?lilZ:- .,-'' aKU, Nishigandh C, Disha Srushti, Rana Nagar, Opp. HotelAtithi, Jalna Road, Chhatrapati Sambhajinagar Telefax: 0240 - 2451616. ASSOCIATES Vasantanand Chambers, 103, First Floor, Above Punjab & Sind Bank, Opp. Sant Eknath, Rang Mandir, New Usmanpura, Chhatrapati Sambhajinagar Telefax'.- 0240-2U8634.. Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Datez 2510412026 To, M/s. MSM INFRA CHHATRAPATI SAMBHAJINAGAR (OLD AURANGABAD) MAHARASHTRA,434OO5 Subject : Certificate of percentage of Work of completion of construction work of Rajgad-Swaraj Nagar Situated at Gut No. 02 (Part), Nanakwadi, chhatrapati Sambhaji nagar at Nanakwadi, Chhatrapati Sambhajinagar (Old Aurangabad), 431008; having MahaRERA Registration Number P51500078515 being developed by M/S. MSM Infra Sir, I / We Ar. MANISH VASANT KALE (PARTNER AKW ASSOCIATES) have undertaken assignment as Architect of certifying Percentage of completion of Construction Work of Rajgad-swaraj Nagar Situated at Gut No. 02 (Part), Nanakwadi, Chhatrapati Sambhajinagar (Old Aurangabad) 431008; having MahaRERA Registration Number P51500078515 being developed by M/S. MSM Infra Based on Site lnspection, with respect to Layout / each of the BuildingMing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingMing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. $frx;;;;iu dp Table A (.lltt ro MARcH 2026) LayouUBuildingMing Number: R.H. A-01 TO R.H. A-11 Sr. No. Tasks/Activity Percentage of Actual Work 'w/il Done (As on date of the Certificate) (1) (2t (3) 1 Excavation 0.0( 2 Basements (if any) 3 Podiums (if anv) 4 Plinth, 0.0( 5 Stilt Floor 6 03 Slabs of Super Structure 0.0( 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 0.0( Flats/Premises I Sanitarv Fittinq within the FlaUPremises 0.0( 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.0( Underqround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.0( waterproofinq of the Building/winq. 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO 0.0( NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenUCRz NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. LayouUBuildingMing Number: R.H. B-01 TO R.H. B-11 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 0.0c 2 Basements (if anv) 3 Podiums (if anv) 4 Plinth, 0.0( 5 Stilt Floor 6 03 Slabs of Super Structure 0.0( 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 0.0( Flats/Premises 8 Sanitary Fitting within the FlaUPremises 0.0( 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.0( Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.0( waterproofi nq of the Buildino/wino. 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO 0.0( NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenUCRz NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. \ gN LayouUBuildingMing Number: R.H. C-01 TO R.H. C-15 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) 1 Excavation '100.0( 2 Basements (if anv) 3 Podiums (if any) 4 Plinth, 100.0( 5 Stilt Floor 6 03 Slabs of Super Structure 25.0C 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 0.0( Flats/Premises 8 Sanitarv Fittino within the FlaVPremises 0.0( I Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.0( Undergrou nd Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.0( waterproofi no of the Buildinq/winq. 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO 0.0( NOC, Electrical fittings, mechanical equipment, compliance to conditions ol environmenUCRz NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. LayouUBuilding/Wing Number: R.H. D-01 TO R.H. D-15 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 100.0( 2 Basements (if anv) 3 Podiums (if anv) 4 Plinth, 100.0( 5 Stilt Floor o 03 Slabs of Super Structure 25.0( 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 0.0( Flats/Premises 8 Sanitary Fittinq within the FlaUPremises 0.0( I Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.0( Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.0( wateroroofi no of the Buildino/winq. 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO 0.0( NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenUCRz NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to BuildingA/Uing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. #A) layouUBuildingMing Number: R.H. E-01 TO R.H. E-16 Sr. No. Tasks/Activity (1) l2l (3) 1 Excavation 0.0( 2 Basements (if any) 3 Podiums (if any) 4 Plinth, 0.0( 5 Stilt Floor 6 03 Slabs of Super Structure 0.0( 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 0.0( Flats/Premises 8 Sanitary Fittinq within the FlaUPremises 0.0( I Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.0( Underqround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.0( waterproofi ng of the Building/wing. 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO 0.0c NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenUCRz NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. LayouUBuilding/Wing Number: R.H. F-01 TO R.H. F-16 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 0.0c 2 Basements (if anv) 3 Podiums (if anv) 4 Plinth, 0.0( 5 Stilt Floor 6 03 Slabs of Super Structure 0.0( 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 0.0( Flats/Premises I Sanitarv Fittino within the FlaUPremises 0.0( I Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.0( Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.0( waterproofi nq of the Buildinq/wing. 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO 0.0( NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenUCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. $6> LayouUBuildingMing Number: R.H. G-01 TO R.H. G-15 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 0.0( 2 Basements (if any) 3 Podiums (if any) 4 Plinth, 0.0( 5 Stilt Floor 6 03 Slabs of Super Structure 0.0( 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 0.0( Flats/Premises I Sanitarv Fittino within the FlaUPremises 0.0( I Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.0( Underqround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.0( waterproofi no of the Buildinq/winq. 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO 0.0( NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenUCRz NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. LayouUBuildingMing Number: R.H. H-01 TO R.H. H-04 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 0.0( 2 Basements (if anv) 3 Podiums (if any) 4 Plinth. 0.0c 5 Stilt Floor 6 03 Slabs of Super Structure 0.0( 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 0.0( Flats/Premises I Sanitary Fitting within the FlaUPremises 0.0( 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.0( Underoround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.0( waterproofi nq of the Buildinq/wino. 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO 0.0( NOC, Electrical fittings, mechanical equipment, compliance to conditions o1 environmenUCRz NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to BuildingA/Uing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. 6!P LayouUBuilding/Wing Number: R.H. l-01 TO R.H. t-23 Sr. No. Percentage of Actual Work Done (As on date of the Certificate) (1) l2l (3) 1 Excavation 0.0( 2 Basements (if any) 3 lodiums (if any) 4 Plinth, 0.0( 5 Stilt Floor 6 03 Slabs of Super Structure 0.0( 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 0.0c Flats/Premises I Sanitary Fitting within the FlaUPremises 0.0( I Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.0( Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.0c waterproofing of the Building/wing. 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO 0.0c NOg, Electrical fltirys, .mechanical equipment, compliance' to conditions ol environmenvcR_z Noc, f!.nishing to entrance lobby/s, plinth protection,paving of areas appurtenant to BuildingAlVing, Compound Wall and all other requirements a-s may be required to complete project as per specifications in agreemeht of sale. Any