ioa r; ',o .p c_ $- Js archttects trN vfoan X> tntertor ?tannef5 4e.9t 4n ef 5 a??rovea va10er5 Annexure A FORM 1 lsee Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing project and for virithdrawal of Money from Designated Account) Date: To, SAHAKAR JV AURANGABAD, MAHARASHTRA, 431001 Subject : Certificate of percentage of Work of completion of construction work of pMAy U Tisgaon 225 B having MahaRERA Registration Number P51500079996 (Only Appljcable after project Registartion) being developed by SAHAKAR JV Sir. UWe AR. SWAPNIL SHROFF have undertaken assignment as Architect /Licensed Surveyor of certifying percentage of completion of Construction Work of PMAY U Tisgaon 225 B having MahaRERA Registraiion Number P51500079996 (Only Applicable after project Registration, being developed by SAHAKAR JV ) Based on Site Inspection,with respect to Layout / each of the BuildingA/Ving of the aforesald Real Estate pro.Ject I certify that as on the date of this certiflcate, the Percentage of Work done for each of the building^\/ing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Number: A9-A1o/NA /1"'{ -,.:1,', li r,4 u: ., "...' t":'i,.:,ii i) 7, chetan lr:F=r JrviahaF colort+ n-iEn€ibad-5.{m.!rJ ph.r OE4O-Aj e rc-a +goc rates939 @ gmerl,com Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificale) 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underoround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterprooflno of the Building/winq. 1l Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions oj envrronmenvcRZ NOC, Finishing to entrance lobbyis, plinth protection, paving ol areas appurtenant to Building/V\4ng, Compound Wall and all other requirements as may be required to complete project as pef specifications in agreement ol Sale. AnV other activities. LayouUBuilding/Wing Number: Al 1 -Al 2/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structurd 0.00 7 Internal walls, Internal plaster, Floorings, Floors and wjndows within 0.00 Flats/Premises 8 Sanitary Fitting within the FlaVPremises 0.00 9 Staircases. lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underqround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofi nq of the Buildinq/winq. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ol environment/CRZ NOC, Finishing to entrance lobby/s, plinih pfotection, paving oj areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement ol Sale. Any other activities. Number: A13-A14/NA Percentage of Actual Work Internal walls, Internal plaster, Floorings, Floors and windows wiihin Flats/Premises Fittino within the FlaVPremises Staircases, lifts Wells and Lobbies at each Floor level Overhead and External plumbing and external plaster, elevation, completion of terraces with waterDroofi no of the Buildino/wino. Installation of Lifts, water pumps, Fire Fighting Fittings and Equipmeni as CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions environmenVCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving areas appunenant to Building,^/Ving, Compound Wall and all oiher requiremer as may be required to complete project as per specifications in agreement uildingMing Number: Al 5-Al 6/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) 1 Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitary Fitting within the FlaVPremises 000 I Staircases, lifts Wells and Lobbies at each Floor level Overheao ano 0.00 Underoround Waier Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterprooflng of the Building/wing. 11 Installation oJ Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical flttings, mechanical equipment, compllance to conditions ol environmenUCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving ol areas appurtenant to Building^,^/ing, Compound Wall and all other requirements as may be required to complete project as per speciflcations in agreement of Sale. Any other activities. LayouUBuild Number: A17-A18/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date oi the Cenificate) (1) (21 (3) 1 Excavation 100.00 2 Basemenis (if anV) 0.00 3 Podiums (if any) 0.00 4 Plinth, 85.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 T Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitary Fitting within the FlaVPremrses 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterprooflng of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ol environmenVCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving ol areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement ol Sale. Any other activities. LayouVB u ild ing/Win g Number: A19-A20/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certifcate) (1) (21 (3) 1 Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 85.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 Internal walls, lnternal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitary Fittinq within the FlaVPremises 0.00 Staircases, Iifts Wells and Lobbies at each Floor level Overhead and 0.00 Underoround Water Tanks r 1r) External plumbing and exiernal plaster, elevaiior].j;qqlelion of terraces with 0.00 waterproofinq of the Buildinq/winq . .,2i XK^IX. <^ ! ! .+ \i,-..., :'l ,. " 3ffi): Sr. No. Tasks/Activity Percentage of Actual Work (As on date of the Certificate) 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fitling!. mbchanical e-quipirent, c-ompliance td conditiond ol environmenUCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving 01 areas appurtenant to Building^/Ving, Compound Wbll and all other reqLiireme.-nts as.ma,y be required to complete project as per speciflcations in agreement ol 5ale. Any otner actrvrtres. LayouUBuildin Number: A1-A2/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Cedificate) (1) (21 (3) Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 linth, 75.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Ftals/Hremrses B Sanitary Fitting within the FlaUPremises 0.00 I Staircases, lifts Wells and Lobbies at each Floor level Overheao ano 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 000 waterprooflng of the Building/wing. 11 Installation of Lifts, water pumps. Fire Fightilg Fittings and Equrpment as per 0.00 CFO NOC. Flectncal fitting!. mbcl.anrcal equrpient. c-omptrance tci condition; ol environment/CRZ NOC, Finishing to entfance lobbyis, pltnth protection,paving ol areas appurtenant to Builorng^/Ving. Compound W;ll and all other reqLiiremdnts as,ma,y be.required io complete project as per specifications in agreemeni of Jare. Any otner actvrles. LayouVB u ild ing/Wing Number: A3-A4/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on daie of the Certificate) (1) (21 (3) 1 Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 75.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 lnternal walls, Internal plaster, Floorings, Floors and windows within 0.00 FtaIS/Hremrses 8 Sanitary Fitting within the FlauPremises 0.00 I Staircases, lifts Wells and Lobbies at each Floor level Overheao and 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterprooflng of the Building/wing 11 Installation of Lifts, waier pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fitting;, mbchanical e-quipirent, c-ompliance tci conditiond 01 environmenVCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving ol areas appurtenant to Building/Wing, Compound Wall and all oiher requirements as.ma,y be.required.to complete project as per specifications in agreement oj 5ale. Anv otner acltvrtres. LayouUBuildin Number: A5-46/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificale) 4 Plinth, 75.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitary Fitting within the FlaUPremises 0.00 9 Staircases, lifts Wells and Lobbies each Floor level Overhead and 0.00 Underground Water Tanks '10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofing of the Building/wing. 11 lfltallatlolr of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical flttings, mechanical equipment, compliance to conditions ol environmenUCRZ NOC, Finishing to entrance lobby/s, plinth protection, paving 01 areas appurtenant to Building^Ning, Compound Wall and all other requirements as may be required to complete project as per speciflcations in agreement ol Sale. Any other activities. Number: A7-A8/NA Sr, No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certilicate) (1) (2) (3) 1 Excavation '100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 75.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 Internal walls, Internal plasier, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitary Fitting wrthin the FlaVPremises 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underqround Waler Tanks '10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofi ng of the Buildinq/wing. 1'l Installat'on of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions oj environmenVCRZ NOC, Finishing to entrance Iobby/s, plinth protection,paving ol areas appurtenant to Building^iving, Compound Wall and all other requirements as may be required to complete project as per specillcations in agreement oi Sale. Any other activities. Table B - Common Areas (lnternal and External Development Works) in respect of Registered Phase / Project Number) Sr.No Common areas and facilities (1) (21 (3) (4) (5) Internal Roads & Footpaths No 0.00 NA 2 Water Supply No 0.00 NA 3 Sewerage (Chamber, Lines, Septic Tank , STP) No 0.00 NA Storm Water Drains No 0.00 NA 5 Landscaping & Tree Plantinq No 0.00 NA 6 Street Lighting No 0.00 NA 7 Community Buildings No 0.00 NA I Treatment And Disposal Of Sewaqe And Sullaoe Water No 0.00 NA 9 Solid Waste l\4anagement And Disposal No 0.00 NA 10 Water conservation /Rain water harvestino No 0.00 NA 11 Energy managemcnt No 0.00 NA 12 Fire protection and tlre safbty requirements No 0.00 NA 13 Electrical meter room, sub-station, receiving station No 0.00 NA 14 Aggregate area of recreational Open Space Yes 0.00 As per Proposed Plan 15 Open Parking No 0.00 NA Yours Faithfully 6dW- AR. SWAPNIL.SHROFF Signature & Name (lN BLOCK LETTERS of L.S/ Architect ( License No: CAJ1996/20610) ffi Date of Certificate: Agreed and accepted by: -=__--< ,..tro,__ -=-. Signature of Promoter Name: Sahakar JV Date: \istrl