AK[I' ASSOCIATES Nishigandh C, Disha Srushti, Rana Nagar, Opp. HotelAtithi, Jatna Road, Chhatrapati Sambhajinagar Tetefax: 0240 _ 2451 616. Vasantanand Chambers, 103, First Floor, Above punjab & Sind Bank, Opp. Sant Eknath, Rang Mandir, New Usmanpura, Chhatrapati Sambhajinagar Telefax :- 0240-2U8634. Annexure A FORM,I [see Regulation 3] ARCHITEGT'S CERTIF!CATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 30/06/2025 To, M S M INFRA AU RANGABAD, MAHARASHTRA, 431 OO5 Subject : Certificate of percentage of Work of completion of construction work of Rajgad- swaraj Nagar having MahaRERA Registration Number P51500078515 (Only Applicable after project Registartion) being devetoped by I/t S M INFRA Sir, l/we AR MANISH KALE have undertaken assignment as Architect /Licensed Surveyor of certifying percentags of completion of Construction Work of Rajgad- Swaraj Nagar having MahaRERA Registration Number pS150OO7g515 (only Applicable after project Registration, being devetoped by M s M INFRA ) Based on Site lnspection,with respect to Layout / each of the Building/wing of the aforesaid Real Estate project I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingruing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A /Wing Number: Row House A-01 to A-i1/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) {1) (21 (3) Excavation 0.00 2 Basements (if anv) ooo J Podiums (if anv) 0.00 4 Pllnth, 000 5 Stilt Floor 0.00 b Slabs of SJ.rper Structure 7 Interlal walls, rnternal praster, Floorings, Floors and windows withii' Flats/Premises 0.00 8 Sanitarv Fitting within the FlaVpremises 0.00 Page 'l of 6 Sr. No. Tasks/ActivitY Percentage of Actual Work Done _ (As on date of tlte !le{!nPa'!eL I Staircases, lifts wells and Lobbies at each Floor level overhead and 0.00 Underoround Water Tanks External plumbing and external plaster, elevation, completion of terraces with 0.00 10 wateroroofinq of the Building/wing. 1',! lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment.as per 0.00 CiO tiOC, Eieiiric'at frtiing'i, mlchanical e-qurpirent, compliance to.conditions of ;;rid;;;hr[R/ NoC; rTniining to entranie'lobbvis, plinth protection,paving of iieiJ ippurtenant to Bililding/Wing, Compound Wall and all other requirements ;ffi;t"ff*quii6o to comdtete pioject bs per specifications in agreement of Sale. Anv other activities Number: Row House B-01 to B-1l/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificatel (3) (1) l2l 1 xcavation 2 Basements (if anv) 0.00 c Podiums (if anv) 0.00 Plinth, 0.00 4 5 Stilt Floor 6 Slabs of Super Structure 0.00 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 0.00 Flats/Premises I Sanitarv Fittinq within the FlaVPremises 0.00 I staircases, lifts wells and Lobbies at each Floor level overhead and 0.c0 underoround Water Tanks 10 External plumbing and external olaster, elevation, completion of terraces with 0.00 ruatornrnafino of the Buildino/wino. 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 bFO l,lOC, Eieitricbt fitting!, michanical e-quipirent, compliance to.conditions of ;;fi;;;;htCn2 Noc; rTnilning to entranbe'lobbv/s, plinth protection,pavins of areas appurtenant to Building/Wing, Compound Wall and all other requarements ;;;;v"6e *quiiei to comp"lete fioject bs per specifications in agreement of Sale. Anv othei activities LavouUBuild Number: R ow House C-01 to C-15/NA Sr. No. Tasks/Activity Percentage of Agtual Work Done (As on date of the Certificate) (3) 1 tu Excavation 100.00 1 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 0.00 E Stilt Floor 0.00 b Slabs of Super Structure 0.00 7 lnternal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises Sanitarv Fittinq within the Fl4uPfeldgeq 0.00 8 0.00 o staircases, lifts wells and Lobbies at each Floor level overhead and Ilnderoround Water Tanks External plumbing and external plaster, elevation, completion of terraces with 0.00 10 waterorodfinq of the Building/wing, 11 lnstailation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Eteitricbt fitting's, m6chanical e-quipment, compliance to.conditions of ;;r,r;;ilhr[n2 nbC, FTnishing to entranie'lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requlrements ;;;;r"# required to comp-lete p'roject'as per specifications in agreement ol Sale. Anv other activities. LayouUB Number: Row H ouse D-0{ to D-ls/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) Page 2 of 6 Sr. No. Tasks/Activity Percentage of Actual Work Done lAc nn .lato +h6 ^f ^a,lifi^^+,.\ 1 Excavation 100.00 ? BFsements (if anv) 0.00 3 PodiuFs (if inv) oon 7 Plidh, 0.00 -g Stilt Floor 0.00 -q Slabs of Suoer Structure 0.00 7 Interlal walls, lnternar plaster, Floorings, Floors and windows within Flats/Premises 0.00 I the 9 s.taircases, lifts wells and Lobbies at each Floor level overhead anJ Underqround Water Tanks 0.00 10 External plumbing and.external plaster, elevation, completion of terraces with 0.c0 waterproofinq of the Buildino/wino' 11 tl9$tla-!io_n of Lifts, water pumps., Fire Fighting Fittings and Equipment as cFo Noc, Erectrica r fittingb., mechan ica r e-q uipfi eni, c6mpr iind tii".'riitiii, pl 0.00 environmenUC RZ NOC, Finishing to entranie' lobbvir Jit areas appurtenant to eiriroins/wing, compound *r,?'J,][x],T,?t3ii3lr?3i1i"9.?J gs.ma-y be required to comp-rete ploject bs per speciticitions' i. dgl#,;;i,]'ir Sale. Anv othei activities. lgrrYl!l Number: Row House E 0i to E 16/NA Sr. No. Tasks/Activity Percentage of Actual Work Done /Ac nn rla{a th^ ^f ^^*iJi^^.^\ (1) (21 1 Excavation 00 2 Basements (if anv) 0. 3 Podiums (if anv) 4 Plinth, 5 Stilt Floor ooo 6 Slabs of Super Structure 0.00 7 Interlal walls, lnternal plaster, Floorings, Floors and windows withii Flats/Preqises 0.00 8 Sanitarv Fitting within the FlaVPremises 0.00 I s.taircases, lifts weils and Lobbies at each Froor rever overhead anJ Underqround Water Tanks 0.00 10 External plumbing and.external plaster, elevation, completion of terraces with 0.00 waterproofing of the Building/wind. 11 [t!LarJ?!io-n of Lifts, water pumps., Fire Fighting Fittings and Equipment as per 0.00 cFo Noc, Erectricarfittingb., mechanicar eluipireni, c6mpiia"ciiiioi'dit[-.Jlr environmenUC RZ NOC, Finishing to entranie' Iob-by7r a reas a pp u rte n ant to e ir ir o n i s/wi ns, c om po u no wr,i J,l[xl, T,"nt3ilj3lr?rxYli"n iJ qs.ma-y be required to comp-tete f'roject bs per specificitior; Sale. Anv othei activities. i;';il#;;;i'ot rouUBuildingMing Number: Row House F-01 to F_i6/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on clata of thc Corfifinr+s\ r]) _ (2) (3) 1 Excavation 0.00 2 Basements (if anv) 0.00 3 Podiums (if anv) 0.00 4 Plinth, 0.00 _q Stilt Floor c.00 b Slabs of Super Structure 7 lnterlal walls, lnternar praster, Froorings, Froors and windows within Flats/Premises 0.00 8 Sanitarv Fitting within thg FlaUpremises 0.00 9 staircases, lifts wells and Lobbies at each Floor level overhead an; Underqround Water Tanks 0.00 10 External plumbing ald external plaster, elevation, completion of terraces waterproofinq of the Building/wind. witi 0.00 Page 3 of 6 Sr. No. Tasks/ActivitY Percentage of Actual Work Done (As on date of the Certificate) 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment.as per 0.00 CFO inqr6; Eieiirii'aLfrtting's, mechanical e-quipirent, compliance to.conditions of environmehV[n2 NOC, finisning to entranie'lobby/s, plinth protection,paving of areas appurtenant to Buildingiwing, compound wall and all other requireme.nts ;;.;t lt,t required to comp-lete p'roject bs per specifications in agreement of Sale. Any other activities. Number: Row House G-01 to G-15/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 0.00 2 Basements (if anv) 0.00 3 Podiums (if any) 0.00 4 Plinth, 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitarv Fittino within the FlaUPremises 0.00 I Staircases, lifts wells and Lobbies at each Floor level overhead and 0.00 Underqround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterorodfinq of the Building/wing. 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0'q0 CFO ltOC; Eieitricbt fitting's, m6chanical e!uipirent, compliance to.conditions of environmehVfRZ NOC, finisning to entranie lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements ;;;;t ttd required to comp-lete ploject'as per specifications in agreement of Sale. Anv other activities LayouUBuilding/Wing Number: Row House H-01 to H-04/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 0.00 2 Basements (if any) 0.00 3 Podiums (if anv) 0.00 4 Plinth, 0.00 4 Stilt Floor 0.00 b Slabs of Suoer Structure 0.00 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 0.00 Flals/Premises 8 Sanitarv Fittino within the FlaUPremises 0.00 I staircases, lifts wells and Lobbies at each Floor level overhead and 000 underoround Water Tanks 10 External plumblng and external plaster, elevation, completion of terraces with 0.00 waleroroofino of the Buildinq/winq. 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment.as per 0.00 CFO f.iOC, Electrical fitting's, machanical e-quipment, compliance to conditions of environmehVCRz NOC, Finishing to entranie'lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements iJma,'Ue required to comp-lete froject'as per specifications in agreement ol Sale. Any other activities. Number: Row Ho use l-01 to l-23/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (3) {21 1 Excavation 0.00 2 Basements (if anv) 0.00 3 Podiums (if any) 0.00 Page 4 of 6 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) 4 Plinth, 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 lnterlal walls, lnternal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitarv Fitting within the FlaUPremises 0.00 I 9taircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underqround Water IAnks 10 External plumbing and..external plaster, elevation, completion of terraces with 0.00 waterproofing of the Buildinq/wind. 11 t19!_atJg!o_n of Lifts, w.ater pumps., Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, E!-el[ig?LfLttilgs., mdchanicate-quipftent, c6mplancrjidcondifionitr environmenucRz Noc, Finishing to entrande'lobby/s, plinth protection,pavinq of areas appurtenant to BuildingM/ing, compound Wall dnd all'other reqtiireme-nts as may be required to comfllete p-roject bs per specifications ln agri]emen1 ot Sale. Anv othei activities. Number: Commercial Building/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificatet fl) (21 (3) 1 Excavation 0.00 2 Basgments (if anV) 0.00 3 Podiums (if anv) 0.00 I Plinth, 0.00 5 Stilt Floor 0.00 o Slabs of Super Structure 0.00 7 lntertal walls, lnternal plaster, Floorings, Floors and windows withii- 0.00 Flats/Premises 8 Sanitarv Fittinq Within the FlaVPremises 0.00 I 9.taircases, lifts wells and Lobbies at each Floor level overhead and 0.00 Underground Water Tanks 10 External p-lumbing and.external plaster, elevation, completion of terraces with waterproofinq of the Buildinq/Wing. 0.00 11 fglatJqlio_n of Lifts, water pumps., Fire Fighting Fittings and Equipment as per 0.00 cFo Noc, lt^e9t1ga-!-t1tti19b, m6chanicare-quipirent, c6mptiancdiiionoitio-njbr environmenticRz Noc, Finishing to entranie lobby/s, plinth protection,pavinq of areas appurtenant to Buildingruing, compound Wall a'nd all'other reqr.iireme-nts qs.ma-y be required to comp-lete froject bs per specifications in agaeimenior Sale. Anv other activities. Page 5 of 6 Table B - Common A1ea.s (lnternal and Externa! Development Works) in respect of Registered Phase / Project Number) Sr.No Common areas and facilities Proposed Percentage of Actual Details (Yes / No) Work Done (As on date of the Certificate) (1) (2t (3) l4l (s) 1 nternal Roads & Footpaths Yes 5.00 As per drawings by Consultants 2 /Vater Supply Yes 0.00 As per drawings bv Consultants 3 Sewerage (Chamber, Lines, Septic Tank , STP) Yes 5.00 As per drawings bv Consultants 4 Storm Water Drains No 0.00 NA 5 Landscaping & Tree Planting Yes 0.00 As per drawings bv Consrrllants b Street Lighting Yes 0.00 As per drawings by Consultants 7 Community Buildinqs No 0.00 NA B freatment And Disposal Of Sewaqe And Sullaoe Water No 0.00 NA I Solld Waste Management And Disposal No 0.00 NA 10 n/ater conservation /Rain water harvesting Yes 0.00 As per drawings bv Consrrltanti 11 fnerqv manaoemcnt No 0.00 NA 12 Flre orotection and fire safetv reouirements No 0.00 NA 13 Electrical meter room, sub-station, receiving station Yes 0.00 As per drawings bv Consrrltants 14 Aggregate area of recreational Open Space Yes 0.00 As per drawings hv Cancr rltants 15 Qpen Parking No 0.00 NA Yours Faithfully For AK rES Manl6fi-Vasant Kale Architect & Approved Valuer Rog. No. CA/93/15610 AR MANISH KALE Signature & Name (lN BLOCK LETTERS) of L.S/ Architect ( License No: CA/93/15610) Date of Certificate: Agreed q,pd accepted by: 7 -r#6\$tK promof Signature of Name:MSMlnfra Date: 30/06/2025 Page 6 of 6