ioa ',o ;-f .l-r c_ ($- _Vtr _ ar.h teclo r$ srban x] ?lanner5 tnleftor ae5t4nef5 a??fovea val0 er9 Annexure A FORM 1 lsee Regulation 3l ARCHITECT'S CERTIFICATE (To be submitted at the time of Registratlon of Ongoing Project and for withdrawal of Money from A^^. nFai^naia.1 ,.--JUnI) Date: To, UNITY DEVELOPERS AURANGABAD, MAHARASHTRA, 431001 Subject : Certificate of percentage of Work of completion of construction work of PMAY U Tisgaon 227 A having MahaRERA Registration Number P51500079949 (Only Applicable after project Registartion) being developed by UNITY DEVELOPERS Sir. lA/Ve AR. SWAPNiL SHROFF have undertaken assignment as Architect /Licensed Surveyor of certifying Perceniage of completion of Construction Work of PMAY U Tisgaon 227 A having MahaRERA Registration Number P51500079949 (Only Applicable after project Registration, being developed by UNITY DEVELOPERS ) Based on Site Inspection,with respect to Layout / each of the Building,A/Ving of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A LayouUBuilding/Wing Number: A1A2INA 7, d,hn arper nu*ctr cdarry, arrun6abad-5,{m.cJ ptr.t O9*O-?!EA ssocratee999 @gmarl,com Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) I Staircases, lifts Wells and Lobbies at each Floor level Overheaq and 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 watefprootlng of the Buildrng/wing. 11 !!!allallo! of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 000 CFO NOC, Electncal flttings, mechanical equipment, c-ompliance to conditiond oj environmenVCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving ol areas appuftenant to Buildingnr'/ing, Compound Walt dnd all oiher reqriiremeints as may be required to complete project as per specifications in agrbement ol Sale. Any other activittes. Layo uUBuildin Number: A3A4/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure' 000 7 lnternal walls, Iniernal plaster, Floorings, Floors and windows within 0.00 Flats/Premises B Sanitary Fitting within the FlatiPremises 0.00 I Staircases, lifts Wells and Lobbies at each Floor level Overheaq ano 0.00 Underground Water Tanks '10 External plumbing and external plaster, elevation, completion of terraces wtrn 0.00 waterprooflng of the Building/wing. 11 Instalration of Lifts. water pumps Frre Fighting Fittrngs and Equipment as pel 0.00 CFO NOC. tlectrical fltlings, mbchanical equrphent. c-omptiance to condit,ond ol environmenVCRZ NOC, Finishing to entrance lobby/s, pljnth protechon, paving ol areas appurtenant to BuildingM/ing, Compound Wall and all other .equrreme-nts as,ma,y be required to complele project as per specificattons In agreement ol Jate. Anv otner acttvttres. ouUBu lding/Wing Number: A5A6/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Cerliflcate) (1) (21 (3) l Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinlh, 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 0.00 Flals/Premrses 8 Sanitary Fitting within the FlaVPremises 0.00 9 Staircases, lifts Wells and Lobbies each Floor level Overhead and 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofi ng of the Building^rr'ing. 1'l Installation of Lifts. water pumps. Fire Fighling Fiftngs and Equrpment as pel 0.00 CFO NOC. Electrical frttings. mbchanical equipinent, c-omptiance tci conditiond ot environmenVCRZ NOC, Finishing to entfance lobby/s, plinth protection,paving ol areas appurtenant to BuildingruVing, Compound Wall and all other reqLiiremeints as,ma"y be required to complete projecl as per speciflcations In agreement ol )ale. Anv olner acllvtlres ffi uUBuilding/Wing Number: A7A8/NA I d5^srAuuvrry Percentage of Actual Work __l , L Done ." 't 1 il (As on date of the Certiflcate) (1) "..I (21 .%'\1 (3) N{U' Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) 1 Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structufe 0.00 7 lnternal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitary Fitting within the FlavPremises 0.00 I Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underoround Water Tanks '10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofi nq of the Buildinq/winq. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ol environmenUCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving ol areas appurtenant to Building,Alving, Compound Wall and all other requirements as may be required to complete project as per speciflcations in agreement ol Sale. Any other activit;es. Layo uVBu ild in g/wing Number: A9A10/NA Sr, No, TaskslActivity Percentage of Actual Work Done fAs on date of the Certificate) (1) (2) (3) Excavation '100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 Internal walls, lnterna I plaster, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitary Frttinq within the FlavPremises 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underoround Water Tanks '10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofi ng of the Building/wing. 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical flttings, mechanical equipment, compliance to conditions ol environmenVCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Buildingnr'r'ing, Compound Wall and all other requirements as may be required to complete project as per speciflcations in agreement of Sale. Any other activities. LayouUBuildingn/Ving Number: Al 1A12lNA Percentage of Actual Work Internal walls, Internal plaster, Floorings, Floors and windows wilhin Flats/Premises Fittino within the FlaUPremises Staircases, lifts Wells and Lobbies at each Floor level Overhead and plumbing and external plaster, elevation, completion of )fino of the Buildino/wino. 3 \* LayouuBuildingr/Wing Number: A{3414/NA (11 (21 (3) 1 Excavation 100.00 2 Basemenb (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 0.00 5 Stilt Floor 0.00 6 Slabs of SuDer Structure 0.00 Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 FlawPrmises 8 Sanitary Fittinq within the Flat/Premises 0.00 9 Staircases. lifts Wells and Lobbies at each Floor level Oveftead and 0.00 Underground Waler Tanks 10 Extemal plumbing and extemal plaster, elevalion, complelion of tenaces with 0.00 waterproofi ng of the Buildingnving. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ol environmenvoRz NOC, Finishing to entrance lobby/s, plinth protection,paving oi ffi areas appurtenant to Building/Vving, Compound Wall and all other requirements as may be required lo cornplete projec{ as per specifications in agreement oi Sale. Anv other activities. #prye)(tl att \#""Y Table B - Commgn Areas (lnternal and External Development Works) in respect of Registered Phase / Project Number) Sr.No ls Available (Yes / No) (1) (21 (3) (4) (5) 1 Internal Roads & Footpaths No 0.00 NA 2 Water Supply No 0.00 NA 3 Sewerage (Chamber, Lines, Septic Tank , STP) No 0.00 NA 4 Storm Water Drains No 0.00 NA 5 Landscaping & Tree Planting No 0.00 NA 6 Street Lighting No 0.00 NA 7 Community Buildings No 0.00 NA 8 Treatment And Disposal Of Sewage And Sullage Water No 0.00 NA I Solid Waste Management And Disposal No 0.00 NA '10 Water conservation /Rain water harvestino No 0.00 NA 11 Energy managemcnt No 0.00 NA 12 Fire protection and fire safety requirements No 0.00 NA Electrical meter room, sub-station, receiving station No 0.00 NA 't4 Aggregate area of recreational Open Space Yes 0.00 As per Proposed Plan 15 Open Parking No 0.00 NA Yours Faithfully AR. SWAPNIL SHROFF Signature & Name (lN BLOCK LETTERS) of L.S/ Architect ( License No: CAJ1996/206'10) Date of Certificate: Agreed and accepted by: .-^_Ur.=- Signature of Promoter Name: Unity Developers Date: