Disha Srushti, Rana Nagar' - dh C,OPP. Nishigan AK IJJ ASSOCIATES HotelAtithi, Jalna Road, ChhatraPati Sambhajinagar Telefax: 0240 - 2451616' Vasantanand Chambers, 103' Firgt Floor, Above Punjab & Sind Bank, OPP. Sant Eknath, Rang Mandir, New Usmanpura, Chhatrapati Sambhajinagar Telefax :- 0240-2348634" Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: o$l6l l.tlOS To, M S M INFRA AU RANGABAD, MAHARASHTRA, 431 OO5 Subject : certificate of percentage of work of completion of construction work having "f B!--g-:.L?:g:1, |:99 MahaRERA Registration Number p51500078s15 (onty Applicable after project Registartion) being developed by M S M INFRA Sir, l/we AR MANIsH KALE have undertaken assignment as Archltect /Licensed surveyor of certifying Percentage of completion of construction work of Rajgad- swaraj Nagar having MahaRERA Registration Number P51500078515 (Only Applicable after project Registration, being developed by M S M INFRA ) Based on Slte lnspection,with respect to Layout / each of the Building/wing of the aforesaid Real Estate Proiect I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B' Table A Nu mber Row House A-01 to A'11/NA Sr. No. Tasks/ActivitY Percentage of Actual Work Done (As on date of the Certificate) (1) (2\ (3) 1 Excavation 000 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 000 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 0.00 Flats/Premises B 000 For ES Page 'l of 6 Architect & Approved Valuer Reo. No. CA/93/15610 Reg 'fP Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) 9 Staircases, lifts wells and Lobbies at each Floor levei overhead and 0.00 Underground Water Tanks 10 evation, completion of terraces with 0.00 11 0.00 LayouUBuildi ing Number: Row House B-01 to B-1 1/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) 1 (.21 (3) 1 Excavation 0.00 2 Basements (if any) 0.00 3 Pod!qms (if any) 0.00 4 P nth 0.00 A Stilt Floor 000 6 Slabs of Super Structure 0.00 7 lnterlal walls, lnternal plaster, Floorings, Floors and windows within 000 Flats/Premises Sanitarv FittinQ within the FlaVPremises 0.00 9 9taircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underqround Water Tanks 10 plaster, elevation, completion of terraces with 0.00 s. 11 0.00 LayouUBuildingM/ing Number: Row House C-01 to C-1s/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) 1 (2t (3) I Excavation 100.00 2 Basements (if any) 0.00 J Podiums (if anv) 000 4 Plinth, 100.00 Stilt Floor 0.00 6 SIabs of Super Structure 10.00 7 lntertal walls, lnternal plaster, Floorings, Floors and windows within 000 Flats/Premises o Sanitarv FittinQ within the FlaVPremises 0.00 9 Staircases, lifts wells and Lobbies at each Floor level overhead and 0.00 10 ter, elevation, completion of terraces with 0.00 11 0.00 LayouUBuildi Number: Row House D-01 to D-1s/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) or AI ,TES K?-I al r Vasant Kale i ADOTOVed valuer cA/g3/15610 Page 2 of 6 ,t Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) 1 Excavation 100.00 2 Basements (if any) 0.00 J Podiums (if any) 0.00 4 P nth 100.00 stt F oor 0.00 b Slabs of Super Structure 10.00 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 0.00 Flats/Premises B Sanitarv Fittinq within the FlaVPremises 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underqround Water Tanks '10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofi nq of the Buildinq/winq. 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. LayouUBuildingMing Number: Row House E 01 to E 16/NA Sr. No. Tasks/Activity Percentage of Actual Work Done /As on dale of ihe Certificate\ (21 (3) 1 Excavation 0.00 2 Basements (if anv) 0.00 3 Podiums (if any) 0.00 4 Plinth, 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 000 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 0.00 Flats/Premises o Sanitarv Fittino within the FlaUPremises 0.00 I Staircases, lifts Wells and Lobbies at each Floor level Overhead and 000 Underoround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 wateroroofi no of the Buildinq/winq. 