Anaerure A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Dale:07-08-2024 To, SRIJAY BUILDERS, PLOT NO 154, VEER SAWARKAR NAGAR, N.5 SOUTH CIDCO, AUM'{GABAD Subject: Certificate of Percentage of Completion of Construction Work of FORTUNE SKYLINE having MahaREM Registration Number NEW PRoJECT being developed by SRIJAY BUILDERS. Sir, I / We MAN0J KALA & ASSOCIATES have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of F0RTUNE SKYLINE having MahaRERA Registration Number NEW PRoJECT being developed by SRUAY BUILDERS. Based on the Site Inspection, with respect to the Layout / each BuildingMing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the BuildingMing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE-A Layout / Building / Wing Number for F0RTUNE SKYLINE s. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) t2l (3) I Excavation lYo X number of Basement(s) and Plinth Oo/o 3 X number of Podiums 4 Stilt Floor 1Yo X number of Slabs of Super Structure 1Yo 6 lnternal walls, lnternal Plaster, Floorings within 0o/o Flats/Premises, Doors and Windows to each of the FlaVPremises 7 Sanitary Fittings within the Flat/Premises, Electrical lYo Fittinqs within the FlaVPremises I Staircases, Lifts Wells and Lobbies at each Floor level 0o/o connecting Staircases and Lifts, Overhead and Underoround Water Tanks. I The external plumbing and external plaster, elevation, 0o/o completion of terraces with waterproofing of the BuildingM/ing 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 0o/o and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildinglWing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE.B Common Areas (lnternal & External Development Works) for F0RTUNE SlffLlNE S. No. Common Areas & Facilities Proposed Percentage Details (Yes / N0) of actual Work Done (As on date of Certificate) (t) (21 (3) (4) (5) 1 lnternal Roads & Footpaths NO N.A. 2. Water Su0Dly YES 100 trom Bore-Well Sewerage (Chamber, Lines, Septic YES 0o/o Drainage Line till CSMC Line Tank, STP) 4. Strom Water Drains NO N,A, A Landscaping & Tree Planting YES 00k )nternd Project Tree Plantation 6. Street Liqhtinq YES 00k lnternal Proiect Street Liqhts 7. Community Buildinos NO N.A. Treatment & Disposal of Sewage and NO N,A. Sullaqe Water L Solid Waste Manaoement & Disoosal NO N.A. 10. Water Conservation / Rain Water YES 0o/o Rain Water Harvesting as per Harvestino norms 11. Enerov Manaqement NO N.A. 12. Fire Protection & Fire Safety YES 0Vo As per FIRE norms requirements 13. Eleckical Meter Room, Sub-Station, YES 0o/o As per MSEB norms Receivinq Slation 14. 0thers (Option to Add more) NO N.A. Yours faithfully, Tor MANOJ IGLA & ASSOCIATES, '!" * 'oA q1}Ii Signature & Name (lN BLoCK LETTERS) of Land Surveyor / Architect License Number CA / 96 / 19597 Agreed & Accepted by: Name: SRIJAY BUILDERS Date: 07-08.2024