aoa ",o ;_ fltr archttects c$ uroan ?lanner5 x) _io tnl,e(tor ae9t 4nef3 a??rovea valve.rs Annexure A FORM 1 [see Regulation 3l ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: lo' SAHAKAR JV AURANGABAD, MAHARASHTRA, 431001 Subject : Certificate of percentage of Work of completion of construction work of PMAY U Tisgaon 225 A having MahaRERA Registration Number P51500079944 (Only Applicable after project Registartion) being developed by SAHAKAR JV Sir. llr'Ve AR. SWAPNIL SHROFF have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of PMAY U Tisgaon 225 A having MahaRERA Registration Number P51500079944 (Only Applicable after project Registration, being developed by SAHAKAR JV ) Based on Site Inspection,with respeci to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certiflcate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A LayouUB g Number: A1-A2INA Sr. No. Tasks/Activity (1) (21 (3) 1 Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 0.00 tlL-.5 Stilt Floor 0.00 Slabs of Structure 0.00 /"1re c.r ,f -G nternal walls, Internal plasler. Floorings, Floors and windows within ..P:::.:-..1.. 0.00 ie ---.,a'1trn f within the FlavPremises 0.00 j-' \^., \1. '. -it" Il;i%t?ffiH lr"dx,h ;airrahdn cdldrry, elftan€ibad-5,{m.6J e$t .erc: ssoc rates$$9 @gmerl.com Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certiflcate) 9 Staircases, lifts Wells and Lobbies at each Floof level Overhead and 0.00 underqround Water Tanks 10 External plumbing and external plaster, elevation, compleUon of terraces with 0.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical flttings, mechanical equipment, compliance to conditions 01 envifonmenvcRZ NOC, Finishing to entrance lobby/s, plinth protection,paving oj areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement 01 Sale. Any other activities. ouUBu ilding/Wing Number: A3-A4/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) 1 Excavaiion 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structurd 0.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises B Sanrtary Fitting within the FlayPremises 0.00 9 Staircases. lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks '10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofi nq of the Building/wing. 1',] Installation of Lifts, water pumps, Fire Fighiing Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ol environmenUCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appuTtenant to Building^,^/ing, Compound Wall and all other requirements as may be required to complete poect as per speciflcations in agreement of Sale. Any other activities. LayouUBuilding/Wing Number: A5-A6/NA Internal walls, Internal plaster, Floorings, Floors and windows within Flats/Premises Staircases, lifts Wells and Lobbies at each Floor level Overhead and External plumbing and external plaster, elevation, completion of terraces wlth waterDroofi no of the Buildino/wino. Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as t CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions environmenUCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving areas appurtenant to Building^/Ving, Compound Wall and all other requiremel as may be required to complete poect as per specifications in agreement ildingn/Ving Number: A7-A8/NA Percentage of Actual Work Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) 1 Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 PIinth 000 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 Internal walls, Internal plasier, Floorings, Floors and windows within 0.00 Flats/Premises 8 Sanitary Fitting within the FlaUPfemises 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Ovefheao ano 0.