01- ioa ",o .lJ c_ $- Jtr -c\ a r a h I t e ct 5 c$ vrb en planner3 IB '"o rnteTloa.jeStaners approved valoere Annexure B FORM 2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project Wise) Date: To, Unity Developers Aurangabad, MAHARASHTRA,431001 Subject: Certificate of Cost lncurred for Development of PMAY U Tisgaon 227 A having MahaRERA Registration Number P51500079949 (Only Applicable after project Registartion) being developed by Unity Developers Sir, l/We Surve Samarth Chandrakant have of Certifying Estimated Cost for PMAY U Tisgaon 227 A having MahaRERA Registration Number P51500079949 (Only Applicable after project Registration, being developed by Unity Developers ) 2.We have Estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per speciflcations mentioned in agreements of sale. Our estimated cost calculations are bassd on the drawings/plans made available to us for the project under reference by the Developer / Consulatants. The Schedule of items and quantity required for the entire work as calculated by Quantity Surveyor* appointed by Developer/Engineer, the assumption ofthe cost of material,labour and other inputs made by developer,and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We estimate Total estimated the Cost of completion of thc aforesaid project under reference at Rs. 740386569.00 (Total of Table A and B) at the time of Registration. The estimated Total Cost ofproject is with reference to thc Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal & external works,as per specifications mentioned in agreements of sale and for the purpose of the obtaining occupation certificate / completion certificate for the Building(s) /Wing(s)/ Layout /Plotted Developmeht from the Chhatrapati Sambhajinagar Municipal Corporation being the Planning Authority under whose jurisidiction the aforesaid project is being implemented. 4.The Estimated Cost incured till date is calculated at Rs. 5188841.00 (Total of Table A and B).The amount of Estimated Cost incurred is calculated on the basis of inout materials/services used and unit cost ofthese items. 5. The proportionate Compljtion of internal & external works, as per specification menlioned in agreement of sale, of the Project is estimated at Rs 735197728.00 (Total of Tab'e A and B) 6. I certify that the Cost of the Civil, l\ilEP and allied works the for the apartments and proportionate ate internal & external works,as per specification mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: Table-A Wing /Layout Plotted Development bearing Number :A1A2lNA Sr. No. Particu lars Amount (ln Rs.) 1 Total Estimated Cost of the Building/Wing/Layout 98835072.00 Plotted Development as on date of Reqisiratibn is 2 741263.40 Cost incurred as on date of certificate 3 Work done in Percentaqe (as Percentaqe of the estimated cost) .75 4 Bqlqlrce Cost to be lncurred"(Based on Estimated Cost) 9B093809.00 5 Cost Incurred on the Add itiona l/Extra items not inclu d ed in the 0 Estimated Cost (Table-C) Building/ Wing Plotted Development Number:A3A4/NA Sr. No. Particulars Total Estimated Cost of the Building/Wingi Layout 98835072.00 Plotted Development as on date of Reqislratibn is 2 7 41263,00 Cost incurred as on daie of certificale 3 Work done in Percentage (as Percentaoe of the estimated cost) .75 4 Balance Cost to be lncurred.*(Based on Estjmated Cost) 98093809.00 5 Cost lncurred on the Additional/Extra items not included tn ine 0 Estimated Cost (Table-C) Building/ Wing /Layoui Plotted Development bearing Number :AbA6/NA Sr. No. Partic ulars Amount {ln Rs.} 1 Total Estimated Cost of the Buildlngiwing/Layout 98835072.00 Plotted Qevelopment as on date of Reqislratibn is 2 7 41263,00 Cost incurred as on date of certificate 3 [ork done in Percentaqe (as Percentaoe of the estimated cost) .75 4 Balance Cost to be Incurred**(Based on Estimated Cost) 98093809.00 5 Cost lncurred on the Add itiona l/Extra items not inclu d ed in the 0 Estlmated Cosi (Table-C) Building/ Wing /Layout Plotted bearing Number :A7A8/NA 1 Total Estimated Cost of the Building/r'Ving/Layout 98835072.00 Plqlled Development as on date of Reqislratidn is 2 7 41263.00 Cost incurred as on date of certificate 3 Work done in Percentaqe (as Percentaqe of the estimated cost) .75 4 Balance Cost to be Incurred**(Based on Estimated Cost) 98093809.00 5 Cost Incurred on the Additional/Extra items not included in rne 0 Estimated Cost (Table-C) tsuilding/ Wing /Layout Ploited Development bearing Number :A9A1O/NA Particulars Total Estimated Cost of the Building,^/Ving/Layout 98835072.00 Plotted Development as on date of Reqislratibn is 2 7 41263.00 Cost incurred as on date of certificate 3 Work done in Percentaqe (as Percentaqe ofihe estimated cost) .75 Eqlqnce Cost to be Incurred"*(Based on Estimated Cost) 98 093809.00 Sr'.:lto.' 5 Cost Incurred on the Add ition allExtra items no'i included in the 0 Estimated Cost (Table-C) /LaVout Plotted Develooment bea Number :A11A'12lNA sr,l,No. Particulars 1 Total Estimated Cost of the Building^iving/Layout 98835072.00 Plotted Development as on date of Reoistration is 2 7 41263.00 Cost incurred as on date of certificate 3 Work done in Percentaoe (as Percentaqe of the estimated cost) .75 4 Balance Cost to be Incurred'*(Based on Estimated Cost) 98093809.00 5 Cost lncurred on the Add itional/Extra items not included in the 0 Estimated Cost fiable-C) Building/ Wing /Layout Plotted Development bearing Number :A13A14/NA Sr. No, 1 Total Estimated Cost of the Building^/Vingi Layout 98835072.00 Plotted Development as on date of Reqistration is 2 741263.00 Cost incurred as on date of certificate 3 Work done in Percentaoe (as Percentaoe of the estimated cosi) .75 4 Balance Cost to be Incurred"*(Based on Estimated Cost) 98093809.00 5 Cost lncurred on the Add itiona l/Extra items not included in the 0 Estimated Cost (Table-C) Table B Internal and External Development Works in respect of the Registered Phase 1 Total Estimated Cost of the BuildingA/Ving/Layout 48541065.00 Plotted Development as on date of Reqistration is 2 Cost incurred as on date of certificate 0 3 Work done in Percentaoe (as Dercentaoe of the estimated cost) 0 4 Balance Cost to be Incurred**(Based on Estimated Cost) 48541065.00 Cosi Incurred on the Add itional/Extra items not included in the Estimated Cost (Tablc -C) oc Yours Faithfully b L )v SURVE SAMARTH CHANDMKANT ffi v p A1 Signature & Name (lN BLOCK LETTERS) with Stamp of Engineer [Not Less than bachelor's DegreaHolder or equivalent as per Scction 2(u) of thc Act] Local Authority llcense no. (if applicable) Date of Certificate: Agreed and Accepted by: 1-Y"; Promoter --6::of Name: Unity Developers Date: 1.The scope of work is to complete Registered Real Estate Pro.iect as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2.(.) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor,whose certificaie of In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (.) and in case quantity are being calculated by office of Engineer,the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (.). 3.(.") Balance Cost to be incuned (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 4.All components of work with specifications are indicative and not exhaustive s.Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specifications in agreement of sale. TABLE C List of Extra/Additional/Deleted ltems considered in Cost. (which were not part of the original Estimate of Total Cost)