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC" Electrical fittings, mechanical equipment, compliance to conditions of environment/CRz NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Anv other activities. UBuilding/Wing Number: Row House F-01 to F-l6/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 0.00 2 Basements (if anv) 0.00 J Podiums (if anv) 000 4 Plinth, 0.00 Stilt Floor 000 b Slabs of Super Structure 000 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitary Fittinq within the FlaVPremises 0.00 o Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underqround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 wateroroofi no of the Buildinq/winq. For AK Page 3 of 6 Architect & Approved Valuer s> Req. No., cA/93/15610 Sr. No. Tasks/Activity Percentage of Actual Work Done /As nn date nf tha f'arlifinafo\ 11 lnstallation of Lifts, wa er 0.00 CFO NOC, Electrical fit of environment/CRz NOC of areas appurtenant to B ts 1s,may be required.to of LayouUBu Number: Row House G-01 to G-1 5/NA Sr. No. Tasks/Activity Percentage of Actual Work Done lAs on date of the Certificate) 1 QI (3) 1 xcavation 0.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 0.00 Flats/Premises B Sanitary Fitting within the FlaUPremises 0.00 I Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks '10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproqfing of the Building/wing. 11 0.00 LayouUBuildingM/ing Number: Row House H-01 to H-04/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 0.00 2 Basements (if anv) 0.00 3 Podiums (if any) 0.00 4 P nth 0.00 A Stilt Floor 0.00 6 Slabs of Super Structure 000 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 0.00 Flats/Premises B Sanitary Fitting within the FlaUPremises 0.00 o Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 000 waterproofi ng of the Building/winq. 11 0.00 LayouUBuildin ng Number: Row House I-01 to 1-23lNA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) t2) (3) 1 Excavation 0.00 2 Baqements (if any) 000 J Podiums (if any) "{f{ld-- 0.00 TES Page 4 of 6 V K> Architect & APProved Valuer Reg. No. CA/93/15610 HjiJE?l#,:l!., rnternar praster,'oo,ffi il?[i#iii, ff:',"ycl?"""d Lobbies "tffi at.pt aster, etevation, .o, p.tion or t"rr** *itn' |lifl "rlj,,:n:rn LayouUBu Number: Commercial Building/NA , rnternar ptaster, noo,inffi [jiJ,B?l#,"r]f ;lt'ji;rirr ll,l:.yf.'l?"., d Lobbies,t ffi bing and external olaster, elevation, .orJt"tion of t"rr""". *itn of the Buildino/winri For AK nt Kale Arch itect & Appr oved Valuer Reg. No. CA/93/15610 Page 5 of 6 (tnt"'n'l and External Development works) in respect or Resistered E:iX? ir"d[f,i|#3if Sr.No Common areas and facilities ls Available Percentage ofActual Details (Yes / No) Work Done (As on date of the Certificatet (1) (3) L4) (s) 1 lnternal Roads & Footpaths Yes 15.00 As per drawinos bv ConsultanG 2 Water Supply Yes 000 As per drawinos bv Consrrltanls 3 DepUc tanK,STp) Yes 15.00 As per drawinos bv Consultanis 4 Storm Water llr:inq No 0.00 NA ( Landscaping & Tree planting Yes 0.00 As per drawinos by Consultanls 6 Street Lighting Yes 0.00 As per drawinos bv Consrrltanis 7 No 0.00 NA B No 0.00 NA I No 0.00 NA 10 Water conservation /Rain water harvesting Yes 0.00 As per drawinos bv ConsLrltaniq 11 No 000 NA G-^ ^^r^-l- a^r Irv . ----- . 12 pivLevli^^ ,." nrnloa .Firo \rvrr olu 5dtetv requlrgments - No 0.00 NA '13 trlar+rir-l m^+^. -^^- r, recetvtng station Yes 0.00 As per drawinos bv Consultanls 14 upen Space Yes 0.00 As per drawinos bv Consrrltanis 15 lrvver r r qt nil tu No 0.00 NA For A - Yours Faithfully Architect & Approved Valuer Reg. No. CA/93/15610 AR MANtsH KALE Signature & Namq (tN BLOCK LETTERS) of L.S/ Architect ( License No: CA/93/15610) - Date of Certificate: 06/01/2026 Agreed and accepted by: Signature of promoter Name:MSMlnfra Date: 06/01/2026 Page 6 of 6