P IYUSH BHAVSAR&ASSOCIATES ARCHITECTS INTERIOR DESIGNERS LANDSCAPEDESIGNERS add - B-No-T8,DashmeshviharCo-opHosingsociety,Devanagr,Shanoorwadi,Arangabad Email :- scalearchitectslab@gmail.com  :- +91 9766455187 DATE-22/10/24 FORM 1 [SEERegulation 3l ARCHITECT’S CERTIFICATE (To be submitted atthe time of Registrationof Ongoing Projectand for withdrawalof Money fromDesignatedAccount) DHANVANTARI BUILDERS & DEVELOPERS Plot No.18, Gut No.129, Beed By Pass Road, Hotel Nandini, Yashwant Nagar, Aurangabad, Maharashtra 431005. Certificate of Percentage of Completion of Construction Work of PUNDALIK Subject: HEIGHTShaving MahaRERA RegistrationNumberNA being developed by DHANVANTARI BUILDERS & DEVELOPERS. Sir, I Piyush Sunil Bhavsarhave undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of having MahaRERA Registration NumberNAbeing developed by DHANVANTARI BUILDERS & DEVELOPERS. Based on Site inspectionwith respect to Layout / each of theoftheaforesaidRealEstate Project. I certify that as on the date of thiscertificate, the Percentage of Work done for eachofthe building/Wing of the RealEstateProject under MahaRERA is as per Table A herein below. Percentageofthe work executed with respect to each of the activity of the entire phase is detailed in Table B TABLE-A (Tower I) Sr Tasks / Activity Percentage of Actual No (2) Work Done (1) (As on date of this Certificate) (3) 1. Excavation 0.00 2. Basement’s (if any) 0.00 3. Podiums (if any) 0.00 4. Plinth 0.00 5. Stilt Floor 0.00 6. 3 Slabs of Super Structure 0.00 7. Internal walls, Internal Plaster, Floorings, I) doors 0.00 and windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises 0.00 9 Staircases. lifts’ Wells and Lobbies at each Floor 0.00 level Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0.00 completion of terraces with waterproofing of the Building/wing. 11 Installation of Lifts. Water pumps, Fire Fitting 0.00 Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, and compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-A (Tower II) Sr Tasks / Activity Percentage of Actual No (2) Work Done (1) (As on date of this Certificate) (3) 1. Excavation 100.00 2. Basement’s (if any) 100.00 3. Podiums (if any) 0.00 4. Plinth 0.00 5. Stilt Floor 0.00 6. 3 Slabs of Super Structure 0.00 7. Internal walls, Internal Plaster, Floorings, I) doors 0.00 and windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises 0.00 9 Staircases. lifts’ Wells and Lobbies at each Floor 0.00 level Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0.00 completion of terraces with waterproofing of the Building/wing. 11 Installation of Lifts. Water pumps, Fire Fitting 0.00 Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, and compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B Common Areas (Internal and External Development Works) in respect of the Registered Phase/Project Number Sr Common areas and facilities Proposed Percentage Details No (Yes/No) of Actual (1) (2) (3) Work Done (5) (As on date of the Certificate) (4) 1. Internal Roads & Footpaths No NA - 2. Water Supply Yes 0.00 As per Plan 3. Sewerage (Chamber, lines, Septic Yes 0.00 As Per