation '100.00 2 Basements (if anv) 0.00 3 Podiums (if anv) 0.00 4 Plinth. 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 7 Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitarv Fittino within the FlaVPremises 0.00 Tasks/Activity I Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underqround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 wateroroofino of the Buildino/wino. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenvcRZ NOC, Finishing 10 entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Anv other activities. LayouUBuilding/Wing Number: BLDG-A3A4/NA Percentage of Actual Work Done fAs on date of the Certiflcate) (1) (2',1 (3) Excavation 100.00 2 Basements (if anv) 0.00 3 Podiums (if anv) 0.00 4 Plinth 0.00 5 Stilt Floor 0.00 6 Slabs of Suoer Structule 0.00 7 Internal walls, Intern a plaster, Floorings, Floors and windows within I 0.00 Flats/Premises B Sanitarv Fittino within the FlaVPremises 0.00 I Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underoround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofi nq of the Buildinoiwinq. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenvcRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building,ryVing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement oJ Sale. Anv other activities. LayouUBuilding/vving Number: BLDG-A5A6/NA Percentage of Actual Work Dohe {As on date of the Certificate) (1) (21 (3) Excavation 100.00 2 Basements (if anv) 0.00 3 Podiums (if anV) 0.00 4 Plinth, 0.00 5 Stilt Floor 0.00 6 Slabs of SuDer Siructure 0.00 7 lnternal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitarv Fittinq within the FlaVPremrses 0.00 9 Slaircases, lifts Wells and Lobbies al each Floor level Overhead and 0.00 Underqround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterorooiino of the Buildino/winq. 1'l Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenUCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications jn agreement of Sale. Anv other activities. LayouUBuildingruing Number: BLDG-A7A8/NA Percentage of Actual Work n^ha fAs on date of the Ceftificate) 1 Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if anv) 0.00 Elitth, 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 lnternal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitarv Fittinq within the FlaVPremises 0.00 I Staircases, lifts Wells and Lobbles ai eacn F loor level Overhead and 0.00 Underqround Water Tanks 10 External plumbing and external plaster, elevaiion, completion of terraces with 0.00 waterproofinq of the Buildino/winq. 11 lnstallation of Lifls, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fitting3, m6chanical e-quiphent, c6mpliance to condiiions ol environmenVCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specjfications in agreement of Sale. Anv othei activities. Layout/Build ng Number: BLDG-A9A10/NA (1) (21 (3) Excavation 100.00 2 Basements (if anv) 0.00 3 Podiums (if any) 0.00 4 Plinth 0.00 5 Stilt Fioor 0.00 6 Slabs of Super Structure 0.00 7 Internal walls, lnternal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 SanitarV Fittinq within the FlaVPremrses 0.00 I Staircases, lifts Wells and Lobbies at each Floor level Overheao and 0.00 Underoround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofinq of the Buildinq/winq. 11 Insiallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenVCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as,ma"y be required .to complete project as per specifications in agreement of Jare. Anv olner acUV|l|es. Layout/Buildi Number: BLDG-A1 1A1 2/NA Tasks/Activitv {1} (21 (3) Excavation r00.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 25.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitary Fiitinq within the FlavPremises 0.00 I Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underqround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofi nq of the Buildinq/winq. Sr, No. 11 Installation of Lifts, water pumps, Fire Fighting Fitiings and Equipment as per 0.00 CFO NOC, Electrical littings, mechanical equipment, compliance to conditions of environmenUCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Buildingn\/ing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Anv other activities. tdi Number: BLDG-A'1 3414/NA Sr. No. Tasks/Activity (1) (21 (3) Excavation 100.00 2 Basements (if anv) 0.00 3 Podiums (if any) 0.00 4 Plinth, 40.00 5 Stilt Floor 0.00 6 Slabs of Suoer Structure 0.00 7 Internal walls, lnternal plaster, Floorings, Floors and windows within 0.00 Flats/Premises I Sanitarv Fittinq within the FlaVPremises 0.00 9 Staircases, lifts Wells and Lobbies at each Floor ievel Overhead and 0.00 Underqround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 wateroroofino of the Buildino/wino. 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ol environmenvcRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/vving, compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Anv other activities. tdi Number: BLDG-A15A16/NA : ,Sr. No, Task5/Activity . (1) (21 (3) 1 Excavation 100.00 2 Basements (if anv) 0.00 3 Podiums (if anv) 0.00 4 PIinth. 15.00 5 Stilt Floor 0.00 6 Slabs of Suoer Structure 0.