NANASAHEB D. ZAREKAR B.E.(CIVIL) Consulting Engineer (Regd. No. DDMCB/R/2024/APL/01807) Office: Ground Floor, Plot No 177, CIDCO, WalujMahanagar - 2, Chh. Sambhajinagar. Mo.No.9146116777 FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE Date: 16.07.2026 To, M/s SaiShraddha Builders through Pro. Sajansing M Jarwal, Plot No 177, Waluj CIDCO Mahanagar-2, Tisgaon, Chhatrapati Sambhajinagar (Aurangabad) 431136. Subject: Certificate of Percentage of Completion of Construction Work of "Tirupati Vastu NX" having MahaRERA no. PS 1500077292, being developed by M/s Sai Shraddha Builders. Sir, Uwe Nanasaheb D Zarekar have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of the "Tirupati Vastu NX" having MahaRERA no. P51500077292, being developed by M/s Sai Shraddha Builders. Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certifythat as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per table A herein below. The percentage of the work executed with respect toeach of the activity of the entire phase detailed in the Table B. Table A Building- A Sr. No Task/Activity (2) Percentage of actual work done (1) (As on date of certificate) 1 Excavation 100 2 Basements NA 3 Podiums NA 4 Plinth 100 Stilt Floor 100 6 Slabs of Super Structure 100 7 Internal walls, Internal Plaster, Floorings, Door, Window within 100 Flats/Premises. Sanitary Fittings within the Flat/Premises 100 9. Staircases, Lifts Wells and Lobbies at each 60 Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 10. external plumbing andexternal plaster, Elevation, completion of terraces with waterproofing of the Building/Wing, EKAR 95 ultingChilEn 1J. Installationof lifts, water pumps, Fire Fighting Fittings and Equipment 60 as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of cnvironment ICRZ NOC, finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Comnpletion Certificate Table A Building- B Task/Activity (2) Percentage of actual work Sr. No done (1) (As on date of certificate) Excavation 100 1, 2. Basements NA Podiums NA 3. 4. Plinth 100 5 Stilt Floor 100 Slabs of Super Structure 70 6. 7 Internal walls, Internal Plaster, Floorings, Door, Window within 40 Flats/Premises. 8 Sanitary Fittings within the Flat/Premises 05 9 Staircases, Lifts Wells and Lobbies at each 30 Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 10. external plumbing andexternal plaster, Elevation, completion of terraces with waterproofing of the Building/Wing, 11. Installation of lifts, water pumps, Fire Fighting Fittings and Equipment 0 as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of other areas appurtenant to Building/Wing, Compound Wall and all requirements as may be required to CObtain Occupation /Completion Certificate Table A Building- C Sr. No Task/Activity (2) Percentage of actual work done (1) (As on date of certificate) Excavation 100 1. Basements NA 2. Podiums NA 3. Plinth 100 4. 100 5. Stilt Floor 100 6. Slabs of Super Structure 100 7. Internal walls, Internal Plaster, Floorings, Door, Window within Flats/Premises. Sanitary Fittings within the Flat/Premises 100 8. Staircases, Lifts Wells and Lobbies at each 100 9. ASAHEG Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 10. external plumbing and external plaster, RegdNo. 100 Elevation, completion of terraces with waterproofing of the DOMC BIRZ02uo Building/Wing, APLO1807 Sulting Cvil 11. Installation of lifts, water punmps, Fire Fighting Fittings and Equipment 100 as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment ICRZ NOC, finishing toentrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Common Areas (Internal & External Development Works) in respect of the Registered Phase / Project Number Common areas and Facilities Proposed Percentage of Details Sr. No. (Yes/No) Actual Work Done (1) (2) 22 22 (3) (4) (5) Internal Roads & Footpaths No NA 2. Water Supply Yes 00 As per CIDCO 3 Sewerage (Chamber, Yes 00 As per CIDCO Lines, Septic Tank, STP). 4 Storm Water Drains No NA S. Landscaping & Tree Planting Yes 00 6 Street Lighting No NA 7 Community Buildings No NA 8 Treatment and disposal of sewage and No NA sullage water. 9 Solid Waste management & No NA Disposal 10. Water conservation/ Rain water No NA harvesting 11. Energy management No NA 12. Fire protection and fire safety No NA requirements NA 13. Electrical meter room, sub-station, No receiving station. Others (Option to Add more). No NA 14. Yours Faithfully NAME OF ARCHITECT Regd, No. DOMCBR202420 APLI01307 Er. Nanasaheb D Zarekar Rsuiting) Cui (Reg.No. - DDMCB/R/2024/APL/01807) Accepted by: 0DHA DS M/s Sai Shraddha Builders through Pro. Sajansing M Jarwal