0t: ioa ;L -|- o; q_ s- _Vtr -n E,t arcnttecXS u.t>an Plafinefs x] _i(f) tnter tof aeStqnera aP?rovea vat.ll er5 Annexure B FORM 2 lsee Regulaiion 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project Wise) Date: To, Unity Developers Aurangabad, MAHARASHTRA,43l 001 Subject: Certiflcate of Cost Incurred for Development of PMAY U Tisgaon 227 A having MahaRERA Registration Number P51500079949 (Only Applicable after project Registartion) being developed by Unity Developers Sir, l^r'Ve Surve Samarth Chandrakant have of Certifying Estimated Cost for PMAY U Tisgaon 227 A having MahaRERA Regisiration Number P51500079949 (Only Applicable after project Registration, being developed by Unity Developers ) 2. We have Estimated the cosi of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & external works ofthe prolect as per specifications mentioned in agreements of sale. Our estimated cost calculations are bassd on the drawings/plans made available to us for the project under reference by the Developer / Consulatants. The Schedule of items and quantity required for the entire work as calculated by Quantity Surveyor* appointed by Developer/Engineer, ihe assumption ofthe cost of material,labour and other inputs made by developer,and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We estimate Total estimated the Cost of completion of thc aforesaid project under reference at Rs. 740386569.00 (Total of Table A and B) at the time of Registration. The estimated Total Cost ofproject is with reference to thc Civil' MEp and Allied works required for completion of the apartments and proportionate completion of internal & external works,as per specifications mentioned in agreements of sale. and for the purpose of the obtaining occupation certificate / completion certificate for the Building(s) /Vving(s)/ Layout /Plotted Development from the Chhatrapati Sambhaiinagar Municipal Corporation being the Planning Authority under whose jurisidiction the aforesaid project is being implemenied. incured till date is calculated at Rs. 5188841.00 (Total of Table A and B).The amount of is calculated on the basis of input used and unit cost of these items. n of the Civil, MEP of the aDartments and |, cfiEtin rFef fi ' turfl, Liran€ibad-5,{m.s,} ph.t df4O'E_32 ssocretcsg99 @ gmarl.com proportionate Complition of internal & external works, as per specification mentioned in agreement of sale, of the Project is estimated at Rs 735197728.00 (Total of Table A and B) 6. I certify that the Cost of the Civil, MEP and allied works the for the apartments and proportionate ate internal & external works,as per specification mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: Table-A Building/ VMng /Layout Plotted Development bearing Number :A1A2|NA Sr. No. Particulars Amount {ln Rs.) 1 Total Estimated Cost of the Building/Wlng/Layout 98835072.00 Plotted Development as on date of Registration is 2 Cost incurred as on date of certiflcate 741263.00 3 Work done in Percentage (as Percentage of the estimated cosi) .75 Balance Cost to be Incurred**(Based on Estimated Cost) 98093809.00 5 Cost Incurred on the Additional/Extra items not included in ihe 0 Estimated Cost (Table-C) Building/ Wn g /Layout Plotted bearing Number :4344/NA Sr. No. Particulars Amount (ln Rs.) 1 Total Esiimated Cost of the Build ing/Wing/Layout 98835072.00 Plotted Development as on date of Registration is 2 Cost incurred as on date of certiflcate 7 41263.00 3 Work done in Percentage (as Percentage of the estimated cost) .75 Balance Cost to be Incurred""(Based on Estimated Cost) 98093809.00 5 Cost lncurred on the Additional/Extra items not included in the 0 Estimated Cost (Table-C) Bu ild Wrng /Layout Plotted Development Number:A546/NA Sr. No. 1 Total Estimated Cost of the Building/Wing/Layout 98835072.00 Plotted Development as on date of Registration is 2 Cost incurred as on date of certiflcate 741263.00 3 Work done in Percentage (as Percentage of the estimated cost) .75 Balance Cost to be Incurred*"(Based