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitarv Fittino within the FlaUPremises 0.00 I Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underoround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofino of the Buildinq/winq. 't1 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenVCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Bujldjng/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Anv other activities. Number: BLDG-Al 7A1 8/NA Sr. No. (1) (2\ (3) 1 Excavation '100.00 2 Basements (if anv) 0.00 3 Podiums (if anv) 0.00 Plinth. 15.00 5 Stilt Floor 0.00 6 Slabs of Suoer Structure 0.00 7 Internal walls, Interna I plaster, Floorings, Floors and windows within 0.00 Flats/Premises I Sanitarv Fittinq within the FlaUPremises 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underoround Water Tanks '10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterDrooflno of the Buildinq/wino. 11 lnstallation ol Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenVCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requiremenis as may be required to complete project as per specifications in agreement of Sale. Anv oiher activities. Id /Wino Number: BLDG-A19A20/NA (2\ (3) Excavation '100.00 2 Basements (if anv) 0.00 3 Podiums (if anv) 0.00 4 Plinth. 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 lnternal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitarv Fittinq within the FlaVPremises 0.00 I Sta;rcases. lifts Wells and Lobbies ai each Floor level Overhead and 0.00 LJnderoround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 wateroroofinq of the Buildinoiwino. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenVCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Anv other activities. u tdi nq Number: BLDG-A21A22/NA Sr. No. Percentage of Actual Work Done fAs on date of the Certificate) (1) (2\ (3) Excavation 100.00 2 Basements (if anv) 0.00 3 Podiums (if anv) 0.00 4 Plinth, 0.00 5 Stilt Floor 0.00 6 Slabs of Suger Structure 0.00 7 Internal walls, Internal plaster, Floorings, FIoors and windows within 0.00 FIats/Premises I Sanitarv Fittino within the FlavPremises 0.00 I Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underoround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 wateroroofi no of the Buildino/wino. LayouVB! r/Winq Number: BLDG-A23A24/NA (1) (2\ (3) Excavation 100.00 2 Basements (if anV) 0.00 3 Podiums (if anv) 0.00 4 Plinth 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 lnterlal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Hremtses I Sanitary Fittino within the FlaVPremises 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overheao anq 0.00 Underqround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofi nq of the Buildinq/wino. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenvcRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appudenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Anv other activities. Layout/Bu td Number: BLDG.A25A26/NA Percentage-.Of.Actual Work . rD6iie : i (As on det€t dlthe Certificate) {1) (2) (3) Excavation 100.00 2 Basements (if anv) 0.00 3 Podiums (if anv) 0.00 4 0.00 5 Stilt Floor 0.00 6 Slabs of Suoer Structure 0.00 7 Internal walls, lnternal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitarv Fittino within the FlaUPremises 0.00 I Slaircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underqround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofinq of the Buildinq/winq. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenUCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving o{ areas appurtenant to Building/!Ving, Compound Wall and all other requirements as may be required to complete project as per specificaiions in agreement of Sale. Anv other activities. ng Number: BLDG-M7A28/NA .Sr;,No, (1) (2\ (3t Excavation 100.00 2 Basements (if anV) 0.00 3 Podiums (if any) 0.00 Sr. No. ... t. " 4 Plinth, 0.00 5 Stilt Floor 0.00 6 Slabs of Suoer Structure 0.00 7 lnternal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises I Saniiary Fittinq within the FlaVPremises 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underoround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces wiih 0.00 wateroroofinq of the Buildinq/winq. 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenVCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Buildingruing, Compound Wall and all oiher requirements as may be required to complete projeci as per specifications in agreement of Sale. Anv other activities. Layout/Building/VVing Number: BLDG-A29A30/NA 51. No. (1) (21 (3) 1 Excavation 100.00 2 Basements (if anv) 0.00 3 Podiums (if anv) 0.00 4 Plinth, 0.00 5 Stilt Fioor 0.00 6 Slabs of SuDer Structure 0.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitarv Fittino within the FlaVPremises 0.00 I Staircases, lifts Wells and Lobbies at each Floor Overhead and 0.00 Underoround Water Tanks 'evel '10 External plumbing and external plaster, elevation, completion of terraces with 0.00 wateroroofi no of the Buildinq/winq. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenUCRz NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building^/Ving, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Anv other activities. ngN umber: BLDG-A31A32/NA sl. Nol I Tasks/ActiviW (1) (21 (3) Excavation '100.00 2 Basemenls (if anV) 0.00 3 Podiums (if anv) 0.00 4 Plinth. 0.00 5 Stilt Floor 0.00 6 Slabs of Suoer Siructure 0.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises I Sanltarv Fittinq within the FIauPremises 0.00 I Staircases, lifts Wells and Lobbies at each Floor level overhead and 0.00 Underqround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 wateroroofino of the Buildino/winq. 11 Installation of Lifts, water pumps, Fire Fighling Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenvcRZ NOC, Finishing to entrance lobby/s, plinth prolection,paving of areas appurtenant to Building,\iving, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. AnV other activities. ldingruing Number: BLDG-A33A34/NA Sr. Nolr (2) (3) Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 lnlernal walls, Internal plasler, Floorings, Floors and windows within 0.00 rtats/Hremlses 8 SanitarV Fittinq within the FlaVPremises 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overheao ano 0.00 Underqround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofi ng of the Buildinq/winq. 11 Inslallation of Lifts. water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Eleckical fittings, mi:chanical equipment, compliance to conditioni of environmenVCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building^\/ing, Compound Wall and all other requirements as may be required to complete project as per specifications jn agreement of Sale. Anv othei activities. Layout/Buildi Number: BLDG-A35A36/NA (1) (2) (3) 1 Excavation 100,00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 'linth. 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 lnternal walls, Internal plaster, Floorings, Floors and windows wilhin 0.00 l- lals/Hremtses B Sanitarv Finino within the FlaUPremrses 0.00 I Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underqround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterprooflnq of the Buildinq/winq. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equjpment, compliance to conditions of environmenUCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Anv othei activities. Number: BLDG-A37A38/NA Tasks/Activity Percentage of Actual Work Done (As on date of the Ceftificate) 4 PIinth, 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 Internal walls, Interna I plaster, Floorings, Floors and windows within 0.00 Flats/Premises q Sanitary Fittinq within the FlaUPremises 0.00 9 Staircases, Iifts Wells and Lobbies at each Floor level Overheao ano 0.00 Underground Water Tarlks 10 External p.lumbing alld.external plaster, elevation, compleiion of terraces with 0.00 waterproofi nq of the Building/wing. ll:Jgll?I91'r 9l Lifts, w_ater pumps, Fire Fighting Firrings and Equipmenr as per 11 0.00 ur-(-./ r\\ru, trtecrncat lUngs, mechantcat equrpment, compliance to conditions of environment/CRz.NOC, Finish_ing to entrance lobby/s, ptinth pfotection,paving of areas appurtenant to Buildingniving, Compound Wall and all other requirements as,ma^y be required.to complete project as per specifications in agr'eement of Dare. Any olner aclvttes. ldingruing Number: BLDG-A39A40/NA (1) (21 (3) Excavation 100.00 2 Basements (ifanV) 0.00 3 Podiums (if anV) 0.00 4 Plinth, 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 0.00 FIAIS/HTCMISCS I Sanitary Fitting within the Flat/Premises 0.00 I Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underqround Water Tanks 10 External p_Jumbing and external plaster, elevation, compJetion of terraces with 0.00 waterproofing of the Buildingiwing. 11 [:Fll?Igf gl Lifts, w-ater pumps. Fire Fightrrg Fittings and Equrpmenr as per 0.00 uru l\u\.. trlecrncat tUngS. mechantcat equtpment. compliance to conditions ol environmenvcRZ.NOC, Finishing to entrance lobby/s, plirith protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other reqLiiremenrs as,ma.y be required.to complete project as per specifjcations in agrbement of )are. Anv otner acttvtttes. LayouUBuilding/Wing Number: BLDG-A41A42/NA Sr. No. 1 (2\ (3) 1 Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 lnternal walls, Internal plaster, Floorings, Floors and windows within 0.00 FIAIS/HTCMISES B Sanitary Fittinq wiihin the FlavPremjses 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underqround Water Tanks '10 External p"lumbing and. external plaster, elevation, completion of terraces with 0.00 waterproofinq of the Building/wing. '11 lnstallatio_n ot Lifts, waler pumps. Fire Fighting Fittings and Eouipment as pef 0.00 CFO NOC. Electrical fittings. mechanical equipment, c6mptiance to conditiond of environmenVCRZ.NOC, Finishing to entrance lobby/s. plinth protection,paving ol areas appurtenanI to Building/Wing, Compound Wal and atl other reqLiirements as,ma.y be required .to complete pfoject as per specifications in agrbement of Jale. Any olner acIV[les. Number: BLDG-A43A44/NA (1) (21 (3) Excavation 100.00 2 Basements (if any) 0.00 3 Podiums {if any) 0.00 4 Plinth, 0.00 5 Stilt Floor 0.00 6 Slabs of Super Etructure 0.00 7 lnterlal walls, Internal plaster, Floorings, Floors and wjndows within 0.00 FIaIS/Premtses 8 Sanitary Fitting within the FlaUPremrses 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks 10 External p_lumbing and external plaster, elevation, completion of terraces with 0.00 waterproofino of the Buildinq/winq. 11 Installation of Lifts. water pumps. Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings. mechanical equipment, c6mpliance to condit,ons of environmenUCRZ.NOC, Finishing to entrance lobbv/s, plinih protection,paving of areas appurtenant to Building/Wing, Compound W;lJ and all other reqriiremdnts as,ma,y be required .to complete project as per specifications in agrbement of >ale. Anv olner actrvrtres. itd Number: BLDG-A45446/NA (1) (21 (3) Excavation '100.00 2 Basements (if anV) 0.00 3 Podiums (if a!y) 0.00 4 Plinth, 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 lnternal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitary Flttinq within the Flat/Premises 0.00 I Staircases, lifts Wells and Lobbies at each Floor level Overheao ano 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofi ng of the Buildinq/winq. 11 Inst_allation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipirent. c6mpliance to conditions ot environmenVCRZ.NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building^iving. Compound Wall and all other requirements as.may be required to complete project as per specifications in agreement of Sale. Any other activities. itdi Number: BLDG-A47A48/NA (1) (21 (3) 1 Excavation 100.00 Basements (if anv) 0.00 3 Podiums (if any) 0.00 4 PIinth, 0.00 5 Stilt Floor 0.00 6 Slabs of Super 9tructure 0.00 7 lnternal walls, Internal plaster, Floorjngs, Floors and windows within 0.00 Flats/Premises 8 Sanitary Fitting within the FlavPremises 0.00 9 Staircases, lifts Wells and Lobbres at each Floor level Overhead and 0.00 Underground Water Tanks 10 External plumbing and externai plaster, elevation, completion of terraces with 0.00 waterproofing of the Building/winq. 11 [':t^alla-!o^n gl Lifls, ],v,9!9r pumps, Fire Fightjog Firtings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance lcj conditions of environmenUCRZ NOC, Finishing to entrance lobby/s, plinih protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other reqLjirementS as,ma,y be required .to complete project as per specifications in agrbement of pare. Any otner acltvtttes. LayouUBuildingruing Number: BLDG-A49A50/NA (1) (21 (3) 1 Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if anV) 0.00 4 Plinth, 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 lnternal walls, Internal plaster, Floorings, Floors and wjndows within 0.00 hIAtS/PTCMISES 8 Sanitary Fitting within the FlaVPremises 0.00 I Staircases, lifts Wells and Lobbies at eacn F loor level Overhead and 0.00 lbderground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofinq of the Buildinq/winq. 11 Installation oi Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC. Electrical fittings, mechanical equipment, c6mpliance to conditiond of environmenvcRZ.NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appudenant to Building/Wing, Compound Wall and all other reqLiirements as,may be required.lo complete project as pef specifications in agreement ol 5ale. Anv omer actrvrtres LayouVBuildin ng Number: BLDG-A51A52/NA (1) (2\ (3) 1 Excavation 100.00 2 Basements (if anv) 0.00 3 Podiums (if any) 0.00 4 Elinth, 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 lnternal walls, Internal plaster, Floorjngs, Floors and windows wjihin 0.00 Flats/Premises 8 Sanitary Fitting within the FlaVPremrses 0.00 I Staircases, lifts Wells and Lobores at each Floor level Overhead and 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterprooflng of the Buildinq/winq. Installation of Lifts, water pumps, Fire Fiqhtinq Fittinqs and Eouioment as Der CFO NOC, Electrical fittings, mi:chanical equipirent, c6mptiance td conditiona of environmenvcRZ.NOC, Finish_ing to e-ntrance lobby/s, plinth protection,paving of areas appurtenant to BuildingMing, Compound Wall a'nd all'other reqtiiremeints as.ma.y be required -to complete project as per specifications in agreement of Sale. Anv other activities- r Table B - Comm.on A.rea.s (lnternal and External Development Works) in respect of Registered Phase / Project Number) I (21 (3) (4\ t5l 1 lnternal Roads & Footpaths No 0.00 NA 2 Water Supply No 0.00 NA 3 Sewerage (Chamber, Lines. Septic Tank , STP) NO 0.00 NA 4 Storm Water Drains No 0.00 NA 5 Landscapinq & Tree Plantinq No 0.00 NA 6 Skeet Liqlrting NO 0.00 NA 7 Community Buildings No 0.00 NA I Treatment And Disposal Oi Sewaqe And Sullaqe Water No 0.00 NA 9 Solid Waste l\.4anaqement And Disoosal No 0.00 NA 10 Water conseryation /Rain water harvestinq No 0.00 NA 11 EnerqV managemcnt No 0.00 NA 12 Fire protection and [ire safdtv requirements No 0.00 NA Electrical meter room, sub-station, receivino stalion No 0.00 NA 14 Aggregate area of recreational Open Space YeS 0.00 As per ProDosed Plan 15 Open Parking No 0.00 NA Yours Faithfully _ffi Signature & Name (lN BLOCK LETTERS) of L.S/ Architect ( License No: CAJ1996/20610) Date of Certificate: Agreed and accepted by: )""'--' hature of Promoter Name: Unity Developers Date: