D2 ARCHITECT'S & INTERIOR DESIGNOR'S .GANRAJ", PLOT NO 3 & 4, GAJANAN COLONY, GARKHEDA, AURANGABAD Annexure A EORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Dale 01-07-2024 To, MADHURA LAND OEVELOPERS, PLOTNO21, NATH NAGAR, OPP. SBOASCHOOL, JALGAON ROAD, AURANGABAD Subject: Certificate of Percentage of Completion of Construction Work of MADHURA SAI ARCH having MahaRERA Registration Number NEW PRoJECT being developed by MADHURA LAND DEVELOPERS. Sir, l/ We D'?ARCHITECT'S & INTERIOR DESIGN0R'S has undertaken assignment as Architect / Lrcensed Surveyor of Certifying Percentage of Completion of Construction Work of MADHURA SAI ARCH having MahaRERA Registration Number NEW PRoJECT being developed by MADHURA LAND DEVELoPERS. Based on the Site lnspection, with respect to the Layout / each Euilding/Wing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the BuildingMing of the Real Estate Project under MahaREM is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE-A Bu Wino Number A Bui s. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 100o/o 2 X number of Basement(s) and Plinth lOOo/o 3 X number of Podiums 4 Stilt Floor X number of Slabs of Super Structure Oo/o 6 lnternal walls, lnternal Plaster, Floorings within Oo/o Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the FlaUPremises, Electrical lYo Fittinqs within the FlaVPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0o/o connectinq Staircases and Lifts, Overhead and D2 ARCHITECT'S & INTERIOR DESIGNOR'S .GANRAJ", PLOT NO 3 & 4, GAJANAN COLONY, GARKHEOA, AURANGABAD Underground Water Tanks. I The external plumbing and external plaster, elevation, Oo/o completion of terraces with waterprooflng of the BuildingMing 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 0o/o and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wng, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifi cate TABLE-A Number B Bui S. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (21 (3) 1 Excavation lOOo/o 2 X number of Basement(s) and Plinth 1O0o/o X number of Podiums 4 Stilt Floor 5 X number of Slabs of Super Structure lYo 6 lnternal walls, lnternal Plaster, Floorings within lYo Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlauPremises, Electrical 0o/o Fittings within the FlauPremises I Staircases, Lifts Wells and Lobbies at each Floor level 0o/o connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, Oo/o completion of terraces with waterproofing of the BuildingM/ing 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 0Yo and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate D2 ARCHITECT'S & INTERIOR DESIGNOR'S "GANRAJ", PLOT NO 3 & 4, GAJANAN COLONY, GARKHEDA, AURANGABAD TABLE.A Bu ild i Number C Tvoe Buildi s. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) l2l (3) 1 Excavation lOOo/o 2 X number of Basement(s) and Plinth 100% 3 X number of Podiums 4 Stilt Floor t X number of Slabs of Super Structure 5Oo/o 6 lnternal walls, lnternal Plaster, Floorings within Qo/o Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 0% Fittinqs within the FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level 1Yo connecting Staircases and Lifts, Overhead and Underqround Water Tanks. 9 The external plumbing and elternal plaster, elevation, 0%o completion of terraces with waterproofing of the BuildingMing 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 0o/o and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifi cate TABLE-A Number D Bui S. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 100% .) X number of Basement(s) and Plinth 100% J X number of Podiums 4 Stilt Floor 5 x number of Slabs of Super Structure 100o/o 6 lnternal walls, lnternal Plaster, Floorings within 40o/o FlatsiPremises, Doors and Wndows to each of the Flat/Premises 7 Sanitary Fittings within the FlaVPremises, Electrical 0 Fittinqs within the FlaUPremises D2 ARCHITECT'S & INTERIOR DESIGNOR'S "GANRAJ", PLOT NO 3 & 4, GAJANAN COLONY, GARKHEOA, AURANGABAD a Staircases, Lifts Wells and Lobbies at each Floor level lYo connecting Staircases and Lifts, Overhead and Underground Water Tanks. I The external plumbing and external plaster, elevation, 0o/o completion of terraces with waterproofing of the BuildingM/ing 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 0o/o and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifi cate TABLE-A Winq Number E T S. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (2) (3) 1 Excavation l OOo/o 2 X number of Basement(s) and Plinth 100o/o 3 X number of Podiums 4 Stilt Floor 1Yo ( X number of Slabs of Super Structure Oo/o o lnternal walls, lnternal Plaster, Floorings within 0o/o Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPiemises, Electrical 0o/o Fittings within the FlaUPremises I Staircases, Lifts Wells and Lobbies at each Floor level 0o/o connecting Staircases and Lifts, Overhead and Underground Water Tanks. o The external plumbing and external plaster, elevation, 0o/o completion of terraces with waterprooflng of the BuildingA&ing 10 lnstallation of lifts, water pumps, Fire Fighting Fittings lYo and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingAruing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifi cate D2 ARCHITECT'S & INTERIOR DESIGNOR'S .GANRAJ", PLOT NO 3 & 4, GAJANAN COLONY, GARKHEDA, AURANGABAO TABLE.B Common Areas (lnternal & External Development Works) for A-B-G- D- E T S. No. Common Areas & Facilities Proposed Percentage of Details (Yes / N0) actual Wo* Done (As on date of Certificate) 1 (2) (3) (4) (5) 1 lnternal Roads & Footpaths Yes 0Vo As per Drawino 2. Water Supplv Yes 100k From Bore-Well J. Sewerage (Chamber, Lines, Septic Yes 0o/o Drainage Line till CIDCO Line Tank, STP) 4. Strom Water Drains No N. A. 5. Landscapinq & Tree Plantinq Yes 0lo lnternal Project Tree Plantation 6. Street Lighting Yes 0o/o lnternal Proiect Street Liohtino 7. Community Buildings No N. A, 8. Treatment & Disposal of Sewage and No N. A. Sullaoe Water 9. Solid Waste Manaqement & Disposal No N, A. '10. Water Conservation / Rain Water Yes 00k As per Rain Water Harvesting Harvesting Norms 11 Energy Managemenl No N, A. 12. Fire Protection & Fire Safety No N, A. requirements 13. Electrical Meter Room, Sub-Station, Yes 0o/o As per MSEB Norms Receivino Station 14. 0thers (Option to Add more) No N. A. Yours faithfully, For D2 ARCHITECT,S & INTERIOR DESIGNOR,S Mr. Dhananjay B. Doifode (B.Arch, M.Arch) cA/2013/60839 "Ganra)'P,No.3 & 4, calanan Colony, Aurangabad ARCH. DHANAJAY DOIPHODE Signature & Name (lN BLOCK LETTERS) of Land Surveyor / Architect License Number : CA / 20,l3 / 60839 Agreed & Accepted by: ,5R,\t {g( ,trr"M Name: MADHUM LAND DEVEL0PERS Date:01-07-2024 \#