on Estimated Cost) 98093809.00 5 Cost lncurred on the Additional/Extra items not included in rne 0 Estimated Cost (Table-C) Building/ Wng /Layout Plotted Development bearing Number :A7A8/NA Sr. No. Particulars Amount (ln Rs.) 1 Total Estimated Cost of the Building/Wing/Layout 98835072.00 Plotted Development as on date of Reoistration is 2 Cost incurred as. on date of certiflcate 741263.00 3 Work done in Percentage (as Percentage of the estimated cost) .75 4 Balance Cost to be Incurred -*(Based on Estimated Cost) 98093809.00 5 Cost Incurred on the Additional/Extra items not included in the Estimated Cost (Table-C) Building/ Wng /Layout Plotted Development bearing Number :A9A1o/NA Sr. No, Particulars Amount (ln Rs.) 1 Total Estimated Cost of the Building/Wing/Layout 98835072.00 Plotted Development as on date of Registration is 'a9Ki+l Eost incurred as on date of certiflcate 741263.00 :i" I ar--} ork done in Percentage (as Percentage of the estimated cost)224. g=afo- .75 ri l. 4.=/ lance Cost to be Incurred**(Based on Estimated Cost) //lE t<\ eaoe3soe.oo L\i\:t] s.ejl; :", i Ft#)t 5 Cost Incurred on the Additional/Extra items not included in the 0 Estimated Cost (Table-C) Bui Plotted Development bearing Number :A11A12lNA Amourit (ln Rs.) 1 Total Estimated Cost of the BuildingA/Ving/Layout 98835072.00 Plotted Development as on date of Reoistration is 2 Cosi incurred as on date of certificate 741263.00 3 Work done in Percentage (as Percentage of the estimated cost) .75 /l Balance Cost to be Incurred**(Based on Estimated Cost) 98093809.00 5 Cost Incurred on the Additional/Extra items not included in the 0 Estimated Cost (Table-C) Building/ Wng /Layout Plotted Development bearing Number :A13414/NA si. No. Particulars 1 Total Estimated Cost of the Building/Wing/Layout 98835072.00 Plotted Develooment as on date of Reoistration is 2 Cost incurred as on date of certificate 741263.00 3 Work done in Percentage (as Percentage of the estimated cost) .75 4 Balance Cost to be Incurred**(Based on Estimated Cost) 98093809.00 5 Cost Incurred on the Additional/Extra items not included in the 0 Estimated Cost ffable-C) s b, Table B Internal and External Development Works in respect of the Registered Phase Sr. No, Particulars {1) Total Estimated Cost of the Building/Wng/Layout 48541065.00 Plotted Develooment as on date of Reoistration is Cost incurred as on date of certificate 0 3 Work done in Percentage (as percentage of the estimated cost) 0 Balance Cost to be Incurred*"(Based on Estimated CosD 48541065.00 5 Cost lncurred on the Additional/Extra items not included in the Estimated Cost (Tablc -C) Yours Faithfully {.ii\l: c-i ,'..--.\'ul E'1. ,.. , *l q SURVE SAMARTH CHANDRAKANT \*u'{3-lp1 JuFn"35 Signature & Name (lN BLOCK LETTERS) with [Not Less than bachelor's Degree Holder or equivalent as per Scction 2(u) of thc Actl Local Authority license no. (if applicable) Date of Certiflcate: Agreed and Accepted by: Signature of Promoter Name: Unity Developers Date: 1.The scope of work is to complete Registered Real Estate Pro.ject as per drawings approved from time to time and as per speclfications mentioned in agreement of sale. 2.(.) Quantity survey can be done by oftice of Engineer or can be done by an independent Quaniity Surveyor,whose certiflcate of In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (.) and in case quantity are being calculated by office of Engineer,the name of the person in the ofnce of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (.). 3.(**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quaniity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 4.All comoonents of work wrth soeciflcations are indicative and not exhaustive 5.Please specify if there are any deviations / qualiflcations. Example: Any deviations in input material used from specifications in agreement of sale. - TABLEC List of Extra/AdditionaUDeleted ltems considered in Cost. (which were not part of the original Estimate of Total Cost) g"@r* (a-i6-""t