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofing of the Building/wing. 11 Installation of Lifts. water pumps. Frre Frghting Fittings and Equipment as per 0.00 CfO NOC, Electrical fittings, mbchanical etuipment, compliance td condrtions ol environmenVCRZ NOC, Finishing to entrance lobby/s, plinth protection,paving ol areas appurtenant to Building^,A/ing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreemeni of Saie. Anv othei activrties. LayouUBuild ng Number: A9-A1o/NA Sr. No, Tasks/Activity Percentage of Actual Work Done (As on date of the Certificaie) (2) (3) Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises B Sanitary Fitting wirhin the Flat/Premrses 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underoround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterprooflng of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equiprnent, compliance to conditions ol environment/CRZ NOC, Finishing to entrance obbyis, plinth protection,paving o1 areas appurtenant to Building^Ning, Compound Wall and all other requirements as may be required to complete project as per speciflcations in agreement ol Sale. Any other activities. LayouUB u ild in g/Win g Number: A11-A12lNA lnternal walls, Internal plaster, Floorings, Floors and windows within Flats/Premises Staircases. lifts Wells and Lobbies at each Floor level Overhead and Underoround Water Tanks External plumbing and external plaster, elevation, waterorooflno of the Buildino/wino- .t f:- -/(\ d., a.-a \{ .Yr Sr. No. Tasks/Activity Percentage of Actual Work Done fAs on date of the CertiJlcate) 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electriial fitting:, mbchanical equipment, compliance to conditions ol NOC, Finishing to entrande lobby/s, pInth pfotectron paving ol ' areas appurtenant to Buildingnn/ing, Compound Wall and all other fequlrements "nuironmiiruCRz is m"v'[," required to comFlete iroject as per specrflcations rn agreement ol Sale. Any other activities LayouUBuilding/Wing Number: A1 3-A14/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) '100.00 1 Excavation 2 Basements (if any) 0.00 3 Podrums (if any) 0.00 4 Plinth, 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 0.00 7 lnternal walls, Internal plaster, Floorings, Floors and windows within 0.00 Flats/Premises B Sanitary Fitting within the FlaVPremises 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks '10 External plumbing and external plaster, elevation, completion of terraces with 0.00 waterproofino of the Burlding/wing 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CfO lOc, Electriial litting!, mbchanrcal equipment, compLrance to conditions ol Jnuironr"hvCnz NOC, Finishing to entranae lobby/s, plinth protectron, paving ol areas appurtenant to Building/Vving, Compound Wall and all other requrfements is m"v'le required to comflete irolect as per specifications In agreement ol Sale. AnV other activilies. -avouUBu itd N umber: A15-A16/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) {2\ (3) (1) 100.00 1 txcavalon Basements (if any) 0.00 2 0.00 3 Podiums (if any) Plinlh 0.00 4 0.00 5 Stilt Floor 0.00 6 Slabs of Super Structure 7 lnternal walls, lnternal plaster, Floorings, Floors and windows within 0.00 Flats/Premises 0.00 B Sanitary Fitting within the Flat/Premises I St"ir""""", lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks 10 -Exte.mal plumbing and external plasier, elevation, completion of terraces with 0.00 waterprodfing of the Building/wing. 11 lnstallation of Lifts, water pumps, Fire Frghting Fittings and Equipment as per 0.00 Cio No-C, Erectiiiar nttingi, mbchanical e-qurpment, cbmpliance to.conditions of enui.nm";VCRZ NOC, F;ni;hing to entrance lobby/s, plinth protection'paving of areas appurtenant to Building/Wing, Compound Wall and all other requrrements as may 6e required to complete project as per speclllcatrons ln agrFemenl ol sate. Anv otnei activities. ,,---3 a]!>:=- .y'6lryi-- b\7)'' j{r')'l *l /. \s:i#dl Table B - Common Areas (lnternal and External Development Works) in respect of Registered Phase / Project Number) Sr.No Details (1) (21 (3) (4) (s) 1 lnternal Roads & FootDaths No 0.00 NA 2 Water Supply No 0.00 NA 3 Sewerage (Chamber, Lines, Septic Tank , STP) No 0.00 NA Storm Water Drains No 0.00 NA 5 Landscaping & Tree Planting No 0.00 NA 6 Street Lighting No 0.00 NA 7 Community Buildings No 0.00 NA 8 Treatment And Disposal Of Sewaqe And Sullage Water No 0.00 NA 9 Solid Waste l\ilanagement And Disposal No 0.00 NA '10 Water conservation /Rain water harvestino No 0.00 NA 11 Energy managemcnt No 0.00 NA 12 Fire protection and fire safetv requirements No 0.00 NA Electrical meter room, sub-station, receivinq station No 0.00 NA 14 Aggregate area of recreational Open Space Yes 0.00 As per Proposed Plan 15 Open Parking No 0.00 NA Yours Faithfully AR. SWAPNI[ SHROFF ( License No: CA,/1996/20610) Date of Certificate: Agreed and accepted by: <.^!=9 Signature of Promoter Name: Sahakar JV Date: