t" ARCH BRIJMOHANSINGH THAKUR H.NO.2.9.101, NAZAR LALLII, TILAK PATH, CHHATRAPATI SAMBHAJI NAGAR Annernrre A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of ongoing project & for withdrawal of Money from Designated Account) Date: 04-10-2025 To, PREM INFRASTRUCTURES, SHOP NO 8, NAIK PLAZA, VASANT NAGAR, JAWAHAR COLONY, AURANGABAD Subject: Certificate of Percentage of Completion of Construction Work of P-9 VILLAS having MahaREM Registration Number p5i500078512 being developed by pREM INFRASTRUCTURES. (For JUL to SEp 2025 eTR) Sir, I / We ARCH BRIJMOHANSINGH THAKUR have underlaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of P-9 VILLAS having MahaRERA Registration Number P515000785,l2 being developed by PREM TNFRASTRUCTU RES. Based on the Site lnspection, with respect to the Layout / each BuildingMing of the aforesaid Real Estate Project, I certify that.as on date of this certificale, the percentage of work Done for each of the BuildingflVing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire phase is detailed in Table-B. TABLE-A Number P-9 VILLAS S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Certificate) 0) .-.(2) (3) 1 Excavation 100Y0 2 X number of Basement(s) and Plinth 100% 3 X number of Podiums 4 Stilt Floor 5 X number of Slabs of Super Structure 100o/o 6 lnternal walls, lnternal Plaster, Floorings within 100% Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlaVPremises, Electrical Fittings 80% within the FlaVPremises PiEI' PEOPRIEIOR ARCH BRIJMOHANSINGH THAKUR H.NO.2-9-101, NAZAR LALLII, TILAK PATH, CHHATRAPATI SAMBHAII NAGAR I Staircases, Lifts Wells and Lobbics at each Floor level 800/o connecting Staircases and Lifts,Overhead and Underground Water Tanks. I The external plumbing and external plaster, elevation, 80% completion of terraces with waterproofing of the B u ild in gArV in g 10 lnstallation of lifts, water pumps, Fire Fighting Fittings and 7 5o/o Equipment as per CFO N0C, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ N0C, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as mav be required to Obtain Occupation /Coqtp!e!iq!-q94{Eq!e TABLE.B Common Areas (lnternal & External Development Wor!$E9 tt!1149 S. No. Common Areas & Facilities Proposed Percentage Details (Yes / N0) ol actual Work Done (As on date of Certificate) 1 (2\ (3) (4) (5) 1. Internal Roads & Footpaths NO N.A. 2. Water Supplv YES 7 Sa/a FROM BORE-WELL 3. Sewerage (Chamber, Lines, SePtic YES 650/o DMINAGE LINE TILL Tank, STP) CORPORATION LINE 4. Strom Water Drains NO N.A. Landscapinq & Tree Planting NO N.A. 6. Street Liqhtinq NO N.A. 7. Community Buildings NO N.A. 8. Treatment & Disposal of Sewage and NO N.A. Sullaqe Water o Solid Waste Manaqement & Disposal NO N.A. 10. Water Conservation / Rain Water YES 65% RAIN WATER HARVESTING Harvestinq AS PER NORMS 11 Energy Management NO N.A, 12. Fire Prolection & Fire Safety NO N.A. requirements 13. Electrical Meter Room, Sub-Station, NO N.A. Receivino Station 14. others (Option to Add more) NO N.A, / ARCH BRIJMOHANSINGH THAKUR H. NO.2-9-101, TILAK PATH, CHHATRAPATI SAMBHAJI NAGAR / Yours faithfully, ARCH BRIJMOHANSINGH THAKUR Signature & Name (lN BLOCK LETT€RS) of Land Su rveyor License Number ( _) Aoreed & Acceoted bv: ttEta rr;l^lsrrucn nEs PROPRIETOR Signature of Promoter Name: PREM INFRASTRUCTURES Date: 04-10-2025