)6 uro .p tr_ $- Jtr -t\ archtLeces vrban ?lannea5 x3 _io tnxeftof deStqnefs a??fovea va tu ef5 Annexure B FORM 2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project Wise) Date: To. Sahakar JV Aurangabad, MAHARASHTRA,43I 001 Subject: Certificate of Cost Incurred for Development of PMAY U Tisgaon 225 A having MahaRERA Registration Number P51500079944 (Only Applicable after project Registartion) being developed by Sahakar JV Sir. l/We Surve Samarth Chandrakant have of Certifying Estimated Cost for PMAY U Tisgaon 225 A having MahaRERA Registiation Number P51500079944 (Only Applicable after project Registration, being developed by Sahakar JV ) 2.We have Estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & external works ofthe project as per specifications mentioned in agreements of sale. Our estimated cost calculations are bassd on the drawings/plans made available to us for the project under reference by the Developer / Consulatants. The Schedule of items and quantity required for the entire work as calculated by Quantity Surveyor" appointed by Developer/Engineer, the assumption ofthe cost of material,labour and other inputs made by developer,and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We estimate Total estimated the Cost of completion of thc aforesaid project under reference at Rs. 800393415.00 (Toial of Table A and B) at the time of Registration. The estimated Total Cost ofproject is with reference to thc Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal & external works,as per specifications mentioned in agreements of sale and for the purpose of the obtaining occupation certificate / completion certificate for the Building(s) /Wing(s)/ Layout /Plotted Developmenf from the Chhatrapati Sambhajinagar Municipal Gorporation being the Planning Authority under whose jurisidiction the aforesaid project is being implemented. 4.The Estimated Cost incured till date is calculated at Rs. 15009343.50 (Total of Table A and B).The amount of Estimated Cost incurred is calculated on the basis of input materials/services used and unit cost of these items. 5. The proportionate Complition of internal & external works, as per specification mentioned in agreement of sale, of the Project is estimated at Rs 785384071.50 (Total of Table A and B) 6. I certify that the Cost of the Civil, l\4EP and allied works the for the apartments and proportionate ate internal & exiernal works,as per specification mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: Table-A Building/ Plotted Development bearing Number :A1-A2/NA Particulars 1 Total Estimated Cost of the Buildingruingi Layout 90965700.00 Plotted Development as on date of Reqistration is 2 1364486.00 Cost incurred as on date of certificate 3 Work done in Percentaqe (as Percentaqe of the estlmated cost) 1.50 4 Balance Cost to be Incurred.*(Based on Estimated Cost) 89601214.00 5 Cost Incurred on the Ad d ition all Extra items not included in the 0 Estimated Cost (Table-C) Building/ Wing /Layout Plotied Number:43-A4/NA Particu lars 1 Total Estimated Cost of the Building/Wingi Layout 90965700,00 Plotted Development as on date of Reqistration is 2 1364486.00 Cost incurred as on date of certificate 3 Work done in Percenlaqe (as Percentaqe of the estimated cost) 1.50 /l Balance Cost to be Incurred.-(Based on Estimated Cost) 8960'1214.00 5 Cost Incurred on the Ad d ition a l/Extra items not included in the 0 Estimated Cost (Table-C) Building/ Wing Plotted Development bearing Number :A5-AOiNA Amount (ln Rs.) 1 Total Estimated Cost of the BuildingA/Ving/Layout 90965700.00 Plotted Develooment as on daie of Reqisiration is 2 1364486.00 Cost incurred as on date of certificate 3 Work done in Percentaqe (as Percentaoe of the estimated cost) 1.50 4 Balance Cost to be Incurred*"(Based on Estimated Costr 8960 1 21 4.00 5 Cost Incurred on the Ad d ition all Extra items not included in the 0 Estimated Cost (Table-C) Building/ Wing /Layout Plot'ted Development bearing Number :47-A8/NA Particu lars Amount (ln Rs.) 1 Total Estlmated Cost of the BuildingA,A/ing/Layout 90965700.00 Plotted Development as on date of Reoisiration is 2 4548285.00 Cost incurred as on date of certificate 3 Work done in Percentaqe (as Percentaoe of the estimated cost) 5.00 4 Balance Cost to be Incurred-*(Based on Estimated Cost) 86417 415.00 5 Cost Incurred on the Add itiona li Extra items not included in the 0 Eslimated Cost (Table-C) Building/ Wing /Layout Plotted bearing Number :A9-A1 0/NA . Sr. No. Total Eslimated Cost of the BuildingAffing/Layout 90965700.00 Plotted Development as on date of Reqistration is 2 1364486.00 Cost incurred as on date of certiflcate 3 Work done in Percentaqe (as Percentaoe ot the estimated cost) '1,50 4 Balance Cost to be lncurred**(Based on Estimated Cost) 8960'1214.00 Building/ Wing /Layout Plotted Development Number :A11-A12/NA si.'t'to. , 1 Total Estimated Cost of the Building^/Ving/Layout 90965700.00 P!9'tted Development as on date of Reqislratibn is 2 227 4142.50 Cost incurred as on date of certificate 3 Work done in Percentaoe (as Percentaqe of the estimated cost) 2.50 4 Balance Cost to be Incurred**(Based on Estimaied Cost) 8869'1557,50 5 Cost Incurred on the Add itiona l/Extra items not included in the 0 Estimaied Cost (Table-C) Building/ Plotted Development bearing Number :A'1 3-Al 4/NA 1 Total Estimated Cost of lhe Building/1/Ving/Layout 90965700.00 !lq!!ed Development as on date of Registratibn is Cost incurred as on date of certificate 1364486.00 3 lVork done in Percentaqe (as Percentaqe ofthe estimated cost) 1.50 4 Balance Cost to be Incuffed-"(Based on Estimated Cost) 89601214.00 5 Cost Incurred on the Add itional/Extra items not included in the 0 Estimated Cost (Table-C) /Layout Plotted bearing Number :A1 5-A16/NA Sr. Nc Pa11iculars 1 Total Estimated Cost of the BuildingAlVing/Layout 90965700.00 Plotted Development as on date of Reoistration is 2 13644B6.00 Cost incurred as on date of certificate 3 Work done in Percentaqe (as Percentaoe of the estimated cost) 1.50 4 Balance Cost to be lncurred"(Based on Estimated Cost) 89601214.00 5 Cost.lncurred on the Add ition a l/Extra items not included in the 0 Estimated Cost (Table-C) Table B Internal and External Development Works in respect of the Total Estimated Cost of the Cost Incurred on the Additional/Extra items not included in the Yours Faithfully SURVE SAMARTH CHANDRAKANT Signature & Name (lN BLOCK LETTERS) with Stamp of Engineer [Not Less than bachelor's Degree Holder or equivalent as per Scction 2(u) ofthc Act] Local Authority license no. (if appticabte) Date of Certificate: Agreed and Accepted by: / ,"J-'; ,.--ffie of Promoter Name: Sahakar JV Date: I .The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreemeni of sale. 2 (-) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor,whose certificate of In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (.) and in case quantity are being calculated by office of Engineer,the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (-). 3.(..) Balance Cost to be incurred (4) may vary from Difference beiween Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantiiy required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 4.AIl components of work with specifications are indicative and not exhaustive 5.Please specif,T if there are any deviations / qualifications. Example: Any deviations in input material used from specifications in agreement of sale. TABLE C List of Extra/Additional/Deleted ltems considered in Cost. (which were not part of the original Estimate of Total Cost)